MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
__
9 TITLE DOCUMENT CONTROL U
C NUMBER DAP-1 I Revision Prepared Date Reviewed Date Approved Date I
ff f Sf l i
?MM f 4 A e s- g.g %/g'@ /o/24y O
l p8872=M
=~%s CON ROLLED COPY (10. 33 - -Q y{ ~
TN-85-6262/l I i
TABLE OF CONTENTS Section page C ov e r S h ee t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i T ab le o f Con t e n t s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ij l.0 P U RP OS E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . l 2.0 SCOPE..................................................... l 3.0 DEFINITIONS AND RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . I 4.0 I NS T R U CT I ON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 5.0 DO CU ME NT AT I ON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1
l TN-85-6262/l I il l
l
COMANCE PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURE
, Number: DAP-Il
Title:
DOCUMENT CONTROL Revision: 1 0
l.0 PURPOSE This procedure sets forth those measures necessary to control the issuonce of DAP-originated documentation so that these documents, including changes, are reviewed for odequocy and approved for release by authorized personnel and are distributed to oppropriate personnel.
2.0 SCOPE This procedure opplies to DAP-originated documents and is not applicable to documents obtained from other sources. The DAP-originated documents are of three types: DAP Procedures and Instructions, Correspondence, and DAP Documentation. Control of DAP Procedures and Instructions is defined in Section 4.I. Project communications are controlled per Section 4.2, "Corres-v pondence Control." The scope of Correspondence Control includes incoming, outgoing, and internal correspondence. The requirements for DAP Documento-tion are defined in Section 4.3. This procedure does not include Records Requirements which are defined in DAP-I4. t 3.0 DEFINITIONS AND RESPONSIBILITIES 3.I Definitions 3.I.I CPRT Centrol Files The CPRT Centrol Files are under the control of the CPRT Program Director and will eventually serve os full documentation of CPRT octivities and conclu-sions.
j
) TN-85-6262/l i Page I of 6 l
COMANCif PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURE 4
Number: DAP-1I
Title:
DOCUMENT CONTROL Revision: I C l l
3.1.2 General DAP File and Discipline Files !
The general DAP File contains information generically relevant to the Design Adequocy Program. Such documentation includes generic correspondence and generic source and reference material. This file is routinely accessed and ougmented during the course of the review. The Discipline Files contain the completed work of the DAP disciplines and relevant source documentation reviewed by the DAP. These files are " working files" within the context of the CPRT Program Plan until transfer to the CPRT Centrol File.
3.l.3 DSAP Working Files The Working Files for each Discipline Specific Action Plan contain in process documentation relevant to the specific DSAP. Such documentation includes source and reference material relevant to the DSAP, DSAP specific correspon-I dence, and documents generated by the DSAP (e.g., engineering evoluotions, calculations, checklists, inspection reports, etc.) These files are routinely occessed and augmented during the review process. Upon completion, DAP documentation contained in a working file is transferred to the oppropriate j discipline file in occcrdance with DAP 14, 3.2 Responsibilities '
3.2.1 Review Team Leoder i
The Review Team Leoder maintains overall responsibility for the DAP File and the Discipline Files and ensures that the files meet CPRT Program Requirements.
TN-85-6262/l i Poge 2 of 6
COMANCFE PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURE Number: DAP-i l
Title:
DOCUMENT CONTROL Revision: I (J
3.2.2 Design Adequacy Program Manager The DAP Monoger oversees the development, implementation, and maintenance of the DAP documentation system. He shall control, or cause to be controlled, documentation in accordance with this procedure. He also controls the General DAP File and the Discipline Files.
3.2.3 Discipline Coordinators Discipline coordinators control the working files for their respective disciplines.
3.2.4 DAP Reviewers All reviewers are responsible for ensuring that their work is in compliance with S this procedure.
4.0 INSTRUCTION 4.1 DAP Procedures and Instructions DAP Procedures shall be issued by the DAP Manager in a controlled manner. As a minimum, the DAP Manager shall maintain o list of personnel to whom controlled copies of DAP Procedures have been issued. The distribution of DAP Procedures shall be occompanied by a receipt ocknowledgement that shall be signed and returned to the DAP Monoger ( or his designee) by the person to whom the controlled copy of the procedure is sent. When revisions to DAP Procedures are issued, the DAP Monoger (or his designee) shall distribute copies to all personnel listed as holding a controlled copy. Eoch controlled DAP Procedure copy shall be clearly indicated as such on the cover sheet and the cover sheet shall securely bound the procedure.
C TN-85-6262/l i Page 3 of 6
COMANCIE PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURE Number: DAP-li
Title:
DOCUMENT CONTROL Revision: I v
9 Discipline Instructions prepared in accordance with DAP-10 shall be controlled by the responsible discipline coordinator in a manner similar to the requirements for DAP Procedures.
Uncontrolled copies of DAP Procedures and Discipline Instructions may be made by the DAP Monoger or others. When uncontrolled copies are mode, the indication of control (e.g., control copy number) shall be crossed out or otherwise marked and the word " uncontrolled" shall be typed, stomped, or written on the cover page. The cover page, so marked, shall be securely bound to the procedure.
4.2 Correspondence Control DAP-related correspondence encompasses incoming, outgoing, and internal cor-respondence. The DAP manager shall implement the controls required by 4.2.1 C and 4.2.3.
4.2.I Outgoing Correspondence Internci distribution for all outgoing correspondence (including letters of trans-mittal or receipt ocknowledgement) shall include the DAP file and other files as i
oppropriate. The author shall designate to which file (s) the document should be distributed. All outgoing correspondence shall be assigned a log number in the l form:
DAP-L-XXX o o Sequential Nmber i Letter l
This log shall be maintained by the DAP Manager or his designee.
TN-85-6262/l l Page 4 of 6 i
COMANCtf PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURE Number: DAP-1I
Title:
DOCUMENT CONTROL Revision: I v
,o i
\s' 4.2.2 Incoming Correspondence The person receiving incoming project-related correspondence shall routinely route the original to the responsible administrative assistant for filing in the oppropriate correspondence file. The oddressee shall indicate to the odministro-tive assistant, os applicable:
o The opplicable DAP and DSAP Working Files o Internal distribution.
The responsible administrative assistant routinely processes incoming correspon-dence routed to them by the oddressee. This includes copying, distribution, and filing.
4.2.3 Internal Correspondence Internal correspondence includes explanatory memos for the information or training of project personnel, notes to file to document assignment of responsi-bility or other necessary information, and the exchange of technico! informaticn among DAP reviewers.
The distribution of internal project-related correspondence .'holl include the appropriate DAP and DSAP correspondence files. DAP memorando offecting
- internal interfaces or requests for action shall be assigned a log number in the form
DAP-M-XXX o o
_ Sequential Number 5.rsw.dc )
l i
TN-95-6262/l l Page 5 of 6
i i
COMANCHE PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURE Number: DAP-i l
Title:
DOCUMENT CONTROL Revision: I t
i v
The DAP Monoger (or his designee) shall establish and maintain a log and file for memorando. Log numbers are required only for memos offecting interfoces, or requiring action, or responding to other action memos.
gg 4.3 DAP Documentation 4.3.1 Source and Reference Material During the review process, source and reference materio! may be received from TUGCO or other organizations which constitute technical input to the DAP or specific DSAPs. This documentation shall only be filed in occordance with DAP-14 and no logs or control copy numbers need be applied. The discipline coordinators shall determine that reviews are conducted using source and reference material oppropriate for the reviews.
4.3.2 DAP-Produced Documents The DAP will produce documents such as checklists and reports in occorance with other DAP Procedures. These documents shall receive identification numbers in occordance with those procedures and shall be filed in occordance with DAP-14. Controlled distribution of these documents is not required. b 5.0 DOCUMENTATION 5.1 L_ogs The DAP Monoger (or his designee) shall maintain all logs required by this procedure except for the Discipline Instruction Logs which shall be maintained by the discipline coordinators. The DAP Monoger may subdivide the logs through the use of mechanisms such as separate logs for Berkeley, Bethesdo, and on-site pre-ossigned blocks of log numbers, or any other mechanism he deems oppropriate.
e TN-85-6262/ll Pooe 6 of 6