I I

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL 1

r REVISION 9 i

J 4

i i

i 1

i N Madf N N

Date: 4/2Y[97 Prepared By:

EngineerihgProgr6mdupervisor s

Approved By:

Date: CM9 Manager. Technical Support 4

Approved By:

b^ ^

Date: b-U*-97 Plant Ma' nager 9707030196 970626 PDR ADOCK 05000445 P

PDR

m..

m COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2

~

INSERVICE VALVE TESTING PLAN TABLE 9 - MAIN STEAM PAGE 3 0F 12 Test Parameters / Schedule Flow Valve /

Safety Fail Position valve Diagram Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator Ntsnber Koord. )

Type 51zg (1111 cory 11gn_

Pos.

1251 Test 1221 1251 Rmarks NS-0093 M1-0202.

SF/SA 6

2 C

A 0/C N/A SRV/

N/A PIT /

Overpressure Protection &

(C-1)

X SYR 2YR Steam vent Flowpath (for M2-0202 B

(1) residual heat removal)/

(C-1)

Steam Line Isolation &

Containment Isolation MS-0094 M1-0202 SF/SA 6

2 C

A O/C N/A SRV/

N/A PIT /

Overpressure Protection &

(C-11 X

SYR 2YR Steam vent Flowpath (for M2-0202 8

(1) residual heat removal)/

(C-1)

Steam Line Isolation &

Containment Isolation MS-00%

M1-0202 SF/SA 6

2 C

A 0/C N/A SRV/

N/A PIT /

Overpressure Protection &

(0-1)

X SYR 2YR Steam Vent Flowpath (for M2-0202 8

(1) residual heat removal)/

(D-1)

Steam Line Isolation &

Containment Isolation MS-00%

M1-0202 SF/SA 6

2 C

A 0/C N/A SRV/

N/A PIT /

Overpressure 8rctection &

(D-1)

X SYR 2YR Steam Vent Flowpath (for M2-0202 8

(1) residual heat removal)/

(D-1)

Steam Line Isolation &

Containment Isolation MS-0097 M1-0202 SF/SA 6

2 C

A 0/C N/A SRV/

N/A PIT /

Overpressure Protection &

(E-1)

X SYR 2YR Steam Vent Flowpath (for M2-0202 8

(1) residual heat removal)/

(E-1)

Steam Line Isolation &

Containment Isolation MS-0098 M1-0202 GA/MA B

2 B

A C

N/A ET/0 N/A N/A Steam Generator Tube 2

(B-1)

Rupture Isolation M2-0202 (Isolates PORV)

(B-1)

MS-0101 M1-0202 GA/MA 4

2 B

A C

N/A ET/0 N/A N/A TDAFWP Steam Supply 9

(A-6)

Flowpath/ Containment M2-0202 Isolation (A-6)

MS-0128 MS-0202 GA/MA 4

2 B

A C

N/A ET/Q N/A N/A TDAFkP Steam Supply (A-5)

Flowpath/ Containment M2 0202 1 solation (A-5)

Rev. 9 June 26. 1997

COMANCHE PEAK STEM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN TABLE 13 - SAFITY INJECTION PAGE 15

~

Test Parameters / Schedule Flow Valve /

Safety fail Position Valve Diagram Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator Ntsber (Coord.)

Tvoe itzt Clan mCL 11gIL Pos.

Icit Test Init Ieit Pemarks 8948C M1-0262 CK/SA 10 1

A/C A

0 LT/TS PS/CS N/A N/A ECCS to Cold Legs Flowpath/

4 (A-5)

(1)

CV/RF Reactor Coolant Pressure M2-0263-B (9)

Boundary (G 5)

C CV/CS (9) 89480 M1-0262 CK/SA 10 1

A/C A

0 LT/TS PS/CS N/A N/A ECCS to Cold Legs Flowpath/

(A-6)

(1)

CV/RF Reactor Coolant Pressure M2-G263 B (9)

Boundary (G-6)

C CV/CS (9) 8949A M1-0263 CK/SA 6

1 A/C A

O/C LT/TS CV/RF N/A N/A ECCS to m t Legs Flowpath/

(A-2)

(1)

(6)

Reactor Coolant Pressure M2 0263 Boundary (F-2) 89498 M1 0263 CK/SA 6

1 A/C A

0/C LTITS CV/RF N/A N/A ECCS to Hot Legs Flowpath/

1 (A-1)

(1)

(6)

Reactor Coolant Pressure M2-0263 Bourdary (G-1) 8949C M1 0263 CK/SA 6

1

'A/C A

0/C LT/TS CV/RF N/A N/A ECCS to Hot Legs Flowpath/

(A-1)

(1)

(6)

Reactor Coolant Pressure M2-0263 Boundary (G-2) 89490 M1-0263 CK/SA 6

1 A/C A

O/C LT/TS CV/RF N/A N/A ECCS to Hot Legs Flowpath/

(A-3)

(1)

(6)

Reactor Coolant Pressure M2-0263 Boundary (F-3) 8956A M1-0262 CK/SA 10 1

A/C A

O/C LT/TS CV/RF N/A N/A ECCS to Cold Legs Flowpath/

9 (B-2)

(1)

(8)

Reactor Coolant Pressure M2-0263-8 Boundary (E-2)

Rev. 9 June 26,1997

CCHANGE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN TABLE 13 SAFETY INJECTION PRE.16 Test Parameters / Schedule Flow Valve /

Safety Fail Position Valve Diagram Actuator Code Cate-Fune-Func.

Leak Exercise Safe Indicator Nymber (Coord.)

Tvoe 11:e Clan ggCy_

1190.

Pos.

Igit Test Tgit Inst Remarks 89568 M1 0262 CK/SA 10 1

A/C A

O/C LT/TS CV/RF N/A N/A ECCS to Cold Legs Flowpath/

(B-3)

(1)

(8)

Reactor Coolant Pressure 9

M2-0263-B Boundary (E-3) 8956C M1-0262 CK/SA 10 1

A/C A

O/C LT/TS CV/RF N/A N/A ECCS to Cold Legs Flowpath/

(B-5)

(1)

(8)

Reactor Coolant Pressure M2-0263-B Boundary (E-5) 8956D H1 0262 CK/SA 10 1

A/C A

O/C LT/TS CV/RF N/A N/A ECCS to Cold Legs F?owpath/

(B 6)

(1)

(B)

Reactor Coolant Pressure M2 0263-B Boundary (E-6) 8958A H1 0263-B CK/SA 14 2

C A

0/C N/A CV/CS N/A N/A ECCS Injection Flowpath/

(F-2)

(7)

ECCS Recirculation Flowpath H2-0263 A Boundary (B 2) 8958B M1-0263 B CK/SA 14 2

C A

O/C N!%

CV/CS N/A N/A ECCS Injection Flowpath/

(F-4)

(7)

ECCS Recirculation Flowpath H2-0263-A Boundary (B 3) 8964 M1-0262 GL/A0 2/4 2

A A

C LTJ/TS NT/Q FC/Q PIT / Containment Isolation (A-1) 2YR M2 0263-C (E-2)

Rev.9 June 26,1997

COMANCE PEAK STEM ELECTRIC STATION LMIT 1 & 2

~

(

INSERVICE VALVE TESTING PLM TABLE 13 - SAFETY INJECTION Page 22 NOTES The subject check valves are full-stroke close exercised at refueling outages at the same frequency as the full-stroke open exercise for the reasons described above. (Close exercising of valve 8926 is not practicable following its quarterly part-stroke open exercise. To do so would defeat both trains of the intermediate head sitsystem. Therefore valve 8926 is also full-stroke close exercised at refueling outages coincident with its full-stroke open exercise.)

7.

8958A & B. Low Head Safety Injection Flowpath Check Valves, are full-stroke exercised at cold shutdowns. These valves cannot be 4

full or part-stroke open exercised during plant operation because the relatively higher pressure of the Reactor Coolant System will not allow forward flow through these paths. The flowpath through the RfR to RWST return line can be used at times to full-stroke exercise these valves; however, this path cannot be used during plant operation since opening this line defeats both trains of the Low Pressure Safety Injection Systee. Part-stroke exercising certain of these check valves during plant opa stian via the 51 test header is not practicable because this path yields flowrates too small (approx. 5 gpm) to be meaningful for assessing the operational readiness of these valves.

The subject check valves are full-stroke close exercised at cold shutdowns at the same frequency as the full-stroke open exercise for the reasons described above.

8.

Beginning with the fifth refuetug adage for Unit 1 and the third refueling outage for Unit 2. valves 8956A. B. C. and D will be 9

tested consistent with guidelines in Section 4.1.2 " Exercising Check Valves with Flow and Nonintrustive Techniques." of NUPIG-1482. " Guidelines for Inservice Testing at Nuclear Power Plants." dated April 1995. Relief from the ASK Code is not required because this method is considered "other positive means" of verifying disk movement.

Rev.9 June 26.1997

CPSES UNIT 1 & 2 l

j INSERVICE TESTING PLAN APPENDIX A l

SUBSTITUTE TEST Verify operability of the subject check valves through disassembly.and inspection of one of the four valves in l

l each unit at each re.rueling outage for that unit. The disassembled valve will te verified to be capable of full-stroking and it will be verified that the internals of the valve are structurally sound (no loose or corroded parts).

l Also, the disk will be manually exercised.

A different valve from each unit will be disassembled.

i inspected. and manually full-stroke exercised at each successive refueling outage until the entire group for that unit has been tested.

If the disassembled valve is not capable of being full-stroke exercised or there is binding or failure of valve internals, the remaining valves in the group for that unit will also be i

l disassembled, inspected, and manually full-stroke exercised during the same outage Once this is completed, the sequence of disassembly will be repeated unless extension of the interval can be justified.

NRC APPROVAL STATUS This Relief Request is pre-approved by Generic Letter 2

89-04, Attachment 1, Position 2.

(Also reference safety evaluation dated January 29, 1993 for Unit 1 and NUREG-0797, SER Supplement 26 for Unit 2.)

Beginning with the fifth refueling outage for Unit 1 and 9

the third refueling outage for Unit 2, this relief request will no longer be used.

l A-19 Rev. 9 June 26. 1997

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 1 0F 5 BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

Revision 0 Submitted July 1. 1992 Revision 1 February 3, 1993 Revision 2 April 30, 1993 Revision 3 November 19, 1993 Revision 4 October 7. 1994 Revision 5 February 15, 1995 Revision 6 October 5, 1996 Revision 7 October 16, 1996 Revision 8 January 31, 1997 Revision 9 June 26, 1997 fAge Revision /Date Record of Changes October 7. 1994 Cover Sheet Revision 8 i (Table of Contents)

April 30, 1993 1-1 Revision 2 1-2 Revision 3 1-3 Revision 2 1-4 April 30, 1993 2-1 Revision 0 2-2 Revision 0 2-3 Revision 0 2-4 Revision 0 2-5 Revision 0 Table 0. Page 1 of 4 Revision 0 Table 0. Page 2 of 4 Revision 0 Table 0. Page 3 of 4 Revision 2 Table 0. Page 4 of 4 Revision 0 Table 0. Notes. Page 1 Revision 2 3-1 Revision 0 3-2 Revision 8 3-3 Revision 0 3-4 Revision 0 3-5 Revision 0 Valve Table Index Page 1 of 3 Revision 2 Valve Table Index. Page 2 of 3 April 30, 1993 Valve Table Index. Page 3 of 3 April 30, 1993 Table 1. Page 1 of 12 January 31, 1997 Table 1, Page 2 January 31, 1997 Table 1. Page 3 January 31, 1997 Table 1. Page 4 January 31, 1997 Table 1. Page 5 January 31, 1997 Table 1. Page 6 January 31, 1997

)

i EPL-1 June 26, 1997

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES l

FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 2 0F 5 Table 1. Page 7-January 31, 1997 Table 1. Page 8 January 31, 1997 Table 1. Page 9 January 31, 1997 Table 1, Page 10 January 31, 1997 Table 1. Page 11 Revision 8 Table 1. Page 12 Revision 8 Table 2. Page 1 of 13 January 31, 1997 Table 2. Page 2 January 31, 1997 Table 2 Page 3 January 31, 1997 Table 2 Page 4 January 31, 1997 Table 2. Page 5 January 31, 1997 Table 2. Page 6 January 31. 1997 Table 2. Page 7 January 31, 1997 Table 2. Page 8 January 31, 1997 Table 2. Page 9 January 31, 1997 Table 2. Page 10 Revision 8 Table 2. Page 11 Revision 8 Table 2, Page 12 January 31, 1997 Table 2 Page 13 Revision 8 Table 3. Page 1 of 2 Revision 8 Table 3, Page 2 Revision 8 j

Table 4, Page 1 of 16 January 31, 1997 1

Table 4. Page 2 January 31. 1997 Table 4. Page 3 January 31, 1997 Table 4. Page 4 January 31. 1997 Table 4. Page 5 January 31, 1997

)

Table 4. Page 6 January 31, 1997 Table 4. Page 7 January 31, 1997 Table 4. Page 8 January 31, 1997 l

Table 4. Page 9 January 31, 1997 Table 4. Page 10 January 31. 1997.

Table 4, Page 11 January 31, 1997 Table 4. Page 12 Revision 8 Table 4. Page 13 January 31, 1997 Table 4. Page 14 January 31, 1997 Table 4. Page 15 January 31. 1997 Table 4. Page 16 Revision 8 Table 5. Page 1 of 7 January 31, 1997 Table 5. Page 2 January 31, 1997 Table 5. Page 3 January 31, 1997 Table 5. Page 4 January 31, 1997 Table 5 Page 5 January 31, 1997 Table 5, Page 6 Revision 8 Table 5. Page 7 Revision 8 Table 6. Page 1 of 3 Revision 6 Table 6. Page 2 October 5, 1996 Table 6. Page 3 Revision 6 EPL-2 June 26, 1997

~.

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2' INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 3 0F 5 Table 7. Page 1 of 6 January 31, 1997 Table 7. Page 2 January 31, 1997 Table 7, Page 3 January 31, 1997 Table 7. Page 4 January 31. 1997 Table 7. Page 5 Revision 8 Table 7. Page 6 Revision 8 Table 8. Page 1 of 6 Revision 0 Table 8. Page 2 of 6 Revision 0 Table 8. Page 3 of 6 Revision 0 Table 8. Page 4 of 6 Revision 0 Table 8. Page 5 of 6 Revision 0 Table 8. Page 6 of 6 Revision 0 Table 8, Notes. Page 1 April 30. 1993 Table 9. Page 1 of 12 Revision 2 Table 9. Page 2 of 12 Revision 2 Table 9. Page 3 of 12 Revision 9 Table 9. Page 4 of 12 Revision 2.

Table 9. Page 5 of 12 April 30. 1993 Table 9. Page 6 of 12 April 30, 1993 Table 9, Page 7 of 12 April 30. 1993 Table 9. Page 8 of 12 April 30. 1993 Table 9. Page 9 of 12 April 30,1993 Table 9. Page 10 of 12 April 30, 1993 Table 9. Page 11 of 12 April 30, 1993 Table 9. Page 12 of 12 April 30, 1993 Table 9. Notes. Page 1 Revision 0 Table 10. Page 1 of 3 Revision 0 Table 10. Page'2 of 3 Revision 0 Table 10. Page 3 of 3 Revision 0 Table 10. Notes. Page 1 Revision 0 Table 11. Page 1 of 5 January 31, 1997 Table 11. Page 2 January 31, 1997 Table 11. Page 3 January 31, 1997 Table 11. Page 4 Revision 8 Table 11, Page 5 Revision 8 Table 12. Page 1 of 2 Revision 0 Table 12. Page 2 of 2 Revision 0 Table 13. Page 1 of 23 January 31, 1997 l

Table 13. Page 2 January 31. 1997 l

Table 13. Page 3 January 31, 1997 l

Table 13. Page 4 January 31, 1997 Table 13. Page 5 January 31, 1997 i

Table 13. Page 6 January 31, 1997 Table 13. Page 7 January 31, 1997 Table 13. Page 8 January 31. 1997 Table 13. Page 9 January 31, 1997 EPL-3 June 26, 1997

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES i

l FIRST INTERVAL t

EFFECTIVE PAGE LISTING PAGE 4 0F 5 i

Table 13 Page 10 January 31, 1997 Table 13, Page 11 January 31, 1997 Table 13, Page 12 January 31, 1997 Table 13 Page 13 January 31, 1997 Table 13, Page 14 January 31, 1997 Table 13. Page 15 Revision 9 Table 13. Page 16 Revision 9 l

Table 13, Page 17 January 31, 1997 Table 13, Page 18 Revision 8 Table 13, Page 19 Revision 8 i

l Table 13. Page 20 January 31, 1997 Table 13, Page 21 January 31, 1997 Table 13 Page 22 Revision 9 Table 13, Page 23 Revision 8 Table 14. Page 1 of 5 January 31, 1997 Table 14, Page 2 January 31, 1997 Table 14 Page 3 January 31, 1997 Table 14, Page 4 Rivision 8 Table 14 Page 5 Rivision 8 Table 15, Page 1 of 1 Revision 0 Table 15, Notes, Page 1 Revision 0 Table 16, Page 1 of 2 Revision 0 Table 16 Page 2 of 2 Revision 0 Table 16, Notes, Page 1 Revision 0 Table 17, Page 1 of 12 Revision 2 Table 17, Page 2 of 12 Revision 2 Table 17 Page 3 of 12 Revision 0 Table 17 Page 4 of 12 Revision 0 Table 17, Page 5 of 12 Revision 0 Table 17 Page 6 of 12 Revision 0 Table 17, Page 7 of 12 Revision 0 Table 17. Page 8 of 12 Revision 2 Table 17, Page 9 of 12 Revision 2 Table 17. Page 10 of 12 Revision 2 Table 17, Page 11 of 12 Revision 2 Table 17, Page 12 of 12 Revision 0 Table 17, Notes, Page 1 April 30,1993 Table 17, Notes, Page 2 Revision 2 A-1 Revision 0 A-2 April 30, 1993 A-3 April 30, 1993 A-4 Revision 2 A-5 April 30, 1993 A-6 April 30, 1993 A-7 Revision 2 A-8 April 30, 1993 A-9 Revision 2 A-10 April 30, 1993 EPL-4 June 26, 1997

CDMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING 2

PAGE 5 0F 5 A-11 Revision 2 A-12 April 30, 1993 A-13 Revision 2 A-14 April 30, 1993 l

A-15 Revision 2 A-16 April 30, 1993 A-17 Revision 2 i

A-18 April 30, 1993 A-19 Revision 9 EPL, Page 1 of 5 June 26, 1997 EPL, Page 2 of 5 June 26, 1997 EPL, Page 3 of 5 June 26, 1997 EPL, Page 4 of 5 June 26, 1997 EPL. Page 5 of 5 June 26, 1997 i

7 4

i EPL-5 June 26, 1997