Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual
ML20141E620
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/26/1997
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20141E606 List:
References
PROC-970626, NUDOCS 9707010119
Download: ML20141E620 (9)


Text

_ . _ _ _ ._ . . . .. . . _ - , _ . . . . . _ . . . ..m _. _- -

Attachment to TXX-97146 l

CPSES - TECHNICAL REQUIREMENTS MANUAL REVISION - 24 i DETAILED DESCRIPTION l

l Prefix Page Page 1 (as amended) GrouD DescrIDtion 2- 9 2 Adds main steam block valves (MS 0101 and MS-0128) to Table 2.1.1,

" Containment Isolation Valves".

l Addition l The Main Steam valves HV-2452-1 and HV-2452-2, supply steam from l Steam Generators I and 4 to the Auxiliary Feedwater Pump Turbine. These l valves utilize safety related air accumulators to maintain the valves closed during off-normal plant conditions. Afler exhausting the air accumulators, a secondary method of ensuring Containment Isolation is required. The upstream block valves (MS-0101 and MS-0128) fulfill this requirement..

The air accumulators supply safety related air to the air-operated valves upon

loss of the non-safety related plant instrument air system. However, by design, the air accumulators only provide sufficient air to close the valves l and keep them closed for 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> with an additional half hour a!!ocated for manual operator action. The block valves upstream of HV-24521,-2 are ASME Safety Class 2 gate valves with manual gear operators and have been qualified to function as secondary outside Containment isolation for j pene ations MI-0001 and MI-0004. '

, The FSAR (LDCR-SA-96-131) and Inservice Testing Plan

!- (LDCR-IT-97-006) are also being revised to be consistent with this change.

( Change Request Number . TR 7 . I Related SER 10.3.1 SSER :

j SER/SSER Impact N l

l 2-28 4 Clarify wording for containment spray pump testing. I Clarification The new wording is more consistent with the Technical Specification as revised by Amendment 37/23 (and staff Safety Evaluation) and the actual way the testing is performed. Each pump is individually tested at >3300 gpm and >245 psid then the two flows are summed.

Change Request Number TR 1 . 1 Related SER : SSER SER/SSER 1mpact N i ~

1 l

4 i

4 9707010119 970626 PDR ADOCK 05000445  !

P PM ,

F' t

1 l

i l

I i

l 1

i l

i l

i I

t 1 t

1 1

i l

i i

r r

l l l

I 1

l i l

l ENCLOSURE TO TXX 97146 1

i I

i r

i i

t a

k 5

4 d

4

m. - __ . . _ _ _ . _ . . .. .. _ _ ._ _. _ . _ . _ ._ _ _ . _. _ _ .. _. _ _ . _ .._._.. _ _ _ __ .._.. _

l i

l COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 l l

TECHNICAL REQUIREMENTS MANUAL (TRM)

INSTRUCTION SHEET

-(Page 1 of 1) ,

l The following instructional information and checklist 1.s being furnished to help insert Revision 24 into the Comanche Peak Steam Electric Station TRM. )

i r Discard the old sheets and insert the new sheets, as listed below.

l Remove Insert

[

I Section 2

'2 9 29 2 28 2-28 l

l' List of Effec _tive Paaes EPL 1 through EPL 4 EPL 1 through EPL 4 NOTE: Please complete the entry for insertion of Revision 24 on the " Record of Changes" form located at the beginning of the TRM.

I f

i

,e 5

i _ _ _ _ _ _ . ... .

. . _.- , . _ . . = - - _. . . . . ~ . . . - . -

CPSES/TRM

+

TECHNICAL REQUIREMENT 2.1 (continued)

]

TABLE 2.1.1 (continued)

CONTAINMENT ISOLATION VALVES MAXIMUM

i. ISOLATION NOTES AND l' FSAR TABLE TIME LEAK TEST VALVE NO. REFERENCE NO.* LINE OR SERVICE (Seconds) REQUIREMENTS 1
3. Containment Ventilation Isolation Valves (continued)  ;

HV-5548 122 Containment 5 C 21 Pressure Relief Note 8 i

HV-5549 122 Containment 5 C 21 l Pressure Relief Note 8

4. Manual Valves i

MS-711# 4a TDAFW Pump Bypass N.A. N.A. 8 Warm-up Valve MS-390 Sa N2 Supply to Steam N.A. N.A. 8 l Generator #1  !

MS-387 9a N2 Supply to Steam N.A. N.A. 8 i Generator #2 MS-384 13a N2 Supply to Steam N.A. N.A. 8 Generator #3 l MS-712# 17a TDAFW Pump Bypass N.A. N.A. 8 Warm-up Valve l

MS-393 18a N2 Supply to Steam N.A. N.A. 8 Generator #4 FW-106 20b N2 Supply to Steam N.A. N.A. 8 Generator #1 FW-104 22b N2 Supply to Steam N.A. N.A. 8 Generator #2 FW-102 24b N2 Supply to Steam N.A. N.A. 8 Generator #3 FW-108 26b N2 Supply to Steam N.A. N.A. 8 Generator #4 j 7135' 52 RCDT Heat Exchanger N.A. C 8 l

to Waste Holdup Tank

! MS-101 4 TDAFWP Steam Supply N.A N.A 24

, 1 l MS-128 17 TDAFWP Steam Supply N.A N.A COMANCHE PEAK - UNITS 1 AND 2 2-9 Revision 24

June 26, 1997 L

1 1

. TECHNICAL REQUIREMENT 2.2 2.2.1 In the test mode each Containment Spray pump is required to provide a 24 l total discharge flow through the test header of greater than or equal to 3300 gpm at 245 psid with the pump eductor line open.

l l

l 1

I 1

l; I

l l

l l

1 l

l 1

l l

l l

l l

l 1

l I

1 l

I l

l l l

l COMANCHE PEAK - UNITS 1 AND 2 2-28 Revision 24 June 26. 1997 l

l

l

. COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

! EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

l Original Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990 Revision 3 July 20, 1990 Revision 4 April 24, 1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11 February 3, 1993 Revision 12 July 15, 1993 Revision 13 September 14, 1993 Revision 14 November 30, 1993 Revision 15 April 15, 1994 Revision 16 11, 1994 Revision 17 U ary 24,1995 Revision 18 Apc 14, 1995 Revision 19 May 15, 1995 Revision 20 June 30, 1995 Revision 21 January 24, 1996 Revision 22 February 24, 1997 Revision 23 March 13, 1997 Revision 24 June 26, 1997 l

i l

r i

EPL-1 June 26, 1997

1

. )

0 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING TRM-Tab Original Record of Changes February 24. 1995 TRM-Title Page June 30, 1992 Table of Contents-Tab Original i February 24. 1995 Administrative Controls-Tab Original Administrative Controls-Title Page June 30, 1995 0-1 Revision 20 02 Revision 20 0-3 Revision 20

, 0-4 Revision 20 Technical Requirements-Tab Original Section 1-Tab Original 1-1 Revision 20 1-2 Revision 23 1-3 Revision 21 1-4 Revision 20 1-5 June 30. 1995 1-6 Revision 21 1-7 February 24. 1997 1-8 P0 vision 21 1-9 Revision 21 1-10 June 30, 1995 1-11 Revision 21 1-12 June 30, 1995 1-13 June 30, 1995 1-14 June 30, 1995 1-15 June 30, 1995 1-16 June 30, 1995 1-17 June 30. 1995 1-18 June 30, 1995 1-19 June 30, 1995 Sec. 2-Tab Original 2-1 Revision 20 2-2 June 30, 1995 2-3 Revision 21 2-4 June 30, 1995 2-5 sune 30. 1995 2-6 June 30. 1995 2-7 Revision 21 2-8 June 30. 1995 2-9 Revision 24 EPL-2 June 26. 1997 e _ _ _ - . -

l .

1 s COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 2-10 June 30. 1995 2-11 June 30, 1995 l 2-12 June 30, 1995 2-13 June 30, 1995 2-14 June 30, 1995 2-15 June 30, 1995 2-16 June 30, 1995 2-17 June 30, 1995 2-18 June 30, 1995 2-19 June 30, 199) 2-20 June 30, 1995 2-21 June 30, 1995 2-22 June 30, 1995 2-23 June 30, 1995 2-24 June 30, 1995 2-25 Revision 21 2-26 June 30, 1995 2-27 Revision 20 2-28 Revision 24 Sec. 3-Tab Original 3-1 Revision 20 3-2 June 30, 1995 3-3 June 30, 1995 3-4 June 30, 1995 j 3-5 June 30, 1995 3-6 June 30, 1995 37 June 30, 1995 l 3-8 June 30, 1995 {

3-9 June 30, 1995 i i 3-10 June 30, 1995  !

Sec. 4-Tab Original l

4-1 Revision 20 l 4-2 June 30, 1995 l 4-3 June 30, 1995 44 June 30, 1995 4-5 June 30, 1995  !

4-6 June 30, 1995 l t- 4-7 June 30, 1995 l l 4-8 June 30, 1995  ;

4-9 June 30, 1995 l 4-10 June 30, 1995 4-11 June 30, 1995  ;

l 1

EPL-3 June 26, 1997

'l

CDMANCHE PEAX STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 4-12 June 30, 1995 4 13 June 30, 1995 4 14 June 30, 1995 4-15 June 30, 1995 4-16 June 30, 1995 4-17 June 30, 1995 4-18 June 30, 1995 4-19 June 30, 1995 4-20 June 30, 1995 4-21 June 30, 1995 4-22 June 30, 1995 4-23 June 30, 1995 4-24 June 30, 1995 4-25 June 30, 1995 4-26 June 30, 1995 4-27 June 30. 1995 4-28 June 30, 1995 4-29 June 30, 1995 EPL-Tab Original EPL-1 June 26, 1997 EPL-2 June 26, 1997 EF.-3 June 26, 1997 EPL-4 June 26, 1997 4

9 EPL-4 June 26, 1997

.. .