ML20202J286
| ML20202J286 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/24/1986 |
| From: | Bajada E, Hansel J EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20202J051 | List:
|
| References | |
| CPP-003-02, CPP-3-2, NUDOCS 8607170052 | |
| Download: ML20202J286 (2) | |
Text
'
8 s
$, U. t E"D COPY "8
' " 2 i
g o
EVALUATION RESEARCH CORPORATION
- COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE NO: 001 PROCEDURE NO:
CPP-003 REVISION: 3 ISSUE DATE:
3[M[f6 INDOCTRINATION, TRAINING AND CERTIFICATION OF PERSONNEL The CPP identified above is hereby changed as shown on the attached page of this notice.
l l
N Prepared by:
Da i
Sh/![h Approved by:
. [. b d de(c Date:
On-Site QA Represe ative 3
/ Ib Approved by:
<u /
Date:
l QA
' Review Team leader
/
86071700S2 860711 PDR ADOCK 05000445 A
't I
I
'Changs Notica 001 CPP-003 Revision: 3 1.
Revise Section 5.4.1, in part, to read "...for...." in lieu of
"... prior to...."
2.
Revise the footnote (indicated by an asterisk) on page seven to read: "*The Braidwood Construction Assessment Program."
3.
Revise the first paragraph (after the note) on page 9 to. read:
"The certification may be conditional and/or restricted. That is, certification may be conditional upon the completion of the verification of the education and experience.
A NOTE: Should it be subsequently determined that an individual is unqualified, all of his/her work shall be reinspected and reviewed.
The certifying individual may also qualify the'ertification in the C
" LIMITATIONS OF CERTIFICATION" portion of the Personnel Certification form."
4.
Add Section 5.4.7 after the second paragraph of Section 5.4.6 as follows:
"5.4.7 Recertification 0
The CA ensures that inspection, examination, and test personnel are recertified at least annually.
Recertification is contingent upon the recommendation of the appropriate Level III inspector and compliance with any established requirements."
l i
O 2
. _ _ _ _