ML20135A824

From kanterella
Jump to navigation Jump to search
Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual
ML20135A824
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/24/1997
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20135A815 List:
References
PROC-970224, NUDOCS 9702270422
Download: ML20135A824 (7)


Text

. .

4 COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL INSTRUCTION SHEET (Page 1 of 1)

The following instructional information and checklist is being furnished to help insert Revision 22 into the Comanche Peak Steam Electric Station TRM.

Discard the old sheets- and insert the new sheets, as listed below.

Remove Insert Section 1 1-2 1-2 1-7 1-7 List of Effective Paaes EPL-1 through EPL-4 EPL-1 thru EPL-4 NOTE: Please complete the entry for insertion of Revison 22 on the " Record of Changes" form located at the beginning of the TRM. -

9702270422 970224 PDR ADOCK 05000445-P P DR.;

CPSES/TRM TECHNICAL REQUIREMENT 1.1 Table 1.1.1 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME

1. . Manual Reactor Trip N.A.
2. Power Range. Neutron Flux s 0.5 second* ,

l

3. Power Range, Neutron Flux l- High Positive Rate N.A.

i l

l 4. Not Used 19

! i

5. Intermediate Range, Neutron Flux N.A. i
6. Source Range, Neutron Flux N.A. 21
7. Overtemperature N-16 5 7 seconds *# (Unit 1) 22 5 8 seconds *# (Unit 2) 22 j 8. Overpower N-16 s 7 seconds *#
9. Pressurizer Pressure-Low s 2 seconds
10. Pressurizer Pressure-High s 2 seconds i

! 11. Pressurizer Water Level-High N.A.  ;

  • Neutron / gamma detectors are exempt from response time testing. Response time of l the neutron / gamma flux signal portion of the channel shall be measured from '

detector output or input of first electronic component in a channel.

  1. Response time includes the thermal well response time.

l l

l I

i l COMANCHE PEAK - UNITS 1 AND 2 1-2 Revision 22 February 24. 1997

' CPSES/TRM

, TECHNICAL REOUIREMENT 1.2 (continuedl TABLE 1.2.1 (continued)

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

3. Pressurizer Pressure--Low
a. Safety Injection (ECCS) 527 (1.5a.10)/ 27 (4,5b.10) 21
b. Reactor Trip 5 2 un
c. Feedwater Isolation s7
d. Phase "A" Isolation 5 17 (2)/27 (1)
e. Containment Ventilation Isolation s 5 (6) 9
f. Motor-Driven Auxiliary Feedwater II) s 60 21
g. Station Service Water N.A.
h. Component Cooling Water N.A.
i. Essential Ventilation Systems N.A.

j Emergency Diesel Generator Operation 5 12

k. Turbine Trip N.A.
1. Control Room Emergency Recirculation N.A.
m. Containment Spray Pump N.A. 9 COMANCHE PEAK - UNITS 1 AND 2 1-7 February 24. 1997

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

Original _ Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990 Revision 3 July 20, 1990 Revision 4 April 24,1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11 February 3, 1993 Revision 12 July 15, 1993 Revision 13 September 14, 1993 Revision 14 November 30, 1993 Revision 15 April 15,1994 Revision 16 May 11, 1994 Revision 17 February 24, 1995 Revision 18 April 14,1995 Revision 19 May 15, 1995 Revision 20 June 30, 1995 i Revision 21 January 24, 1996 Revision 22 Feoruary 24, 1997 )

i i

l l

l EPL-1 February 24, 1997

l COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING I

l TRM-Tab Original 1 Record of Changes February 24, 1995 TRM-Title Page June 30. 1992 Table of Contents-Tab Original  !

1 February 24, 1995 i Administrative Controls-Tab Original l Administrative Controls-Title Page June 30, 1995

)

0-1 Revision 20 J 0-2 Revision 20 l 0-3 Revision 20 1 0-4 Revision 20 I Technical Requirements-Tab Original Original Section 1-Tab )

1-1 Revision 20 1-2 Revision 22 1-3 Revision 21  :

1-4 Revision 20 l 1-5 June 30, 1995 1-6 Revision 21 17 February 24, 1997 1-8 Revision 21 1-9 Revision 21 1-10 June 30, 1995 1-11 Revision 21 1-12 June 30, 1995 1-13 June 30. 1995 )

1-14 June 30. 1995  !

1-15 June 30, 1995 1-16 June 30, 1995 i 1-17 June 30. 1995 1-18 June 30. 1995 1 1-19 June 30, 1995 )

Sec. 2-Tab Original l 2-1 Revision 20 l 2-2 June 30. 1995 )

2-3 Revision 21 )

2-4 June 30, 1995 1 2-5 June 30, 1995 2-6 June 30, 1995 i

2-7 Revision 21 1 l 2-8 June 30, 1995 l

2-9 Revision 21 EPL-2 February 24. 1997 l l

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM) -

EFFECTIVE PAGE LISTING 2-10 June 30, 1995 2-11 June 30, 1995 2-12 June 30. 1995 2-13 June 30, 1995 2-14 June 30, 1995 2-15 June 30, 1995 2-16 June 30, 1995 2-17 June 30, 1995 2-18 June 30, 1995 2-19 June 30. 1995 2-20 June 30, 1995 2-21 June 30, 1995 2-22 June 30, 1995 2-23 June 30, 1995 2-24 June 30. 1995 j 2-25 Revision 21 2-26 June 30. 1995 2-27 Revision 20 2-28 June 30, 1995 Sec. 3-Tab Original y 3-1 Revision 20 i 3-2 June 30, 1995 3-3 June 30, 1995  !

3-4 June 30, 1995 3-5 June 30. 1995  :

3-6 June 30, 1995 '

3-7 June 30, 1995 3-8 June 30, 1995 3-9 June 30, 1995 l 3-10 June 30, 1995 Sec. 4-Tab Original 4-1 Revision 20 4-2 June 30. 1995 4-3 June 30, 1995 4-4 June 30, 1995 4-5 June 30, 1995 4-6 June 30, 1995 4-7 June 30, 1995 4-8 June 30, 1995 4-9 June 30. 1995 4-10 June 30, 1995 4-11 June 30, 1995 EPL-3 February 24, 1997 4

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 4-12 June 30, 19!15 4-13 June 30, 1955 4-14 June 30, 1995 4-15 June 30, 1995 4-16 June 30, 1995 4-17 June 30, 1995 4-18 June 30, 1995 4-19 June 30, 1995 4-20 June 30. 1995 4-21 June 30, 1995 4-22 June 30, 1995 4-23 June 30, 1995 4-24 June 30, 1995 4-25 June 30, 1995 4-26 June 30, 1995 4-27 June 30, 1995 4-28 June 30. 1995 4-29 June 30, 1995 EPL-Tab Original EPL-1 February 24, 1997 EPL-2 February 24, 1997 EPL-3 February 24. 1997 EPL-4 February 24, 1997 EPL-4 February 24, 1997