AUGMENTED INSERVICE INSPECTION PLAN TXU ELECTRIC 1

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 Revision 4 d i

Prepared: b bo" A Mb Esf h k i1 Approved: [ Maya v a ,, [/Lo[jf I f

~

J lo 9909290078 990924 PDR ADOCK 05000445 8 PDR-

7..

I N

t

  • AUGMENTED INSERVICE INSPECTION PLAN l

, O The purpose of this document is to identify and describe various regulatory and CPSES commitments involving the l performance of periodic non-destructive examinations (NDE) other than those addressed in ASME Section XI (i.e.,

augmented inservice inspection). A separate section is provided for each major activity. Within each section the following information is provided:

a. Governing Document
b. Exam items & Boundaries
c. NDE Method and Schedule
d. Acceptance Criteria
e. Special Reports NOTE: Where Sections of the ASME Code are used in this document, the Edition and Addenda shall be as referenced in the CPSES Unit 1 Inservice inspection Plan.

O i

i i

l (i)

J

ir TABLE OF CONTENTS SECTION 1 Reactor Coolant Pump Flywheels 2 Safety injection Pump Shroud 3 Flux Thimble Tubes 4 Main Steam and Feedwater Break Exclusion Piping Examination Tables 5 Supplementary Containment Spray and Residual Heat Removal Piping Welds Examination Tables 6 Reactor Vessel Head and Internals Lifting Devices App A Summary of Revision App B Interim Change Request (ICR)Index l

1 l

i (ii) i i

D -

REACTOR COOLANT PUMP I'LYWHEELS n

V) l This program shall provide for the inspection of each reactor coolant pump flywheel per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975. In lieu of Position C.4.b (1) and C.4.b (2), a qualified in-place UT examination over the volume from the inner bore of the Dywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed Dywheels may be conducted at approximately 10 year intervals coinciding with Inservice Inspection schedule as required by ASME Section XI.

The schedule for examinations shall be coincident with the inservice inspection periods and intervals described in ASME Section XI.

The acceptance limit for Daw size based upon the maximum design overspeed is 1.15 in. (Ref. WCAP-8163). All Haws detected shall be recorded for evaluation and monitored for growth rate.

No special reports are required for this activity unless examination and evaluation indicate that the 1.15 in. flaw size limit has been or will be exceeded during the service life of the flywheel. Should this occur, the NRC shall be notified (Ref.

Guide 1.14). Records of the examinations shall be maintained with the applicable work control document.

Summary Discussion

a. Governing Document - Regulatory Guide 1.14 Rev.1.

i

b. Exam items and Boundaries - Each reactor coolant pump flywheel.
c. NDE Method and Schedule In-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and'or PT) of exposed surfaces of the removed flywheels may be conducted at approximately 10 year intervals t
d. Acceptance Criteria - No Daw s greater than 1.15 in,
e. Special Reports - The NRC shall be notified should the maximum flaw size be exceeded, or expect to be exceeded, during the service life.

I

,m I i V

(1)

i

  • SAFETY INJECTION PUMP SHROUD l

/ \

c

) Visible linear indications have been found on the shroud that separates and supports the diffuser vanes and retum guide

\/ vanes on the type pump utilized as the safety injection pump at Comanche Peak Steam Electric Station (CPSES). These indications exceed the designer-permitted 1/16 in. maximum. The pump supplier (Pacific Pumps) has evaluated the significance of these indications and detennined they have no adverse affects upon the operability of the pumps (Ref.

NUREG-0797 Supplement 12).

Pacific Pumps has proposed a field inspection program which addresses this issue. This program has been supplemented by the NRC and is described in NUREG-0797 Supplement 12.

The program requires a visual and surface examination of the shroud section of the intermediate cover during normal or emergency maintenance at approximately 10-year intervals (pump disassem >ly solely for this examination is not required). A log of all indications is to be maintained, with indications having a depth greater than 1.0 in. in the radial direction to be reported to Pacific Pumps. Records of the examination shall be maintained in the applicable work control document.

. Summary Discussion

a. Governing Document - Supplemental Safety Evaluation Report 12 (NUREG-0797).
b. Exam items and Boundaries - Shroud section of the safety injection pumps' intermediate cover.
c. NDE Method and Schedule - Visual and surface examination during normal or emergency maintenance at approximately 10-year intervals.
d. Acceptance Criteria - All indications shall be recorded with evaluation being on a case-by-case basis.
e. Special Reports - All indications exceeding 1.0 in. in raJial direction shall be reported to Pacific Pumps.

i O

(1)

O '

FLUX THIMBLE TUBES l Westinghouse reactors containing bottom mounted instrumentation (BMI) flux thimble tubes have experienced wear due

[D)

(- to flow induced vibration in the reactor vessel. These thimble tubes provide a pathway for the neutron flux detectors and extend from the seal table into the fuel assembly area. These tubes are closed within the vessel but open at the seal table.

Therefore, these tubes constitute a portion of the reactor coolant system pressure boundary.

In response to this issue, the NRC issued Information Notice 87-44 (9/87), with supplement (3/88), and Bulletin 88-09 (7/88).Bulletin 88-09 requested an inspection program be implemented to monitor thimble tube performance, with the program to include acceptance criterion, inspection methodology and frequency. Letter TXX-89781 provides a response to this bulletin and describes the intention of TU Electric to comply with the bulletins' requirements. .

The augmented inservice inspection shall include a full length examination, within the limitations of probe travel, of all 58 thimble tubes using standard eddy current testing (ET) techniques. Supplementary techniques or methods may be used for further evaluation. These examinations shall be conducted during the first refueling outage with subsequent examinations determined by the results obtained during previous examination.

Acceptance criteria for this activity is as follows:

W,< 80%: No action required W, > 80%: Cap or reposition Use the following equation to calculate predicted wear:

W, = W, (N,/N,)"

Where:

N, = Accumulated time at w hich wear depth is to be calculated p N, = Operating time accumulated before inspection g W, = Percent Wear Depth at time N.

W, = Percent Wear Depth at the time of the inspection n= 0.99 Summary Discussion

a. Governing Document - NRC Bulletin 88-09, CPSES-9006199.
b. Exam items and Boundaries -All 58 thimble tubes to the extent possible of the full length.
c. NDE Method and Schedule - ET to be performed on a schedule based upon previous examinations..
d. Acceptance Criteria -See above discussion based on WCAP 12866.
e. Special Reports - A special report will be issued to the NRC within 30 days of completion of the thimble tube inspection conducted during the first outage. This report was submitted under letter TXX-91455. Following the first inspection no special reports are required.

O V

(1)

9, TUBEID OUTAGE B'd COMMENTS A9 RF01 0

-- RF02 0 RF04 0 RF06 0 A-l l RF01 0 RF02 0-RF04 0 RF06 0 B-3 RF01 0 RF02 0 RF04 0 RF06 0 B-6 RF01 0 RF02- 0 RF04 0 RF06 0 B-8 RF01 0 RF02 0 RF04 0 RF06 0 B-13 RF01 0

'RF02 0 RF04 0 RF06 0 C-5 RF01 0 RF02 0 RF04 0 RF06 0 O' C7- RF01 RF02 0

0 RF04 0 RF06 0 C8 RF01 0 RF02 0 RF04 0 RF06 0 D-3 RF01.. O RF02 0 RF04 0 RF06 0 D-8 RF01 0 RF02 0 RF04 0 RF06 0 D-10 RF01 0 RF02 0 RF04 35 ONE 95-253 RF06 42 ONE 98-432 D-12 RF01 0 RF02 0 RF04 0 RF06 0 D-14 RF01 0 O RF02 RF04 0

0 RF06 27 ONE 98-432 (2)

p. . .

t TUBEID OUTAGE Ed COMMENTS E-5 RF01 0 hV RF02 RF04 0

0 RF06 0 j E-9 -RF01 0 RF02 0 RF04 0-RF06 0 E-11 RF01 0 RF02 0 RF04 0 RF06 0 F-1 RF01 0 RF02 0 RF04 0 RF06 0 F-3 RF01 0 RF02 0 RF04 0 RF06 0 F-7 RF01 0 RF02 0 RF04 0 RF06 0 F-8 RF01 0 RF02 0 0 F 14 RF04 RF06 RF01 0

0 0

RF02 0 RF04 0 RF06 0 G-5 RF01 0 RF02 0 RF04 0 RF06 0 G-9 RF01 0 RF02 0 RF04 0 RF06 0 G-12 RF01 0 RF02 0 i RF04 0 1 RF06 0 i H-2 RF01 0 RF02 0 RF04 0 RF06 0 H-3 RF01 0 RF02 0 RF04 0 RF06 0 0 11-4 RF01 RF02 RF04 0

0 0

RF06 0 (3)

e-s-'

TUBE ID OUTAGE Ed COM MENTS H-6 RF01 0 RF02 0 L' RF04 0 RF06 0 H-11 PJO1 0 RF02 0 RF04 0 RF06 0 11 13 RF01 0 RF02 0 RF04 0 RF06 0 11-1 5 RF01 0 RF02 0 RF04 0 RF06 0 l J-l RF01 0 RF02 0 MM 0 j

RF06 19 ONE 98-432 t J-7 RF01 0 l RF02 0 RF04 0 RF06 0 J-8 RF01 0 RF02 9 TE 92-2603 O

RF04 10 ONE 95-253 l RF06 20 ONE 98-432 I J 10 RF01 0 I RF02 0 i RF04 0 '

RF06 0 .

J-14 RF01 17 TE 92-496 l RF02 11 TE 92-2603 RF04 14 ONE 95 253 l RF06 34 ONE 98-432 l K-2 RF01 0 RF02 0 RF04 0 RF06 0 K-6 RF01 0 RF02 0 RF04 0 RF06 0 )

K-12 RF01 0 RF02- 0 RF04 0 RF06 0 L5 RF01 0 RF02 0 RF04 0 RF06 19 ONE 98-432 0 L-8 RF01 RF02 RF04 0

0 0

RF06 0 (4)

r- 1 I

TUBE ID OUTAGE Ed C.OMM ENTS L-10 RF01 11 TE 92-496 O%/

RF02 RF04 20 31 TE 92-2603 ONE 95-253 RF06 36 ONE 98-432 1-11 RF01 0 RF02 0 Rf04 0 RF06 0 L-13 RF01 0 RF02 0 RF04 0 RF06 36 ONE 98-432 L-15 RF01 0 RF02 0 RF04 0 i RF06 0 1 M-7 RF01 0 RF02 0 RF04 0 RF06 22 ONE 98-432 N-2 RF01 0 RF02 0 RF04 0 RF06 0 N-4 RF01 0 RF02 0 RF04 0 N-6 RF06 RF01 0

0 0

RF02 0 RF04 0 RF06 0 1 N-8 RF01 0  !

RF02 0 l RF04 0 RF06 0 N-13 RF01 0 RF02 0 RF04 0 RF06 0 N 14 RF01 0 RF02 0 RF04 0 RF06 32 ONE 98-432 P-4 RF01 0 RF02 0 RF04 0 RF06 0 P-9 RF01 0 RF02 0 RF04 0 RF06 0 R-6 RF01 0 RF02 0 RF04 12 ONE 95-253 RF06 9 ONE 98-432 (5)

TUBEID OUTAGE Ed COM MENTS

, R.8 RF01 0 RF02 0 RF04 0 RF06 0 R-1 i RF01 0 m,

RF02 0 RF04 0 RF06 0 0

b, (6)

p..

1 l

l$ '

MAIN STEAM AND FEEDWATER BREAK EXCLUSION PIPING

/\

/ A 5 Main Steam and Feedwater piping located in the safeguards building which has been designated as " break exclusion piping" in FSAR Section 3.6.B, is to be examined in accordance with Auxiliary Systems Branch 3-1 (Ref. FSAR 6.6.8).

This shall consist of an ultrasonic examination, to the extent practical, of all circumferential and longitudinal piping welds, except as may be exempted by ASME Section XI. ASME Section XI allows exemption from examination for piping 4" and less.

The augmented inservice inspection shall include all welds and portions thereof which meet the above criteria but w hich are not selected for examination as delineated in the ASME Section XIinservice inspection Plan. These examinations shall be distributed such that each weld or portion thereofis examined once during each 10-year inservice inspection interval.

Examination procedures and personnel shall be in accordance with the rules of ASME Section XI.

No special reports are required for this activity. Records of the examinations shall be maintained with the applicable work control document.

Results of these examinations shall be evaluated against the acceptance criteria provided in ASME Section XI, IWC-3000.

Summary Discusil0D

a. Governing Document - Auxiliary Systems Branch 3-1, FSAR 6.6.8.
b. Exam items and Boundaries - All non-exempt circumferential and longitudinal welds in the Main Steam and f]

y' Feedwater systems contained within the break exclusion zones, w hich are not scheduled to be examined as part of the Section XI insavice inspection program.

c. NDE Method and Schedule - Ultrasonic examination once per 10 year interval. The specific schedule by refueling outage is attached..
d. Acceptance Criteria ASME Section XI,IWC-3000.
e. Special Reports None.

t 1

(

l l

f%

t, v

)

l (1)

F-J =

l 1

l

('.

I

,DATE: 08/11/99 HIGH ENERGY LINE BREAK UNIT 1 INSERVICE INSPECTION PIAN PAGE: 1 l I

CIASS 2 SCHED/COMPL COMPONENTS j

'Q INSPECTION INTERVAL, PIAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l .........-. ....-...... ........... l SUB04ARY EIAMINATION AREA CAMY NDE l...... OUTAGE ..... l INSTRUCTIONS NLMBER IDENTIFICATION ITEM NO ME'IH l1 2 3 1 2 1 2 l *

  • CALIBRATION BICCK+*

MAIN STEAN 32-MS-1 001-1303-2 107200 TBX-2 2100 16 C-F-2 (TT 1 . . . C - . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R108 8778B

    • TBX 33**

107250 TBX-2 2100-16L C-F.2 ITT 1 . - . C - -

88 100% FROM WELD 16 'ID 21. TDLR LONG. SEAM C5.52 VERIFICATION BOUNDARY.

R108 877SB

    • TBX-33**

l 107700 TBX.2*2100 21 C-F 2 UT 1 . . . C . . 88 TDLR VERIFICATION BOUNDARY.

PIPI TO PIPE C5.51 RIOS 87788

[%

% **TBX-33**

108000 TBZ 2-2100 24 C.F.2 UT 1 . - . C . - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R108 877S8 l l

    • TBX-33**

108050 TBX-2-2100-24L C.F-2 (TT 1 . . - C . .

88 100% FROM WELD 21 TO 24. TDLR 14NO. SEAM C5.52 VERIFICATION BOUNDARY. I R108 877S8

    • TBX-33**

l l

MAIN STEAM MS-25 (DRIP POT) 108100 TBX-2 2100 25 C.F-2 UT 1 . . . C . . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION C5.51 R100 87688

    • TBK-22**

108200 TBX-2 2100 26 C.F.2 UT 1 . . . C . . 82 TDLR VERIFICATION BOUNDARY.

PIPE TO CAP C5.51 f R100 8748B

{

\ **TBX 22**

7e=

. DATE: 08/11/99 HIGN ENERGY LINE BREAK UNIT 1 PAGE: 3 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPOSIBBFTS O

INSPECTIOst INTERVAL, PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l ---*- -**-- ----------- .------.... l StDBtARY EXAMINATION AREA CATUY NDE l- .---0UTAGE---..- l INSTRUCTIONS NUMBER IDEBrTIFICATIO0f ITEM NO METH l1 2 3 1 2 1 2 l ** CALIBRATION BIDCE" l

MAIN STEAM 8-MS-1-257-1303-2 108300 TBX-2-2100-27 C F.2 W 1- - - - C - - 88 TDLR VERIFICATICII BOUNDARY.

BRANCH CONNECTION TO PIPE C5.51 R100 87888

    • TBX-17**

108400 TBX 2-2100 28 C-F 2 W 1- - + - C - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R108 881SB

    • TBX-17+*

108800 TBX 2-2100-31 C-F-2 W 1- - - - C + - 82 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 R108 885SB

    • TBX-17**

108900 TBX 2-2100-32 C-F-2 W 1- - - + C - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TV VALVE C5.51 R108 885SB l

    • TBX 17** l MAIN STEAN 6-2003-2 109000 TBX 2-2100-33 C F-2 ITT 1- - - - C - - 88 TVLR VERIFICATION BCUNDARY.

BRANCH CONNECTION TO FLANGE C5.51 R100 87838

    • TBX-36**

109100 TBX-2-2100-34 C-F-2 W 1- - - - C - - 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FIANGE C5.51 R108 878SB

  • *TBX - 3 6 "

109200 TBX-2 2100 35 C-F-2 UT 1 . - - C - - 48 TDIJt VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FLANGE C5.51 1 R100 878SB k * *TBK- 3 6 "

o*

I, DATE: 08/11/99 HICDI ENERGY LINE BREAK UNIT 1 PAGE: 3 INSERVICE INSPECTION PLAN CIASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND T1tIRD l ASME l PERIOD PERIOD PERIOD l SEC. EI l -...--.---- -.......... ..--....... j EUDGEARY EXAMINATION AREA CATGY NDE l ----.OUTAOE------ l INSTROCTIONS NtNSER IDElrTIFICATION IT8N NO NEI11 l1 2 3 1 2 1 2 l ** CALIBRATION BIDCK'*

MAIN STEAM 6-2003*2 109300 TBX-2-2100-36 CF2 ITT 1- - . - C - - 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FLANGE C5.51 R108 878SB

    • TBX-36**

MAIN STEAM 32-MS-1-001-1301-2 111000 TBE-2-2100-48 C-F-2 UT 1- - - . C - . 86 VALVE TO MOMENT RESTRAIFT C5.51 R108 87758

    • TBX-33**

FEEDWATER 10 FW-1-019-1103-2 412300 TBX-2 2101-13 C-F-2 17T 1- - - C - - - 88 TDLR VERIFICATION BOtMDARY.

PIPE 10 PIPE C5.51 R100A856SB

    • TBX-21**

i 112400 TBZ-2 2101-14 C-F-2 UT 1* . . C - - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A856SB

    • TBX-21**

FEEDWATER 18-FW-1 036-2003-2 112800 TBX-2 2101-17 C-F-2 ITT 1- - - C - - - 86 PIPE TO VALVE C5.51 R100A056SB

    • TBX-38**

112900 TBX 2-2101-18 C-F-2 UT 1- - - C - - . 88 VALVE TO PIPE C5.51 R100A856SB e*TBX-38**

v

F*

I. IRTE: 08/11/99 NICNE ENERGY LINE BREAX INf!T 1 PAOEt 4 INSERVICE INSPECTION PIAN C1 ASS 2 SCHED/COMPL COMPONarts l

r\

INSPECTION INTERVAL _ PIAN STAWS ,PRESERVICE YEAR 1 r!RsT sECOND THIRD l ASNE l PERIOD PERIOD PERIOD j 55C. XI l...-...........-.-.-.............l St2stARY EEANINATION AR2A CAMY NDE l- -..-0UTAOE------ l - INSTRUCTIONS Nute5R IDarfIFICATION 1796 NO METH l1 2 3 1 2 1 2 l *

  • CALIBRATION BIDCK'*

FEEDNATER 18 FN 1-036-2003-2 113000 TBX-2 2101-19 C.F.2 ITT 1- . - C . . . 86 PIPE TO NONENT RESTRAIlrf C5.51 R100A05685

    • TBI 38**

l FREDNATER 6-FN-1-091-2003 2 113200 TBX-2 2102-2 C-F-2 (Tf 1- - - C - . . 88 BRANCH CONNECTION TO PIPE C5.51 R100A8578B I

,, **TBX.34** i g3300 TBX-2-2102 3 CF2 LTf 1 - . C . - - 82 8

i PIPE TO VALVE C5.51 R100A860SB

.. 3...

113500 TBX 2 2102-4 C-F-2 UT 1 . - C . . . 82 VALVE TO PIPE C5.51 R100A861SB

    • TBX-34**

113600 TBX-2-2102-5 C-F-2 tTT 1 . - C - - . 88 I

PIPE TO ELBON C5.51 j R100A861SB ,

1

    • TBX-34** l I

113700 TBX.2-2102-6 C-F-2 tTT 1- - - C . . - 88 ELBON TO PIPE C5.51 R100A862BB

    • TBK-34**

'113800 TBX-2-2103 7 C-F.2 ITF 1- - . C . . - 88 PIPE TO ELBON C5.51

, R100A8628B v .. m -, *.

r

, DATES 08/11/99 HIGH ENERGY LINE BREAK Int!T 1 PAGE: 5 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONDrfS s~

f

, INSPEC"rION IFTERVAL, PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SBC. XI l ----------- -- -------- --- ---.... l StBBIARY REANINATION AREA CATGY NDE l*---a -0UTAGE------ l INSTRUCTIONS WUMBER IDENTIFICATION ITEN NO METH j1 2 3 1 2 1 2 l ** CALIBRATION BIDCK**

FEEDWATER 6-FN-1-091-20() 2 113900 TBI-2-2102 8 C-F-2 ITT 1- - . C = - . 88 ELBON M PIPE C5.51 R100A862SB

    • TBX-34**

114000 DX 2-2102-9 C-F-2 ITT 1- - - C - . . 80 PIPE TO VALVE C5.51

'100A862SB R

    • TBX-34**

124100 TBI-2-2102-10 C-F-2 ITT 1- - . C - - -

82 TDLR VERIFICATION BOUNDARY.

VALVE TO PIPE C5.51 R100A862SB s **TBZ 34**

FEEDWATER 6-FN 1-095-1303-2 114200 TBX-2-2102-11 C-F 2 UT 1- * - C - - - 88 TDLR VERIFICATION BOUNDAR'. Y

' PIPE TO PIPE C5.51 R100A862SB

    • TEX-35**

114300 TBX-2-2102-12 C F-2 (TT 1- - . C - - - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R100A862SB

    • TBX-35**

114500 TBX-2 2102-13 C-F 2 UT 1- - - C . - - 88 TDLR VERIFICATION BOUNDARY.

VALVE M PIPE C5.51 R100A862SB

    • TBX-35**

114600 TBX-2+2102-14 C-F 2 ITT 1- - . C . - - 88 TDLR VERIFICATION BOUNDARY.

PIPE M TEE C5.51 s

R100A862SB

    • TBX-35**

o*

  • . DhTE: 08/11/99 NIGH BNERGY LINE BREAR tm.44 1 PAGE: 6 INSERVICE INSPECTION PLAN CLASS 2 SCHED/CONPL CONPONENTS Q INSPECTION IgrTERVAL_ PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND 11tIRD l ASNE l PERIOD PERIOD PERIOD l SEC. EI l.................................l SUpstARY ERANINATION AREA CATUY NDE l....-. OUTAGE......l INSTRUCTIONS NtBGER IDEIFTIFICATICII ITBt NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION BICCR**

FEEDNATER 6 FW-1 095-1303-2 114100 TBX-2-2102-15 C-F.2 t?T 1 . . C . . - 88 TDLR VERIFICATIOli BOUNDARY.

TEE TO PIPE C5.51 R100A862SB

    • TBX.35**

1 114800 TBX-2 2102-16 C.F-2 UT 1 . - C . . .

88 TDLR VERIFICATION BOUNDARY. j PIPE TO ELBON C5.51 l l

R100A862SB

  • *TBX 3 5" i l

1 114900 TBI-2 2102 17 C.F.2 17T 1 . . C - . . 82 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 j e R100A863SB I 1

    • TBK-35**

1 115000 TBX-2 2102 18 C-F-2 tTT 1 - . C . . . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW C5.51 R100A060SB

    • TBK-35**

115100 TBX 2 2102-19 C-F-2 UT 1- . - C . . . 88 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 R100A869SB

  • *TBX- 3 5 "

11$200 TBX-2-2102 20 C-r-2 LTT 1 . . C . . - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A06988

    • TBX-35**

115300 TBI-2 2102 21 C-F.2 (TT 1 . . C - . - 88 TDLR VERIFICATION BOUNDARY.

E13ON TO PIPE C5.51 R100A060SB

    • TBX 35**

. 'DATE: 08/11/99 NIGN ENEROY LINE BREAE UNIT 1 PAOE 7 INSERVICE INSPECTION PLAN CIABS 2 SCHED/COMPL COMPONENTS O

INSPECTIO8f TNTERVAL , PLAN STATUS ,PRESERVICE YBAR l FIRST SECOND THIRD l ASNE l PERIOD PERIOD PERIOD l SgC. XI l - -~~-.-- ---- - ---- -----. -.-- l St2BIARY EXANINATION AREA CATGY NDE l------0UTAGE.----. l INSTRUCTIONS Nt2SER IDENTIFICATI088 ITEM NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION BLOCK **

FEEDNATER 6-FN-1-095-1303-2 115400 TBX-2-2102 22 C F.2 ITT 1- - - C - - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A065SB

    • TBX-35**

115500 TBK-2-2102 23 C-F-2 UT 1+ - - C - - - 88 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 R100A8648B

    • TBX-35**

115600 TBF-2-2102-24 C.F 2 17T 1- - - C - - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A864SB O **TBX-35**

113700 TEX 2-2102 25 C-F-2 ITT 1- - - C - - - 88 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 R100A86488

    • TBK-35**

115800 TBX 2 2102 26 C-F-2 UT 1- - - C - - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A864SB

    • TBK-35**

NAIN STRAM 32-NS-1-002-1303-2 122600 TBX-1+2200-15 C F-2 LTT 1- - - - -

C . 88 ELR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100 877SB

    • TBX-33**

122650 TBX.2 2200-15L C F-2 UT 1- - . . . C - 80 1005 FROM NELD 15 TO 20. TDLR LONG. SEAN C5.52 VERIFICATION BOUNDARY.

O R108 877S8

\

% **TBX-33**

1

. %TE : 08/11/99 HIGH ENERGY LINE BREAK UNIT 1 PAGE 8 INSERVICE INSPECTION PIAN CLASS 2 SCHED/COMPL COMPONENTS

/%

t i V INSPECTION IlrfERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l ------+---- ----..-..-- ----------- l StBBRARY EEANINATION AREA CATQY NDE l------0UTA0E- - ---

' l INSTRUCTIONS NUISER ID8IFFIFICATION ITB4 NO ME111 l1 2 3 1 2 1 2 l ** CALIBRATION BLOCK **

MAIN STEAM 32-MS-1-002-1303-2 123100 TBX-1-2200-20 C-F-2 ITT 1- - - - - C - 88 TPLR VERIFICATION BOUl4DARY.

PIPE TO PIPE C5.51 R108 8778B eetBX.33ee 121400 TBK-1-2200-23 C-F-2 UT 1- - - - - C - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R100 8778B

    • TBX-33**

123450 TBX-2-2200-23L C-F-2 UT 1- - - - . C - 82 1006 FROM NELD 20 TO 23. TDLR IcNG. SEAM C5.52 VERIFICATION BOUNDARY.

R100 87789

.(A ..rBx.33..

MTN STEAM MS 24 (DRIP POT) 123500 TBX-1 2200 24 C-F-2 ITT 1- - - - C - 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO PIPE C5.51 R108 876SB j i

    • TBZ 22** l I

J i

MAIN STEAM 8-MS 1-240-1303-2 123700 TBX-1-2200-26 C-F-2 tTF 1- - - - - C - 88 1TILR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO PIPE C5.51 1

R100 8789B i

    • TBX-17**

123000 TBI 1 2200-27 C-F-2 (TF 1- - - - - C - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R108 80185

    • TBX-17**

C

l I

i 1

. DATES 08/11/99 HIGH ENERGY LINE BREAK LINIT 1 PAGE: B INSERVICE INSPECTION PLAN CIASS 2 SCHED/COMPL COMPONElrFS A

f

( INSPECTION IlrTERVAL, ., PIAN STAWS _PRESERVICE YEAR l FIRST SECOND 'IWIRD l ASME l PERIOD PERIOD PERIOD l j SEC. XI l ........... ........... ........... l StBBEARY EIANIMATION AREA CATUY NDE l...... OUTAGE-.*-.* l INSTRUCTIONS WUNBER IDElrTIFICATION ITEN NO Nr!M l1 2 3 1 2 1 2 l ** CALIBRATION B!4CK**

I NAIN STEAN 0-NS-1-240-1303-2 124000 TBK-1 2200 28 C-F-2 ITT 1 . . . . C - 88 TDLR VERIFICATION BOUNDARY.

VALVE TO PIPE C5.51 R108 883SB .

i

    • TBX 17+* l

)

124100 TBI-1 2200-29 C F.2 ITT 1 - . . . C . 85 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 i R108 80388 ,

    • TBK-17**

124200 TBX 1-2200-30 C.F.2 ITT 1- - . . . C . 88 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 i

R108 88588 i l

, ..TBI.17..

\ \

124300 TBI.2-2200*11 C.F-2 ITT 1 . - - - C - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R108 885SB e*TRI.17ee NAIN ffEAN 6-2003-2 134500 TBI-2 2200-33 C-F-2 UT 1 . . . . C - 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECf!ON TO FLANGE C5.51 R108 878SB

    • TBX 36**

124600 TBX 2-2200-34 C F-2 LTT 1 . . . - C - 88 TDLR VERIFICATION BOUNDARY.

BilANCH CONNEC" TION TO FIANCE C5.51 RIOS 87858 e*TBK 36**

124700 TBI 2-2200-35 C-F-2 11T 1 . - - . C - 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FIANGE C5.51 R100 878SB

    • TBX 36**

e*

  • DATE: 08/11/99 MIGH ENERGY LINE BREAK tatIT 1

. PAGE: 10 INSERVICE INSPECTIO81 PLAh CIASS 2 SCHED/COMPL COMPONENTS i

\j INSPECTION INTERVAL, PIAN STAWS _PRESERVICE YEAR j FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l Ste. x1 I ........... ........... ........... I SU8BEARY E1 ANIMATION AREA CAMY NDE l...... OUTAGE...... l INSTRUCTIONS IRBEBER IDENTIFICATION ITDI NO ME'11I l1 2 3 1 2 1 2 l ** CALIBRATION BLOCE**

MAIN STRAN 6-2003-2 124800 TBX.2 2200 36 C-F.2 UT 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FLAN 05 C5.51 R108 87883

    • TBZ-36**

MAIN STEAN 32-MS-1-002-1305-2 126300 3X 2-2200-47 C-F 2 ITT 1 . . . . C . 86 VALVE W MOMENT RESTRAINT C5.51 R108 877S8

    • TBX-33**

FEEDNATER 18-FN-1-018-1303-2 L i 129100 TBX-2-2201-28 C F-2 UT 1C . . . . . . 88 TDLR VERIFICATION BOUNDARY. j PIPE TO PIPE C5.51 R100A856SB

..TBX.21**

129200 TBK-2-2201 29 C-F-2 UT 1C . . . . . . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A856SB

    • TBX-21**

FEEDNATER 18-1-FN-035-2003-2 129300 TBX-2-2201-30 C-F-2 17f 1C . - . . . . 82 TDLR VERIFICATION BOUNDARY.

PIPE W VALVE C5.51 R100A856SB

    • TBX-38**

129400 TBX 2-2201 31 C-F-2 ITT 1C . . . . . . 82 VALVE TO PIPE C5.51 R100A856SB

    • TBX-38**

\

e*

I . DATE 08/11/99 MION ENERQY LINE BREAK t%flT 1 PAGE: 11 INSERVICE INSPEC"f!ON PIAN CIASS 2 SCHED/CONPL COMPONIDrrs

(/ INSPECTION IbrTERVAL, PLAN STAMS ,PRESERVICE YEAR l l rIRST sECOND THIRD t l ASNK l PERIOD PERIOD PERIOD  !

\

!- SEC. 11 l * -----.-=. . -- --.... ...--..-.. l StBetARY EXAMINATION AREA CAMY NDE l.--.--0UTAGE-* -

-l INSTRUCTIONS NUISER IDWrTIFICATION ITEM NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION BIDCK*

  • FREDNATER 18-1-FN-035-2003-2 128500 TBX-2 2201-32 C-F-2 UT 1C - - - - - - 82 PIPE TO VALVE C5.51 R100A85683 eeTBX-38**

129600 TBE-2-2201-33 C F-2 UT 1C - - - - * . 88 VALVE M PIPE C5.51 R100A856SB eetgX.33*e FREDNATER 6-FN-1-092-2003-2 39900 TBK-2-2202-2 0-F-2 UT 1C - - - - - - 88 BRANCH CONNECTION TO PIPE C5.51 R100A05789

    • TBK-348*

130000 TBX 2-2202 3 C-F-2 UT 1C * * . . - - 88 PIPE TO VALVE C5.51 R100A060SB

    • TBK-34**

130200 TBX-2 2202-4 C-F 2 (TT 1C - - . - . - 88 VALVE TO PIPE C5.51 R100A86185

    • TBI-34**

130300 TBX 2-2202-5 CF2 tTT 1C - - - - - - 82 l PIPE M ELBON C5 51 R100A862SB

    • TBX 34**

130400 TBX-2 2202-6 C-F-2 (fr 1C - - . - - - 88 ELBON M PIPE C5.51 k **TBX 34**

g.

  1. . DATE: 08/11/99 HIGH ENERC LINE BREAK GIT 1 PAGE: 12 INSERVICE .*NSPECTION PLAN CIASS 2 SCHED/CONPL COMPONBrTS INSPEL" TION IlrTERVAL, PLAN STATUS ,,PRESERVICE YEAR l FIRST SECOND THIRD l ASNE l PERIOD PERIOD PERIOD l n SEC. 11 l --..--. --- --- ---...- ----- --... l SUBSEARY EEANIMATION AREA CATGY NDE l..---* OUTAGE.- . ... l INSTRUCTIONS NUNBER IDEIFTIFICATION 3798 NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION BICCK'*

FEEDefATER 6 PW-1-092-2003-2 130500 TRX-2-2202-7 C-F.2 ITT 1C . . . . - - 88 PIPE 'l'O ELBON C5.51 R100A063SB

    • TBK-34**

130600 TBX 2 2202-8 C-F 2 (TT 1C . . . . - -

88 ELBON TO PIPE C5.51 R100A863SB

    • TBX-34**

170800 TBX-2-2202-10 C-F-2 tTT 1C - - - - - - 88 TDLR VERIFICATION BOUNDARY.

VALVE TO PIPE C5.51 R100A463SB

    • TBX-34**

f LEEDtIATER 6-FN-1-096-1303-2 130900 TBZ-2-2202-11 C-F-2 ITT 1C - - - - - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A063SB

    • TBX-35**

131000 TBX-2-2202-12 C-F-2 UT 1C - = * . - - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R100A863SB

    • Tax-35**

131100 TBE 2 2202-13 C-F 2 UT 1C - - . - - . 88 TDLR VERIFICATION BOUNDARY.

VALVE TO PIPE C5.51 R100A063SB

    • TBX 35**

131200 TBX-2-2202-14 C-F-2 UT 1C . . . . - . 88 TDLR VF.RIFICATION BOUNDARY.

PIPE TO TER C5.51 R100A863SB C- **TBX-35**

t

4

)

  • DATBs 08/11/99 HIGH ENERGY LINE IREAK (21T 1 PAGE: 13 l INSERVICE INSPECTION PLAN l CIASS 2 SCHED/COMPL COMPONEBrFS lO \

Q INSPECTION IlffERVAL, PLAN STATUS _PRESERVICE YEAR

! l FIRST SECOND WIRD l ASNE l PERIOD PERIOD PERIOD l SEC. XI l ..........- .....-..... ........... l l SGetARY EIANIMATION AREA CAMY NDE l -.... OUTAGE..--.-l INSTRUCTIONS 3RBSER IDerf!FICATION ITB4 NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION BLOCK **

FEEDNATER 6-FN-1-096-1303-2 131300 TBX 2-2202 15 C-F-2 LTT 1C - . . - . - 88 TDLR VERIFICATION BOUNDARY. j TEE M PIPE C5.51 R100A063SB

    • TBZ-35**

131400 TBX-2 2202-16 C-F-2 UT 1C . . . . . . 88 TDLR VERIFICATION BOUNDARY. I PIPE TO ELBON C5.51 R100A863!tB

    • TBK 35**

131500 TEX 2 2202-17 C-F-2 UT 1C . . . - . . 88 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51

/ R100A864SB

    • TBX-35**

131600 DX-2-2202 18 C-F-2 UT 1C - . . . - - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A868SB

    • Tag.3$**

131700 TBI 2-2202-19 C-F-2 ITT 3C - - . - - - 88 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 R100A87058

    • TBI-35**

131000 TBI-2 2202 20 C-F-2 (Tf 1C - . . - - . 80 TDLR VFRIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A870SB

    • TBX 35**

131900 TBX 2-2202-21 C-F-2 ITT 1C . - - - . - 88 TDLR VERIFICATION BOUNDARY.

ELBON M PIPE C5.51 R100A068SB

    • TBX-35**

\

i l

4*

. DATE: 08/11/99 NIN WIERGY LIIIB BREAK taf171 PAGE: 14 ISISEkVICE INSPEC" TIC 0f PLAN CIAss 2 SCNED/COsePL CaptP00ferf8 .

i INSPBCTICII 13fTERVAL,, PIAff ETATUS ,PRESERVICE YEAR j FIRST SECOIID THIRD l ,

AsME l PERIOD PERIOD PERIOD l SSC. XI l .........- ..- --. -.- --- ... --- l SUIsmRY ERANIMkTION AREA CATOY IIDE la .

.-.*OUTA0E***- -l INSTRIK"TI0pss I 3RNSEst IDertIFICkTICII 1791 ISO METM j1 2 3 1 2 1 2 l **CALIBRATIODf BICCK**

FREDIfATER 6 FN-1-096-1303-2 132000 TBM-2 2202-22 CF2 (ft 1C + - - - - -

et TDLR VERIFICATI0ef BOUNDARY.

(

1 PIPE TO ELB00f C5.51 R100A065SB

    • TBK-35**

4 132100 TBX-2-2202 23 C F.2 17f IC - . - . - - 80 TDLR VERIFICATICII BOUIIDARY.

ELBON '!V PIPE C5.51 R100A464SB

    • TBX-35**

132200 TBX-2-2202-24 C-F 2 ITF 1C . - - - - -

88 TDLR VERIFICATI00f BOUNDARY.

PIPE TO ELBott C5.51 1 .. ,B..,,..

112300 TEX 2 7202-25 C-F-2 UT 1C * - . . . - 88 TDLR VERIFICATION BOUNDARY.

ELBON *10 PIPE C5.51 R100A864SB

    • TBX-35**

132400 TEX 2-2202-26 C-F-2 UT 1C - - - - . - SS TDLR VERIFICATI0pf BOUNDARY.

PIPE TO PIPE C5.51 i R100A864F3 ,

l

..TBX-35**

NAIN STEAM 32-NS-1-003-1303-2 l

141600 TBX-2 2300 25 C-F.2 UT 1- . - - C . - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 l R108 4778B J

    • TBX-33** l 1

141650 TBE-2-2300-25L C-F-2 UT 1 . . . C . . 88 100% FRON NELD 25 TO 29. TDLR I40lG. SEAN C5.52 VERIFICAT1000 BOUNDARY.

R100 $7785 eetax-33ee l

pe<-

  • , DATE: 08/11/99 MIGN WIERGY LINE BREAK CZIT 1 PAGE: 15 INSERVICE INSPECTIDIl PIAN CIASE 2 SCHED/COMPL COMPONElf78 INSPECTICII IIrTERVAL, PIAN STATUS ,PRESERVICE YEAR l FIR $T SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. II l ........... ........... ........... l l SuledARY BEANIIIATION AREA CAMY IIDE l...** OUTAGE ....- l INSTRUCTIONS WUISER IDEIFTIFICATION ITEN 910 NETN j1 2 3 1 2 1 3 l * *CALIBRATICII BIDCE*
  • I MAIN STRAN 32-MS-1-003-1303-2 142000 TBX-2 2300 29 C.F.2 ITT 1* . . . C * - 88 70LR VERIFICATICII BOUNDARY.

PIPE TO PIPE C5.51 R108 87783 eerBx.33ee 142400 TBK 2-3300-33 C-F.2 UT 1 . . . C . . 82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R108 877SB

    • TBX 33**

142450 TBX-2-2300 33L C.F.2 tTT 1 . . . C . . 88 100% FROM WELD 29 70 33. TDLR IANO. SEAM C5.52 VERIFICATION BOUNDARY, R108 87768

    • TBx.33*e MAIN STEAM MS-023 (DRIP POT) 142600 TBX.2 2300-34 C-F-2 UT 1 . . - C - . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO PIPE C5.51 R108 87688

    • TBX.22**

1 142700 TBX 2 2300-35 C-F-2 UT 1 . . . C * - 82 TDLR VERIFICATION BOUNDARY. 1 PIPE TO CAP C5.51 i R108 87358

    • TEX.22**

l l

MAIN STEAM 8-MS-1-223-1303-2 142900 TBX.2 2300-37 C F-2 UT 1 . . . C . . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R108 880B l

    • TBX 17**

) .

l

1

[e*

  • , DATES 08/11/89 CIGN 353110T LINE EREAK UNIT 1 PAGE: 16 I

INSERVICE INSPECTICBI F1AN l

l CIAss a sCNED/C0erPL CoNPOaruerrs b

INSPECT 1001 INTERVAL, PLPA STATUS _PRESERVICE YEAR l FIRST SECOND , THIRD l AstEE l PERIOD PERIOD PERIOD j SSC. XI l.**..--.............-..-.....-.l StBSEARY EIANIIIATIcel AREA CAMY IIDE l--- --007 AGE- .... j INSTRUCTICef8 NUISER IDWITIFICATIDIf 1738110 Isr!1f l1 2.3 1 2 1 2 l **CALIBRAT1008 BLOCK **

je&IN STEAN 0-NS-1-223 1303 2 143200 TEX-2-2300-39 C-F-2 IFT 1- - - - C . . 88 TDLR VERIFICATIcet BOUNDARY.

PIPE 70 ELBOtf C5.51 R100 884SB eeTgE.17ee 143300 TBX 2-2300 40 C-F-2 (TT 1- - -

- C . . SS TOLR VERIFICATIOli BOUBIDARY.

EIAOtf TO PIPE C5.51 R100 SSSSB

    • TBK-17**

I l

143400 TBX-2 2300-41 C-F 2 UT 1- - - - C - - 88 TDLR VERIFICATICII BOUlfDARY.

PIPE TO VALVE C5.51 )

R100 883SB l

( eeTBX 17**

NAIN STEAM 6-2003-2  !

1433GO TBX 2-2300-42 C-F-2 UT 1* . . - C .

  • 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FIANGE C5.51 MOS 87088

    • TBX-36**

143600 TBK 2-2300-43 C-F-2 UT 1- - - - C - - 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FIANGE C5.51 R108 87898

    • TBX 36**

143700 TBK-2-2300 44 C-F 2 ITT 1- - - - C . . 88 TDLR VERIFICATION BOUNDARY.

BRANCH COIOfECTION TO FLAlfGE C5.51 R100 870s3

    • TBX 36**

143800 TBI-2-2300 45 CF2 UT 1- + . . C - . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECT!001 TO FIANOR C5.51 R100 878SB g **TBI-36**

o y- 1

.  !*TE: 08/11/99 CION ENERGf LINE BREAX tJNIT 1 PAOE 17 INSERVICE INSPECTION PIAN CIASS 2 SCHED/COMPL COMPONWrtS a INSPECTION INTERVAL _ PIAN STATUS ,,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l gBC. 12 l ........... ........... ........... l stsetARY EKAMINATION AREA CATGY NDE l------0UTAGE- --.- l INSTRUCTIONS NtBSER IDWITIFICATION ITEM NO METH l1 2 3 1 2 1 2 l ** CALIBRATION BIDCE**

MAIN BTEAM 4 2003-2 143900 TBK-2 2300-46 C-F-2 (TF 1- - - - C ~ - SS WLR VERIFICATION BOUNDARY.

BRANCH CONNEC" TION M FLANGE C5.51 R100 87888

    • TEX-36**

MAIN STEAM 32 MS-1-003-1103-2 146200 TBX-2 2300-68 C-F 2 ITF 1- - - - C - - 86 VALVE 'IO MOMENT RESTRAINT C5.51 R100 87788

    • TBX-33**

I PREDWATER 18-FN-1-017-1303-2 j

( l t 148800 TBK-2-2301 24 C-F-2 UT 1C - - - - - - 88 TDLR VERIFICATION BOUNDARY. I PIPE TO PIPE C5.51 R100A856SB

    • TBx.21**

1 1

148900 TBX-2-2301-25 C-F-2 UT 1C - - - - - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A056BB

    • TBX-21** j PEEDNATER 18-FW-1-034-2003 2 149000 TBX 2-2301-26 C-F-2 ITT 1C - - - - - - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R100A456SB

    • TBX-38**

149200 TBK 2-2301-27 C-F-2 ITT 1C - . . . - - 82 VALVE TO PIPE C5.51 R100A056SB

    • TBX-38**

e' IATBs 06/11/99 NION ENERGY LINE SkEAR 1281 7 1 PAGE: 18 INSERVICE INSPECTION PIAN CIAss a sCNED/COMPL COMP 00mWTS (j INSPECTION INTERVAL, PIAN STA1US ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l sEc. x! l ........... ........... ........... l StBGEARY BEANIMATION AREA CATGY NDE l- -- -0UTAGE- .- .l INSTRUC"f!ONS NtBSER IDWfTIFICATION 1794 NO NB118 l1 2 2 1 2 1 2 l ** CALIBRATION BLOCE**

FREDNATER 10-FN-1-034-2003-2 l

149300 TEX-2-2301 28 C-F-2 ITT 1C . - - - - - 82 PIPE TO VALVE C5.51 R100A05658

    • TBX-38**

149400 TBX 2-2301 29 C-F-2 UT 1C - * - . - - 88 VALVE TO PIPE C5.51 R100A85688

    • TEX-38**

149500 TBX 2-2301-30 C-F 2 UT 1C . . . . - - 82 PIPE TV NOMENT RESTRAIlff C5.51 R100A856SB e*TBX.30**

i l

FREDNATER 6-PN-1-093-2003-2 l i

l 149700 TBX-2-2302 2 C-F-2 LTr 1C - - . . - - 88 BRANCH CONNECTION TO PIPE C5.51 l R100A8578B l

    • TBX-34** j 1

l l

149800 TilX-2-2302-3 C-F-2 fff 1C - * . - - - 80 PIPE TO VALVE C5.51 R100A8608B

    • TBX-34**

149900 TBX 2 2302-4 C-F-2 UT 1C . - - . . . 88 VALVE TO PIPE C5.51 R100A861SB ,

i

    • TBX-34** I i

l l 150000 TBX 2 2302-5 C-F-2 ITT 1C - - - - - - 88 PIPE to ELbON C5.51 R100A862SB l

! **TBX-34**

l l

l l

[

. DATE: 08/11/99 HIGH RNERGY LINE BREAK UNIT 1 PAGE: 19 l INSERVICE INSPECTION PLAN l

l CLASS 2 SCHED/COMPL COMPONWrFS l

i INSPEC"f!ON INTERVAL, PIAN STATUS ,PRESERVICE YEAR

.l FIRST SECOND THIRD l ASME l PEPIOD PERIOD PERIOD l SBC. XI l......**........................]

j SuletARY EIANIMATION ARBA CATUY NDE l*.....OUTAOE..*.*. l INSTRUCTIONS NUBSER IDerf!FICATION 1798 NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION BLOCK **

FREDNATER 6 FN.1 093-2003-2 150100 MX.2 2302 6 C.F.2 UT 1C . . . . * - 80 ELBON TO PIPE C5.51 R100A063SB eergx.34ee 150200 TBX.2-2302 7 C-F.2 UT 1C . . . . . . 88 PIPE TO ELBON C5.51  !

l R100A063SB eeTBx.34ee i

1 i

150300 TBX.2 2302 0 C.F.2 UT 1C . . . . . . .88 l ELBON TO PIPE C5.51 I R100A063SB

    • TBX.34**

150500 TBX-2-2302 10 C-F.2 UT 1C . . . . . . 82 TDLR VERIFICATION BOUNDARY, VALVE TO PIPE C5.51 R100AB63SB

    • TBX-34**

l PIEDNATER 6-FN.1 097 1303 2 150600 TBX-2 2302 11 C.F 2 UT 1C . . . . . . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A863SB

    • TBX.35**

150700 TBX 2 2302 12 C.F.2 tTT 1C . . . * * - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 R100A063SB

    • TBX.35**

150000 TBX 2-2302 13 C-F.2 tTF 1C = . . . . . 82 TDLR VERIFICATION BOUNDARY.

VALVE TO PIPE C5.51 i R100A063SB l Q **TBX.35**

l

U* )

. DATES 08/11/99 HICN! ENERGY LINE BREAR IBf!T 1 PAGE: 20 l

INSERVICE INSPECTION PIAN l- CIASS 2 SCHED/COMPL CONPONENTS 1

INSPECTION INT 3 RIAL , PIAN STATUS _PRESERVICE YEAR

! l FIRST SECOND '!WIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l .---------- -- --- ---- -- *------ l St3OIARY EXAMINATION ARSA CATOY NDE l..----0UTAGE-*---. l INSTRUCTIONS Nt3BER IDWFTIFICATION ITEN NO NETN l1 2 3 1 2 1 2 l **CALIB8ATION BICCE**

FREDWATER 6-FN-1-097-1301-2 150900 TBX 2-2302-14 C-F.2 UT 1C + - - - - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO TEE C5.51 R100A863SB

    • TBX-35**

l 4

l 1

151000 TBX-2-2302 15 C F-2 UT 1C - . . . - . 88 TDLR VERIFICATION BOUNDARY.

TEE TO PIPE C5.51 R100A063SS

    • TBX-35**

I i

151100 TBK-2-2302-16 C F-2 UT 1C - . - . . . 82 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51

% R100A463SB

    • TBX 35** .

l 151200 TBX 2-2302 17 C-F 2 UT 1C - - - - - - 82 TDLR VERIFICATION BOUNDARY.

ELBON M PIPE C5.51 R100A864SB

    • TBX-35**

151300 TEX 2-2302-18 C-F-2 UT 14 . . . - - . 88 TDLR VERIFICATION BOUNDARY.

PIPE % ELBON C5.51 R100A06998 l

    • TBX-35**

l 151400 TBX-2-2302-19 C-F-2 UT 1C - . . . - - 88 TDLR VERIFICATION BOUNDARY.

(

ELBON 70 PIPE C5.51

R100A070SB f **TBX 35**

l 151500 TEX-2-2302-20 C-F-2 UT 1C - . . . . . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A070SB

    • TBX-35**

o

e *

. DATE: 08/11/99 NIGH ENERGY LINE BREAR C217 1 PAGE: 21 INSERVICE INSPECTION PIAN C1 ASS 2 SCMED/COMPL COMPONENTS INSPECTION IIFTERVAL, PZAN STAWS ,PRESERVICE YEAR j FIRST SECOND THIRD l ASNE l PERIOD PERIOD PERIOD l 35C. 13 l.--------.--........-.--.-.....l SUBBIARY EIANINATION AREA CATOY NDE l.--- .OUTA0E-*-e ..

l INSTRUCTIONS NUISER IDENTIFICATIOst ITSE NO Nr!1" l1 2 3 1 2 1 2 l ** CALIBRATION BIDCR**

FREDHATER 6-Fw 1-097 1301 2 151600 TBX-2-2302-21 C F-2 UT 1C - . . - . - 88 TDLR VERIFICATIOtf BOUNDARY.

ELBON TO PIPE C5.51 R100A86988

    • TBX-35**

151700 TBX-2-2302 22' C-F-2 LTT 1C - - - - - - 88 TDIJt VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A865SB

    • TBX-35**

131800 TBX-2-2302 23 C-F 2 (TT 1C - - - - - - 88 TDLR VERIFICATION BOUNDARY.

ELBON TO PIPE C5.51 R100A864SB 1

  • **TBX 35**

( 1 151900 TBX-2 2302-24 C-F-2 UT 1C - - . . - - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A064SB

    • TBX-35**

! 152000 TBI 2-2302 25 C-F-2 ITT 1C - - - . - - 88 TDLR VERIr! CATION BOUNDARY.

l ELBON TO PIPE C5.51 R100A864SB

    • TBX-35**

l l l

152100 TBX-2-2302 26 C F-2 UT 1C . . . . . - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 l R100A864SS

    • TBx-35** l NAIN STEAM 32 NS-1-004-1303 2 l l

160500 TBX-2-2400-18 C-F-2 ITT 1 . - - - C . 88 TDLF. VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51  !

R108 8775B l w **TBX-33** i i

f i

1 i

-, . 1

  1. . DATBs 08/11/89 CION ENERGY LINE BREAR 12817 1 PAOE: 22 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONEFTS t

k INSPECTION IFfBRVAL_ PLAN STATUS _PRESERVICE YEAR l r!RST. SECOND Tu!RD i ASME l PERIOD PERIOD PERIOD l SEC. II l ........... ........... ........... l SUteIARY EXAMINATION AREA CAMY NDE l.....-0UTA0E.... .l INSTRIK*TIONS NUMBER IDErf!FICATION ITBt NO NETH l1 2 3 1 2 1 2 l *

  • CALIBRATION SIDCE*
  • MAIN STEAN 32-M8 1-004-1303 2 160550 TBI 2 2400 18L. C.F.2 ITT 1 . . . . C . 88 1004 FROM WEIA 18 TO 22. TDLR LONG. SEAM C5.52 VERIFICATION BOUNDARY.

R100 877RB

    • TBX.33**

160900 TBX 2 2400-22 C F.2 UT 1 . . . . C . 80 TDLR VERIFICATION BOUNDARY. ,

l PIPE TO PIPE C5.51 j R100 8778B

    • TB3 33**

161350 TBX 2 2400 26L C F.2 (TT 1 . * . . C . 42 100% FROM 22 TO 26. TDLR 10NG, SEAM C5.52 Var #IFICATION BOUNDARY.

^ R108 877RB.

    • TBX 33**

~

MAIN STEAM MS-26 (DRIP POT) 161400 TBI 2 2400 27 C-F.2 ITT 1 . - . . C . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO PIPE C5.51 RIOS 87658

    • TBX.22**

161500 TBX-2 2400 28 C-F.2 LTT 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

PIP". TO CAP C5.51 R100 87485 e*TBX.22**

1 l

l MAIN STEAM 8-MS-1-274-1303 2 161700 TBX.2 2400-30' C.F.2  !?T 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 V100 881SB

    • TBI-17**

O

4

. IATE: 08/11/99 HIGH ENERGY LINE BREAK UNIT 1 PAGE: 23 INSERVICE INSPECTION PLAN CIASS 2 SCHED/COMPL COMPONENTS INSPECTION 13rTERVAL, PIAN STAWS ,PRESERVICE YEAR j FIRST SECOND THIRD l ASNE l PERIOD PERIOD PERIOb l SEC. XI l ........... ........... ........... l SUBBIARY EXANINATION AREA CA'FN NDE l......OUTAOE-.. ...

l INSTRUCTIONS NUDGER IDBrf!FICATION 1738 NO NETH l1 2 3 1 2 1 2 l *

  • CALIBRATION E!.DCIL*
  • NAIN STEAN 3-NS-1-274-1303-2 162000 TBI 2 2400-32 C-F-2 ITF 1 . . . . C - 88 TDLR VERIFICATION BOUNDARY.

PIPE E ELBOW C5.51 i R108 88465

    • TBX.17**

162100 TEX-2 2400-33 C-F-2 ITF 1- . . . - C - 80 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE C5.51 R108 8858B

    • TBX.17**

1 1

I MAIN STEAM 6-2003-2

( $2300 7B2 3 2400-35 C.F.2 (TF 1- . . . . C . 88 TDLR VERIFICATION BOUNDARY.

i BRANCH CONNECTION TO FLANGE C5.51  !

R108 879S8

    • TBX-368*

l I

162400 TBX-2 2400-36 C-F-2 ITT 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FLANGE C5.51 I R108 879S8 I i

    • TBI-16**  ;

i i

162500 TBX-2-2400-37 C-F-2 ITT F. * - . - - C . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO FLANGE C5.51 RIOS 8798B

    • TBX.36**

l 162600 TBK 2-2400 38 C-F.2 ITF 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECf!ON TO FLANGE C5.51  !

R108 87988

    • TBX-36**

163700 TBX 2-2400-39 C-F.2 UT 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECf!ON TO FLANGE C5.51 R108 879SB

    • TBX 36**

(;.

. OkTE: 08/11/99 N!(BI ENERW LINE Sk2AK G!!T 1 PACE: 24 INSERVICE INSPECTION PIAN CIASS 2 SCNED/cxs PI. COMPONEIFTS l r

[

( INSPECTION INTERVAL ,

l FIRST PIAN STATUS SECOND THIRD l

,PRESERVICE YEAR ASME l PERIOD PERIOD PERIOD l sBC. XI l ........... ........... ........... l SUIsthaY EMANINkTION ARSA ' CA19Y NDE l...... OUTAGE.*.** *l INSTLJCTIONS l 3RamBR IDelTIFICATION ITWE NO Nr!11 l1 2 2 1 2 1 2 l ** CALIBRATION BICCK**

1 ........ .............................. ....... .... . ........... ........... ........... . ..............................

1 l

I MAIN STEAN 32.NS.I.004 1303 2 l

163900 TBX.2 3400 51 C.F.3 UT 1 * * . . C . 86 FIPE TO NOMBrr RESTRAINT C5.51 RIOS 0778B

    • TBX 33**

FEEDNATER 10-FN-1-020 1303-2 165100 TBX.2 2401 11 C.F.2 UT 1 . . . . C . SS TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.5%

R100A456RS

    • TBX.21**

M TER 18-FN-1 037 2003 2

/

465500 TBX-2 2401 15 C.F.2 UT 1 . . - - C - 82 PIPE 10 VALVE C5.51 R100A856RB

    • TBX.38**

165600 TBX.2 2401 16 C.F.2 ITT 1 . . . . C . 86 VALVE TO PIPE C5.51 R100A056RB eeTBX.3 gee M TER 6.PN-1 094 2003-2 165200 TBX.2 2402 2 C.F.2 ITT 1 . . . . C . 88 BRANCH CONNECTION TO PIPE C5.51 l R100A0578B

    • TBX-34**

I 166000 1DX.2 2402 1 C.F.2 UT 1 . . .

  • C . 88

]

PIPE TO VALVE C5.51 R100A059sB

    • TBX.34**

l

fe

  • 1.
  1. . DATE: 08/11/99 NIGH ENEROY 1.INE BREAK IBf!T 1 PAGE: 25

, INSERVICE INSPECTION PIAN l CIAS5 2 BCHED/COMPL CONPONEIFTS I

j INSPECTIOli 13rTERVAL_ PIAN STATUS _PRESERVICE YEAR r!RsT I sECOND Tu!RD 1 l ASNE l PERIOD PERIOD PERIOD j l sEC. E! l ........... ........... ........... j stmeShRY EXANIIIATICBI AREA CATOY NDE l-.- -. OUTAGE.--..-l INSTRUCTIONS IIUDGER IDBrTIFICAf!OII ITM NO NE138 l1 2 3 1 2 1 2 l **CALIBRATIcel BIDCK" FEEDWATER 6-FW 3-094-2003-2 166100 TBX-2 2402-4 C-F-2 UT 1- - - - - C - 88 VALVE M PIPE C5.51 R100A861SB "TBX - 3 4 *

  • 166200 TEX-2-2402-5 C-F-2 (TT 1- - - - - C - 82 PIPE TO ELBOW C5.51 R100A862SB i
    • TBX 34**

166300 TBX 2 2402-6 C-F-2 ITT 1- - - . . C - 88 ELBOW TO PIPE C5.51 R100A863SB i **TBX-348*

166400 TBX 2-2402-7 C F-2 ITT 1- - - - - C - 88 PIPE TO ELBOW C5.51 R100A863SB

  • *TBX- 3 4 "

166500 TBX-2 2402-8 C-F-2 tTT 1- - - - - C - 88 ELBOW 10 PIPS C5.51 R100A863SB

    • TBX 34**

l l

f 166600 TBX 2 2402 9 CF2 ITT 1- - - - -

C - 88 PIPE TO VALVE C5.51 R100A863SB "TBX - 3 4 *

  • FEEDWATER 6-PW 1-098-1303-2 1%5800 TBX-2-2402-11 C-F-2 ITT 1- - - - - C . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A862SB

  • *TBX 3 5"

Te *

\

j I

  1. . DATE: 08/11/99 NION ENERGY LINE BREAK CBf17 1 PAGE: 26 INSERVICE INSPECTION PLAN class 2 sCNED/COMPL COMPONENTS k IWsPECTION IrrERvnL, PLAN STATUS ,PRESERVICE YEAR l l rInst sECOND THIRD l AsNE l PERIOD PERIOD PERIOD l sEC. 51 l ........... ........... ........... l stBeqARY EEANIMATION AREA CAMY NDE l...... OUTAGE...-.. l INsTRI C IONS NUMBER IDErr!FICATION ITEN WO NE711 l1 2 3 1 2 1 2 l *
  • CALIBRATION 314CE*
  • 1 I

FEEDNATER 6-FN-1-098-1303-2 l

166900 TEX.2 2402 12 C-F.2 UT 1 . . . . C . 82 TDLR VERIFICATION BOUNDARY. l PIPE TO VALVE C5.51 R100A462sa

    • TBX-35**

1 J

167000 TBX.2 2402 13 C F.2 UT 1 . . . - C - 82 TDLR VERIFICATION BOUNDARY.

VALVE TO P!PE C5.51 R100ASE2SB

    • TEX.35**

I 167100 TBX.2 2402 14 C-F.2 (Tt 1 . . - .

C - 88 TDLR VERIFICATION BOUNDARY.

PIPE TO TEE C5.51 R100A062SB J

) ..TBX.,5..

l 167200 TBX.2 2402 15 C F.2 ITT 1 . e . . C - 88 TDLR VERIFICATION BOUNDARY.

TEE 'IV PIPE C5.51 R100A062SB

    • TBX 35** .

1 187300 TBX-2 2402 16 C-F.2 UT 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A862SB

    • TBX.35**

167400 TBX.2-2402-17 C.F.2 tTf 1 . . . . C . 88 TDIJL VERIFICATION BOUNDARY.

ELBON TO PIPL C5.51 R100A063SB

    • TBX-35**

167500 TBX-2 2402 18 C.F.2 ITT 1 . . . . C . 88 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBON C5.51 R100A969SB

    • TBX.35**

l 1

e *

  1. . DATE: 08/11/99 HIGH BBfBRGY LINE BREAK Ulf17 1 PAOEs 27 l INSERVICE INSPECTICSI PLAN ,

CLASS 2 SCHED/COMPL COMPONENTS j INSPECTION IIrrERVAL, PIAN STAWS _PRESERVICE YEAR l FIRST SECOND THIRD l ASNB l PERIOD PERIOD PERIOD \

SEC. XI l------.........-......------....l l

sugetARY EIANINATICII AREA CATOY NDE l ----.OUTAOE- -.-. l INSTRUCTIONS j NUISER IDEBrrIFICATIOII 1731 NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION B14CE**

FEEDefATER 6 FW-1-090 1103-2 167600 TBX.2-2402-19 C-F-2 W 1 - - - . C - $$ TDLR VERIFICATIOIf BOUNDARY.

ELBOW TO PIPE C5.51 R100k870SB

    • TBX-35**

167700 TBX-2 2402-20 C-F-2 W 1- . . - - C - 88 TDLR VERIFICATIOtt $OUNDARY.

PIPE TO ELBOtt C5.51 R100A870SB

    • TBX-35**

1 167000 TBX-2 2402 21 C-F.2 UT 1 . . . - C - 88 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE C5.51

( R100A86968

    • TBX-35**

167900 TBX 2-2402-22 C-F 2 W 1- - - . - C - 88 TDLR VEA!FICATION BOUNDARY.

PIPE TO ELDOW C5.51 R100A86fiSB i I

    • TBX 35**

I I

160000 TBX-2-2402-23 C-F.2 W 1- - - - . C - 82 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE C5.51 R100A864SB

    • TBX-35**

168100 TBI-2-2402-24 C-F.2 UT I- . - . . C - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW C5.51 R100A864SB

    • TBX-35**

128200 TBK 2-2402-25 C-F-2 W 1- . . . - C . 82 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE C5.51 R100A864SB

    • TEX-35**

s

O 1-

. DATES 08/11/99 MitBI WrEROY I.INE SREAR 12 TIT 1 PAGE: 28 l twSERVICE IM PECTIDs: PLAw j CIASS 2 $CHED/COMPL COMPCambrTS INSPECTICal INTERVAL, P1All STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASMB l PERIOD PERIOD PERIOD l SEC. 21 l ---- --- --- ---.-- ----------- l StNetARY ERAMIMkTION AREA CA19Y alDE j.-...-0UTAGE-.-- ..l INSTRUCTI0erS NUISER IDWrIIFICATION ITBI NO METH l1 2 3 1 2 1 2 l ** CALIBRATION 91M E**

I FREDWATEF 6-FW-1-090-1303-2 160300 TSE 2-2402-26 C-F.2 (TT 1- - - - - C - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE C5.51 R100A864SS

    • TBE 35**

1 l

i i

L

re

  • l

' SUPPLEMENTARY CONTAINMENT SPRAY AND RESIDUAL HEAT REMOVAL PIPING WELDS The containment spray (CT) system piping on the discharge side of the four CT pumps contains 80 welds (15-25 each loop) that are 10-inch NPS Schedule 40 with a wall thickness of 0.365 inch. Furthermore, the residual heat removal (R11R) system piping on the discharge side ofIliR pumps I and 2 contains a total of 166 welds on 8-inch and 10-inch NPS Schedule 40 piping with wall thicknesses of 0.322 inch and 0.365 inch, respectively.

Resulting from SSER 26, the augmented inservice inspection shall include a volumetric examination (i.e., ultrasonic examination) on 7.5 percent of the aforementioned welds. These examinations shall be distributed such that each weld or portion thereofis examined once during each 10-year interval.

Examination procedures and personnel shall be in accordance with the rules of ASME Section XI. 1 No special reports are required for this activity. Records of the examinations shall be maintained with the applicable work control document.

Results of these examinations shall be evaluated against the acceptance criteria provided in ASME Section XI, IWC-3000.

Summary Discussion

a. Goveming Document - SSER 26
b. Exam items and Boundaries - 7.5 percent of the welds discussed above,
c. NDE Method and Schedule - Ultrasonic examination once per 10-year interval. The specific schedule by refueling outage is attached..
d. Acceptance Criteria - ASME Section XI, IWC 3000.
e. Special Reports - None l

O l

(1)

0
  1. . DATE: 08/11/99 RSSIDUAL NEAT RBIOVAL/C00rfA!ISWIrf SPRAY 1Rf!T 1 PAGE: 1 INSERVICE INSPSC"f10N PLAN CLASS 2 SCSEED/COMPL CONPOISBNTS q INSPECTION flFTEkVAL, P1AN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l ggC. II l +---- ----- - - --. -+ **. .... -. l {

1 SUIStARY EIANIMATION AREA CATQT NDE l .....OUTAOE. -..*-

l INSTRUCTIONS IR2BER IDBrt!PICATION '!TBt NO METH j 1 2 3 1 2 1 2 ] **CALIBRAT!all 31DCK**

RESIDUAL MEAT R300 VAL 10-RH-1 025-6015-2 195300 TEX 2 2520-13 C-F-1 Iff 1- - - - C . - NA TEE TO PIPE C5.11 R62F 70988

    • TBX-10**

195250 TBX-2-2520 13L C-F-1 UT 1 . . - C * . NA 14IIG. SEAN (2.5T ADJ NELD 13) C5.12 R63F 70983

    • TBI-10**

183300 TBI 2-2520-14 C-F-1 UT 1 . . - C - - NA PIPE TO VALVE C5.11 R62F 70983

    • TBK 10**

195350 TnX 2-2520-14L C-F+1 Iff 1- - - - C - . NA IORG. SEAN (2.57 ADJ. NELD 14) C5.12 R62F 7098B

    • TBX-10**

RESIDUAL HEAT RENOVAL 0-RN-1-020-601R-2 i

105700 TBX 2-2520-10 C F-1 UT 1- - - -

  • C - NA l

PIPE TO ElaON C5.11 l R62F 70958

    • TBX-7** 1 105000 TBX-2-2520-19 C-F-1 Iff 1- - - - - C - NA j ELBON TO PIPE C5.11 i R62F 19988 I

.. Tag.?ae 190050 TBK-2 2520 10L CF1 UT 1- - - - - C - NA PREVIOUSLY DENOTED AS LONG. SEAN (2.5T ADJ. NELD 10) C5.12 TBX 2-2520 69L DURING PSI.

R62F 70983 i

l s **TBX-7**

e *

  1. . ~ IATE: 08/11/99 RESIDUAL HEAT REMCVAL/CONTAINNEFT SPRAY (BtIT 1 PAGE: 3 INSERVICE INSPECTION PIAN CLASS 2 SCHED/COMPL COMPOWENTS INSPECTIOef IsrTERVAL_ PLAN STATUS _PRESERVICE YhAR l FIRST SECOND THIRD l ASNE l PERIOD PERIOD PERIOD l SEC. XI l ........... ........... ........... l StBBeARY EXANIMATION AREA CATGY NDE l ....-0UTAOE......l INSTRUCTIONS NUNDER IDENTIFICATION ITWI 100 ME11t l1 2 3 1 2 1 2 l H CALIBRATION BIDCK**

RESIDtAL HEAT REMOVAL 8-RH-1-020-601R-2 190900 TBK 2-2520 19L C.F-1 UT 1 - . . . C . NA PREVIOUSLY DENOTED AS

.1DNG. SEAM (2.57 ADJ. WELD 19) C5.12 TBI-2-2520-70L DURING PSI.

RG2F 78958 ,

    • TBX.7**

RESIDUAL MEAT RENOVAL 8-RH 1-064-601R-2 196400 TBI 2-2521-49 C F.1 ITT 1 . . . . C . NA FLANGE TO ELBON C5.11 R51 78188

    • TBX.7**

T6500 TBX 2 2521-51 C.F.1 UT 1- - . . . C - NA I PIPE TO ELBON C5.11 R51 78188

    • TBX.7'*

i 196700 TBX-2 2521-52 C-F-1 UT 1- . . . . C . NA ELBON TO PIPE C5.11 '

R51 781SB

    • TBZ-7**

197200 TBX-2-2521-57 C-F.1 ITT 1- . . . . C . NA TIPE TO NOZZLE C5.11 RS2 778SB

    • TBI-7+*

198450 TBI-2-2521-51L C-F.1 UT 1 . - . . C . NA PREVIOUSLY DENOTED A8 IDNG. SEAN (2.57 ADJ. WELD $1) C5.12 TBK-2 2521*69L DURING PSI.

R$1 78188

    • TBX.7**

198500 TBI-2-2521-52L C-F.1 ITT 1 . . . . C . NA PREVIOUSLY DENOTED AS IDNG. SEAM (2.57 ADJ. NELD $2) C5.12 TBX.2-2521-70L DURING PSI.

/ R51 781SB

  • *TBX- 7" l

l

?* -

  1. , DATE: 08/11/99 RESIDtAL NEAT R200 VAL /CoprTAIMMEBff SPRAY UNIT 1 PAGE: 3 INSERVICE INSPEC"T1006 PLAN CLASS 2 SCHED/COMPL COMPONEgrTS INSPECT 100f IlrTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l ........... ........... ........... J 5UtsfARY BEAMINATIOIf AREA CA1UY NDE l.. **.OUTA0E-.-**. l INSTRUCT 10bf8 NtBGER IDENTIFICATICII ITEM NO METH l1 2 3 1 2 1 2 l ** CAL 3 BRAT 10N BIDCK**

1 RESIDUAL HEAT RBIOVAL 0 RH.1-064-601P-2 l 198600 TRX 2 2521 57L C-F*1 LTT 1 . . . - C . NA PREVIOUSLY DENOTED AS 1

l IDNO. SEAM (2.5T ALJ. NELD 57) C5.12 TBX-2-2521-71L DURING PSI. )

RS2 77888

    • TBX 7**

l RESIDUAL MEAT REMO NL 10-RH-1-056-601R 2 1

204100 TRX 2-2530-1 C-F.1 UT 1 . . . C . . NA l 1

TEC TO PIPE C5.11 R66 78988 i

..T.X.10..

  • 04150 TBX-2-2530 3L C-F.1 UT 1 . . . C . . NA 1D100. SEAM (2.5T An!. HELD 1) C5.12 R66 7095B
    • TBX.10**

204400 TBX 2 2530-4 C-F.1 ITT 1- . . . C . . NA PIPE TO trALVE C5.11 i

R66 707:38 1

    • TBX-10**

208050 TBX-2 2530 4L C-F-1 ITT 1 . . - C . . NA PREVIOUSLY DENOTED AS LONO. SEAM (2.5T An!. HELD 4) C5.12 TBX-2-2530-39L DURING PSI.

R66 7878B

    • TBX-10**

l l

l l

RESIDUE HEAT REMOVAL 10-RH 1-026-601R 2 2f'8300 TRX-2 2531 1 C.F.1 ITT 1 . . . C . - NA VALVE TO PIPE C5.11 l R66 799E9

    • TBX-10**

fa l

  1. ,- DATE: 08/11/99 RSSIDUAL NEAT REMOVAL /CONTAIl#WNT SPRAY UNIT 1 PAGE: 4 INSERVICE INSPECTION PLAN CIASS 2 SCHED/COMPL COMPONEbrTS

, INSPECTION INTERVAL, PIAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l.........-.--*...................l SUte44RY BEANINATION AREA CAMY NDE l...... OUTAGE---.. -l INSTRI,TTIONS NUMBER IDENTIFICATION ITEM NO NETH l1 2 3 1 2 1 2 l ** CALIBRATION BICCE**

RESIDUAL HEAT REMOVAL 10-RH-2-026-6019-2 208400 TBX.2 2531-2 C-F.1 (TT 1 . . . C - - NA PIPE TO TEE C5.11 R66 70988

    • TBX-10**

210200 TBX 2 2531-IL C r-1 (TT 1 . - - C . . NA PREVIOUSLY DEMOTED AS 14NG. SEAM (2.57 ADJ.NELD 1) C5.12 TRX-2 2531-20L DURING PSI. j R66 7ssSB

    • TBX 10**

i I

210250 TBX-2-2531-2L C-F-1 UT 1 . . - C .

  • NA PREVIOUSLY DENOTED AS LONG. SEAM (2.5T ADJ.NELD 2) C5.12 TBX-2-2531-20L DURING PSI.

A R66 78988 k~J **TBX.10**

l 1

RESIDUAL HEAT REMOVAL 0-RN-1-027-601R-2 j

213700 TEX-2-2532-34 C.F-1 ITT 1- . . - - C - NA PIPE TO ELBOW C5.11 R67 797SB

    • TBX 7**

213000 TBX-2 2532 35 C-F.1 ITT 1- . . . . C . NA ELBON TO PIPE C5,11 R67 797SB

  • ""BX - 7 *
  • 215050 TBI.2 2532 34L C-F.1 UT 1 . . - . C - NA PREVIOUSLY DENOTED AS 14NG. SEAM (2.57 ADJ. NELD 34) C5.12 TBX-2-2532-47L DURING PSI.

R67 78988

    • TBI.7**

215100 TBX-2-2532 35L C F.1 UT 1- - - . . C - NA PREVIOUSLY DENOTED AS 14NG. SEAM (2.57 ADJ NELD 35) C5.12 TBX.2-2532 4GL DURING PSI.

R67 797SB

\ **TBX-7**

[e

  • e DATES 08/11/99 RESIDUAL NEAT REMOVAL /CONTAISBGErf SPRAY C!IT 1 PAGE: 5 INSERVICE INSPECTION PIAN CLASS 2 SCHED/COMPL COMPONENTS INSPEC"f10N 18rTERVAL, PIAN STAWS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEc. II l ........... ........... ..-........ l StNetARY EXAMINATION AREA CATGY NDE l .....OUTA0E-....- l INSTRUCTIONS NUDGER IDEBrrIFICATICOI ITEN NO METH l1 2 3 1 2 1 2 l ** CALIBRATION BLOCK'*

)

COtrTAIIOGENT SPRAY 10-C*T-1 010-101P-2 223500 TBX.2 2530 3 C-F.1 ITT 1 . . C . . - NA ELBON TO PIPE C5.11 J R54 776SB

    • TBI-10** )

{

224000 TBX-2 2530 8 C.F.1 UT 1 . . C . . . NA PIPE TO ELBON C5.11 R54 7798B

    • TBX-10**

1 i

226500 TBX.2 2538-3L C.F.1 (TF 1 . . C . . . NA PREVIOUSLY DEMOTED AS IDNO. SEAM (2.5T ADJ. NELD 3) C5.12 TBX.2 2538 34L DURING PSI.

R54 77688 (A

s

..T ,X.10..

225750 TBX 2-2538 0L C.F.1 LTT 1 . . C . . . NA PREVIOUSLY DENOTED AS 1DNG. SEAM (2.57 ADJ. NELD 8) C5.12 TBX-2-2538 36L DURING PSI.

R54 77988

    • TBX-10**

CONTAINMDrf SPRAY 10-CT-1-009 3 01R-2 228800 TBX 2 2530A-7 C.F.1 ITF 1 . . C - . . NA ELBON TO PIPE C5.11 P54 77988

    • TBX.10**

228850 TBX.2 253AA-7L C.F-1 UT 1 . . C . - - NA 1DNG. SEAM (2.5T ADJ. NELD 7) C5.12 R$4 779S8

    • TBX-10**

CONTAINMDrT SPRAY 10-CT.1 011-301R-2 1300 TBX-2-2539 2 C.F-1 tTT 1 -

  • C . . . NA l ( ELBON TO PIPE C5.11 R51 776SB
    • TBX.10**

l

Ie -

  1. . DhTE: 08/11/99 RESIDUAL NEAT RS40 VAL /C0ertAIW9 Elf EPRAY int!T 1 PAGE: 6 INsRRVICE INsPEC"f!ON PLAN CLASS 2 SmED/COMPL CONPOftRirts i

INSPECTION IlrTERVAL, PLAN STATUS _PRESERVICE YEAR I r!Rsr ste0ND ru!RD l t

ASNE l PERIOD PERIOD PERIOD l l gEC. XI j .... ---... --......... .......--.. l st200ARY EXANIMATION AREA CA'MY NDE l ...--0UTAOE.-.**- l INSTRUCTIONS NUBSER IDRIrf!FICATION ITEN NO NrfH l1 2 3 1 2 1 2 l **CALIB!tATION B14CE**

l CWTAIIstElrr BPRAY 10-CT-1-011-301p-2 231600 TBX 2-2539-5 C-F 1 (TF 1 - - C . - - NA PIPE '!V ELBON C5.11 R51 77688

    • TBX-10**

234450 TBX-2 2539-5L C-F-1 LTT 1 . - C . . - NA PREVIOUSLY DEMOTED AS 1DNG. SEAM (2.57 Ah!. NELD 5) C5.12 TBX 2 2539 33L DURING PSI.

R51 7768B

    • TEX-10**

236250 TBK-2-2539-2L C-F-1 ITf 1- .

  • C - . . MA PREVIOUSLY DENOTED AS I4000. SEAN (2.57 ADJ. NELD 2) C5.12 TBX 2-2539 52L DURING PSI.

R51 776S8

    • TBX 10**

C0ert'AINMDrr SPRAY 10-CT-1-012-3019-2 236500 TBX-2-2539A-3 C-F-1 ITT 1- - - C - . - NA PIPE TO ELBON C5.11 R51 77988 e*TBX-10**

230250 TBX 2-2539A-3L C F-1 UT 1- -

  • C = - - NA PREVIOUSLY DENOTED AS 14NO. SEAM (2.57 ADJ. NELD 3) C5.12 TBX-2-2539A 20L DURING PSI.

R51 7078B t **TBX 10**

l r

I l

l l

l v

3 REACTOR VESSELllEAD AND INTERNALS LIFTING DEVICES q

(Vl ANSI N14.6-1978 provides detailed requirements for the design, fat,rication, testing, maintenance, and quality assurance of special lifting devices at nuclear power stations. To address the control of heavy loads and to ensure against and mitigate the consequences of postulated accidental load drops, the Nuclear Regulatory Commission (NRC) issued NUREG 0612.

Westinghouse Electric Corporation conducted an evaluation and documented the results under WCAP-10156, Rev. I to )

determine the acceptability of the reactor vessel head and internals lifting devices to meet the requirements of NUREG l 0612. As a result of this effort, recommendations were made to perform periodic non-destructive examinations on prescribed critical welds and'or pans once every ten years as part of an inservice inspection outage.

Therefore volumetric, surface and or visual examinations shall be performed as described in the attached pages at approximately 10-year intervals coinciding with Inservice inspection schedules as required by ASME Section XI. The acceptance criteria shall be in accordance with ASME Section XI, IWC-3000. Examinations shall be performed by l written procedures and by personnel qualified in accordance with the rules in ASME Section XI.

l No special reports are required for this activity. Records of the examinations shall be maintained with the applicable l work control document.

Summary Discussion

a. Governing Document - ANSI N14.6-1978. NUREG 0612, TXX-4226 and TXX-99172.
b. Exam items and Boundaries Reactor vessel head and internal lifting rigs' critical welds and/or pans as described in the attached pages.

A

c. NDE Method and Schedule -Volumetric, surface and or visual examinations at approximately 10-year intervals coinciding with Inservice Inspection schedules as required by ASME Section XI.
d. Acceptance Criteria - ASME Section XI,IWC-3000.
e. Special Reports - None l \

i.v)

(1) 1 1

"e ,

REACTOR VESSEL HEAD LIFT RIG, CRITICAL ITEMS LIST

/*N, V

Non-Destructive Item id Description Material Examination Method i Lifting Block ASTM A350 Visual GR, LF 2 Lug ASTM A516 Visual Grade 70 3,6 Clevis Pin ASTM A434 Volumetric AISI4340 Steel Class BD 4,10 Clevis ASTM A668 Visual Forging and Class L AISI4340 5,9 Lifting Leg ASTM A434 Visual Class BC AISI4340 11 Clevis Pin ASTM A564 Volumetric (load sensing) T3pe XM12 12 Side Plates ASTM 533 Visual Type B Class 1 13 Removable Pin ASTM A564 Volumetric Type 630 l RV ilead Lifting Lug SA 533 Gr B Visual Class 1 id See Page 4 l

l i

l (2) l

r, .

e, REACTOR VESSEL HEAD LIFT RIG, CRITICAL ITEMS LIST OF WELDS L

l. Non Destructive Examination item 88 Description Method 1,2 Lugs to Lifting Block Surface (Full Penetration) 7,8 Spreader Arm- Surface Lug to Spreader Arm (fillet) l RV Head Lifting Lug Surface

' (integral attachment area)

'" See Page 4 '

I

.. O I

l 1

l l

1 (3)

/

Fe l , .

l CLEVIS PIN l

(LOAD SENSING) @

) REMOVABLE PIN h h SIDE PLATE LIFTING BLOCK @

h LIFTING LEG

,L- @ ,  %,

l

" CLEVIS @

/*

, p/g ,

@ CLEVIS PIN 2

POSITION 3 , ___

~. -

f  !

ARM @ l I

@ LUG ,

\%

  • l O .

@ LIFTING LEG

~ - ,

TYPICAL CRDM s"

~ . - m U-h CLEVIS

& CLEvlsPgn ,

n x r 8

I i

  • o i o

o l  !

REACTOR *o oo VESSEL ***

HEAD 1 O a ct r v ' " ' '4<* a's l

t (4) l

e .

l*.

REACTOR VESSEL INTERNALS LIFT RIG CRITICAL ITEMS LIST O

Non-Destructive item **! Description Material Examination Method i I Lifting Block ASTM A350 Visual l- GR. LF 2 l

2 Lifting Block ASTM A516 Visual Lug Grade 70 3,7 Clevis Pin ASTM A564 Volumetric Grade 70 Precipitation liardening SST Age treated @

ll50* F / 411rs.

. Air cooled RC 28-31 4,6 Clevis ASTM A471 Visual Class 3 Steel Forging

( 5 Sling Rod ASTM A434 Class BC Visual AISI 4340 or (ASTM A588) 8,11 Spread Lug ASTM A516 Visual Leg Lug Gr. 70 STL Plate Normalized 13 Mounting Block - ASTM 350 LF1 Visual Forging Steel 12 Leg Channels ASTM A36 CS, }IR Visual Load Cell Pins Volumetric Lower internals Connecting Pins Volumetric

See Page 8 O  :

(5) i

r,7 i

REACTOR VESSEL INTERNALS LIFT RIG CRITICAL ITEMS LIST Non-Destructive ite m *8 8

Description Material Examination Method l

l 14,1$ Load Nuts ASTM A276 Visual l Rod Housing Type 304 SST, f

j Hot Rolled, Condition A

.16- Guide Sleeve ASTM A276 Visual Type 304 SST, llot Rolled, Annealed & Pickled, Condition A 17 Engaging Screw ASTM A564 Volumetric Type 630,17 4 pH Steel @ Il00*F for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

See Page 8 i

s (6)

REACTOR VESSEL INTERNALS LIFT RIG CRITICAL ITEMS LIST OF WEL.DS O i Non-Destructive Examination item i'8 Description Method 1,2 Lugs to Lifting Block Surface (Full Penetration) 8,9 Lug to Spreader Block Surface I l (Full Penetration) 11,12 Leg Lug to Channel Leg Surface (fillet) 12,13 Mounting Block to Surface Channel Leg (fillet)

See Page 8 O

I i

I i

O (7)

~

/ .

[

'd \, LIFTING BLOCK @

('s ,

LUG @

'v! @ CLEVIS PIN

@ CLEVIS

( ,

D _---

=

(h i -

&g ,  ! . m I

~

, , --SLING ROD @

h ARM / \

h 's.s , / ,

s

/

/mCLEVIS @

g BLOCK @ '

,, - LUG @

f,N' ~

'h I

g_ d ^j CLEVISPIN @

4,,

[ \ LEG LUG @

g CHANNEL @

. s L

<,;;\

1';'

('

J' j 7

,, f J! .! L

{

? (  !)]jI h LOAD NIJT p h MOUNTING BLOCK f f h ROD HOUSING h GUIDESLEEVE h ENGAGING SCREW Reactor Yessel Internals Lift Rf g x

%J (8) 1

Fa

  • e Appendix A

SUMMARY

OF REVISIONS Rev.No. Rev. Summarv 0 - Originalissue 1 -

Incorporation ofICR 1 to Rev. 0 (deletion of penetration seal section)

Incorporation ofICR 2 to Rev. 0 (added reference to TDLR verification boundary in Main Steam /Feedwater Section)

Added thermally stressed reactor coolant piping section Revised Main Steam /Feedwater and flux thimble tube tables to reflect RF01 exams 2 -

Deleted thermally stressed reactor coolant piping section Revised flux thimble tube tables to reflect RF02 exams Revised reporting requirements for flux thimble tube exams to reflect requirements of NRC Bulletin 88-09.

3 -

Added Supplementary Containment Spray and Residual 11 eat Removal Piping Welds Section Added Reactor Vessel IIcat and Internals Lifting Devices Section 4 - Incorporated ICR's IR3-1 thru 1R3 6, Revised Section 1, Reactor Coolant Pump Flywheels, per ITS 5.5.7.

Revised Sections 4 and 5 by updating piping examination tables Revised Section 6, Reactor Vessel llead and Internals Lifting Devices per TXX -

99172.

O (1)

rg ,

r o,

l Appeed3 ; L INDEX OF INTERIM CHANGE RL' QUEST (ICRs)

ICR No. AFFECTED PAGES CHANGE

- AISI lRO-01 Section 3 - Deleted Section 3 AISI-IR0-02 Section 5 Added summary #149800 and ref, to l TDLR boundary l

AISI lR3-01 Section 6 Schedule lifting rig exams at the Page1 10 year ISI outage AISI l R3-2 Section 3 Adopted wear method and acceptance criteria from WCAP 12866.

Documented wear found during 1RF04 AISI-IR3-3 Section 3 Changed wear values from RF01 and l

Page 4 RF02 to actual wear instead of projected wear AIS! lR3-4 Sect;on 4 Removed inaccessible exam items Page 4 from table O

AISI-I R3-5 Section 4 Pages 2 & 16 Section 5 Page i Removed inaccessible exam items from tables. Added i exam item l'- AISI-1 R3-6 Section 3 Documented wear data from IRF06 i

Pages 2,3,4,5 l

l l

(1) o