ML20136G436

From kanterella
Jump to navigation Jump to search
Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual
ML20136G436
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/13/1997
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20136G434 List:
References
PROC-970313, NUDOCS 9703180040
Download: ML20136G436 (6)


Text

.

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL INSTRUCTION SHEET (Page I of 1)

The following instructional information and checklist is being furnished to help insert Revision 23 into the Comanche Peak Steam Electric Station TRM.

Discard the old sheets and insert the new sheets, as listed below.

Remove Insert Section 1 1-2 1-2 List of Effective Paaes EPL-1 through EPL-4 EPL-1 thru EPL-4 NOTE: Please complete the entry for insertion of Revison 23 on the " Record of Changes" form located at the beginning of the TRM.

l i

9703180040 970313 PDR ADOCK 05000445 P

PDR

CPSES/TRM TECHNICAL REQUIREMENT 1.1 Table 1.1.1 REACTOR TRIP SYSTEM INSTRUMERTATION RESPONSE TIMES.

FUNCTIONAL UNIT RESPONSE TIME 1.

Manual Reactor Trip N.A.

2.

Power Range, Neutron Flux 5 0.5 second*

3.

Power Range. Neutron Flux High Positive Rate N.A.

4.

Not Used 19 5.

Intermediate Range, Neutron Flux N.A.

6.

Source Range Neutron Flux N.A.

21 7.

Overtemperature N-16 5 8 seconds *#

23 8.

Overpower N-16 5 7 seconds *#

9.

Pressurizer Pressure-Low s 2 seconds

10. Pressurizer Pressure-High 5 2 seconds
11. Pressurizer Water Level-High N.A.
  • Neutron / gamma detectors are exempt from response time testing. Response time of the neutron / gamma flux signal portion of the channel shall be measured from detector output or input of first electronic component in a channel.
  1. Response time includes the thermal well response time.

COMANCHE PEAK - UNITS 1 AND 2 1-2 Revision 23 March 13, 1997

. _.._.. _._...... _ _. _ __ _._,_._ _._ ~._ _._._. _.

i I

' COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL RE.0VIREMENT_S MANUAL (TRM)

~

EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

i 1

1 Original Submitted July 21, 1989 1

Revision 1 September 15, 1989

}

Revision 2 January 15, 1990 l-Revision 3 July 20,1990 i

Revision 4 April 24,1991 Revision 5 September 6, 1991 Revision 6 November 22. 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993

}

' Revision 11 February 3, 1993 i

4 Revision 12 July 15.1993 j

Revision 13 September 14, 1993 Revision 14 November 30. 1993

- Revision 15 April 15.1994 i

Revision 16 May 11. 1994 i

Revision 17 February 24, 1995 i

Revision 18 April 14,1995 i

Revision 19 May 15. 1995 Revision 20 June 30, 1995 j

- Revision 21 January 24, 1996 j

Revision 22 February 24, 1997 4

Revision 23 March 13. 1997 i

1 i

i i

5 f~

+

1 i'

EPL-1 March 13, 1997 4

)

l i

O

~

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2.

TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING TRM-Tab Original Record of Changes February 24, 1995 TRM-Title Page June 30, 1992 Table of Contents-Tab Original i

February 24, 1995 Administrative Controls-Tab Original Administrative Controls-Title Page June.30, 1995 0-1 Revision 20 0-2 Revision 20 0-3' Revision 20 0-4 Revision 20 Technical Requirements-Tab Original Section 1-Tab Original 1-1 Revision 20 1-2 Revision 23 1-3 Revision 21 1-4 Revision 20 1-5 June 30, 1995 1-6 Revision 21 1-7 February 24, 1997 1-8 Revision 21 1-9 Revision 21 1-10 June 30, 1995 1-11 Revision 21 1-12 June 30, 1995 1-13 June 30 1995 1-14 June 30. 1995 1-15 June 30, 1995 1-16 June 30, 1995 1-17 June 30, 1995 1-18 June 30, 1995 1-19 June 30, 1995 Sec. 2-Tab Original 2-1 Revision 20 i

2-2 June 30, 1995 2-3 Revision 21 4 June 30, 1995 2-5 June 30, 1995 2-6 June 30, 1995 2-7 Revision 21 2-8 June 30. 1995 2-9 Revision 21 EPL-2 March 13, 1997

e COMANCHE PEAK. STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 2-10 June 30, 1995 2-11 June 30, 1995 2-12 June 30, 1995 2-13 June 30, 1995 2-14 June 30, 1995 2-15 June 30, 1995 2-16 June 30, 1995 2-17 June 30, 1995 2-18 June 30, 1995 2-19 June 30, 1995 2-20 June 30, 1995 2-21 June 30, 1995 2-22 June 30, 1995 2-23 June 30, 1995 2-24 June 30. 1995 2-25 Revision 21 2-26 June 30, 1995 2-27 Revision 20 2-28 June 30, 1995 Sec. 3-Tab Original 3-1 Revision 20 3-2 June 30, 1995 3-3 June 30. 1995 3-4 June 30, 1995 3-5 June 30, 1995 3-6 June 30, 1995 3-7 June 30, 1995 3-8 June 30, 1995 3-9 June 30, 1995 3-10 June 30, 1995 Sec. 4-Tab Original 4-1 Revision 20 4-2 June 30, 1995 4-3 June 30, 1995 4-4 June 30, 1995 4-5 June 30, 1995 4-6 June 30, 1995 4-7 June 30, 1995 4-8 June 30 1995 4-9 June 30, 1995 l

4-10 June 30, 1995 l

4-11 June 30, 1995 l

EPL-3 March 13, 1997

=

COMANCHE PEAK STEAM ELECTRIC STATION I) NITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 4-12 June 30, 1995 4-13 June 30, 1995 4-14 June 30, 1995 4-15 June 30, 1995 4-16 June 30, 1995 4-17 June 30, 1995 4-18 June 30, 1995 4-19 June 30, 1995 4-20 June 30, 1995 4-21 June 30, 1995 4-22 June 30, 1995 4-2:.

June 30, 1995 4-24 June 30, 1995 4-25 June 30, 1995 4-26 June 30, 1995 4-27 June 30, 1995 4-28 June 30, 1995 4-29 June 30, 1995 EPL-Tab Original EPL-1 March 13, 1997 EPL-2 March 13, 1997 EPL-3 March 13, 1997 EPL-4 March 13, 1997

)

l EPL-4 March 13, 1997