ML20212E981

From kanterella
Jump to navigation Jump to search
Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval
ML20212E981
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/06/1997
From: Mays R, Reimer D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20212E977 List:
References
PROC-971006, NUDOCS 9711040129
Download: ML20212E981 (8)


Text

.. -.

COMAN(,HE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 IMS~.RVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL REVISION 11 Prepared By: 2,8 Nov3 dW Date: lo-4-T7 f

Engineer 16g F7ogram( S4ervisor a

Approved By. D ED N M N 4%

Date:b clo d l Manager, Technical Support

=-Approved By:

Date:lo E U PlantMahager

~

CDNOf PEAK STEM ELECTRIC Si'JIDE (MIT I & 2 INSERVIG vtVE TESTIE PUW TABLE 6 - DEMINEMLI2ED and PIKTGt 9AEtF WATER iWGE 10F 3 Test Paray* w s/ W J e Flow Valve /

Safety Fatl Positton Valve Diagree Actuator Cooe Cate-Func-Func.

Leak Exercise Safe Irecator

% ster (Coord.)

Troe Size Ons sctr_

tien P2s.

Int Test Igs1 In1 Ms itD-00f2 M2-0241 Ot/SA 3

3 C

A C

WA CV/0 WA WA man-Safety Makew Line RR V6 1 solation (C-2s ID 0006 M1-0241-1 (K/SA 3

3 C

A C

R/A CV/Q M/A R/A Non-Safety Makew 'aine i

RR V6 Isolation (C-6)

M2-0241 (C-2) 200-0008 M2-0241 CK/SA 2

3 C

A C

WA CV/Q WA WA sem-Safety Mate g Lire RR V6 1solattan (F-1) 2DD-0009 M2-0241 CK/SA 2

3 C

A C

WA CW/0 m/A N/A non-Safety Mateup Line RR V6 1 solation (D-1)

DD-0016 M1-0241-1 CK/SA 2

3 C

A 0

WA CV/Q N/A WA Pwo Miniflow Path 11 (D-3)

(1)

F2-0241 (T-5) 00-0018 M1-0241-1 CK/SA 3

3 C

A O

WA CV/0 R/A R/A Pwo Discharge Ficacath (E-2)

M2-0241 (F-4) 13)-0020 M1-0241-I DA/MA 3

3 8

A C

WA ET/0 WA WA Non-Safety Flowpath Isolatton (F-2)

XDD-0044 M1-0241-1 CK/SA 2

3 C

A O

WA CV/Q WA R/A Pwp Mmtf1> Path 11 (D-2)

XDD 0048 M1-0241-1 CKISA 3

3 C

A 0

WA CV/Q R/A M/A Pw n Discharge Flo wath (E-2)

Rev. 11 (ktater 10. 1997

,mi-w

.an-e

+

->A-w-

4 f

4b R

.g p

O B5

~

1:1 I

2 g&

-S Es k,ke, fa.I' e

I. E g

e "5

~

e-I Eh h !

I1 H

@T)5 H.

v, 9

gi W @p g il U

W' E t

% Wii 91 bW de wn

~

E x}t p*

s 31 ca 11 ss z%

=s hkk' s;

b

~

I

i

-COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 I

INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL f

EFFECTIVE PAGE LISTING PAGE 1 0F 5 j

BELOW IS A LEGEN0 FOR THE EFFECTIVE PAGE LISTING:

l Revision 0 Sutnitted July 1,1992 Revision 1 February 3.-1993

,r Revision 2 April 30,1993 Revision 3 h ember 19,1993 l

Revision 4 October 7, 1994 Revision 5:

Tebruary 14,1995-Revision 6 October 5, 1996 Revision 7 October 16, 1996 Revision 8-January 31, 1997 i

Revision 9-June 26, 1997

Revision 10-September 3, 1997

-i

. Revision 11 October 10, 1997<

page Bevision/Date Record of Changes October 7, 1994 Cover Sheet Revision 11 i

i (Table of Contents)

April 30, 1993 11-Revision 2

-12 Revision 3 i

1 3-Revision 2 l

1-4 April 30, 1993 1

2-1 Revision 0 22 Revision 0 23 Revisica 0 24 Revision 0 25 Revision 0 Table 0, Page 1 of 4 Revision 0

-Table 0, Page-2 of 4 Revision 0

. Table 0. Page 3'of 4 Revision 2 Table 0. Page 4 of 4 Revision 0

-Table 0, Notes, Page 1 Revision 2 j

31 Revision 0

- i j~

32 Revision 8 33 Revision 0 34-Revision 0 t

35 Revision 0 Valve b ble=Index Page 1 of 3 Revision 2 Valve-Table -Index, Page 2 of 3 April 30, 1993 Valve Tab!e Index, Page 3 of 3 April 30,:1993 l

- Table ID Pagelof-12 January 31 -1997 l

- Table 1,: Page 2~

-January 31,1997

~ Table 1. Page 3!

January 31; 1997 Tabla 1. Page 4 January 31, 1997 EPL-1 October 10, 1997'

.a:

C0HANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PLEPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 2 0F 5 Table 1. Page 5 January 31, 1997 Table 1, Page 6 January 31, 1997 Table 1 Page 7 January 31, 1997 Table 1, Page 8 January 31, 1997 Table 1, Page 9 January 31, 1997 Table 1. Page 10 January 31, 1997 Table 1, Page 11 Revision 8 Table 1. Page 12 Revision 8 Table 2. Page 1 of 13 January 31, 1997 Table 2. Page 2 January 31, 1997 Table 2. Page 3 January 31, 1997 Table 2. Page 4 January 31, 1997 Table 2. Page 5 January 31, 1997-Table 2 Page 6 January 31, 1997 Table 2, Page 7 January 31, 1997

. Table 2, Page 8 January 31, 1997 Table 2, Page 9 January 31, 1997 Table 2. Page 10 Revision 8 Table 2. Page 11 Revision 8 Table 2. Page 12 January 31, 199)

Table 2, Page 13 Revision 8 Table 3 Page 1 of 2 Revision 8 Table 3 Page 2 Revision 8 Table 4. Page 1 of 16 January 31, 1997 Table 4, Page 2 January 31, 1997 Table 4, Page 3 January 31, 1997 Table 4, Page 4 January 31, 1997 Table 4, Page 5 January 31, 1997 Table 4, Page 6 January 31, 1997 Table 4, Page 7 January 31, 1997 Table 4. Page 8 January 31, 1997 Table 4, Page 9 January 31, 1997 Table 4 Page 10 January 31, 1997 Table 4. Page 11 January 31, 1997 Table 4 Page 12 Revision 8 Table 4, Page 13 January 31, 1997 Table 4. Page 14 January 31, 1997 l

Table 4, Page 15 January 31, 1997 Table 4 Page 16 Revision 8 Table 5, Page 1 of 7 January 31, 1997 Table 5. Page 2 January 31, 1997 Table 5. Page 3 January 31, 1997 Table 5, Page 4 January 31, 1997 Table 5. Page 5 January 31, 1997 Table 5, Pag-; 6 Revision 8 Table 5. Page 7 Revision 8 EPL-2 October 10, 1997

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 3 0F 5 Table 6, Page 1 of 3 Revision 11 Table 6, Page 2 October 5, 1996 Table 6. Page 3 Revision 11 Table 7, Page 1 of 7 Septemoer 3, 1997 Table 7. Page 2 January 31, 1997 Table 7, Page 3 January 31, 1997 Table 7, Page 4 January 31, 1997 Table 7, Page 5 Revision 8 Table 7, Page 6 Revision 10 Table 7. Page 7 -

Revision 10 Table 8.-Page 1 of 6 Revision 0 r

Table 8. Page 2 of 6 Revision 0

-Table 8. Page 3 of 6 Revision 0 Table 8. Page 4 of 6 Revision 0 Table 8. Page 5 of 6 Revision 0 Table 8. Page 6 of 6 Revision 0 Table 8. Notes, Page 1 April 30,1993 Table 9. Page 1 of 12 Revision 2 Table 9, Page 2 of 12 Revision 2 Table 9, Page 3 of 12 Revision 9 Tuble 9, Page 4 of 12 Revision 2 Table 9. Page 5 of 12 April 30,1993 Table 9, Page 6 of 12 April 30, 1993 Table 9, Page 7 of 12 April 30, 1993 Table 9. Page 8 of 12 April 30,1993 Table 9. Page 9 of 12 April 30, 1993 Table 9. Page 10 of 12 April 30,1993 Table 9, Page 11 of 12 April 30,1993 Table 9. Page 12 of 12 April 30,1993 Table 9 Notes, Pagt 1 Revision 0 Table 10. Page 1 of 3 Revision 0 Table 10 Page 2 of 3 Revision 0 Table 10 Page 3 of 3 Revision 0 Table 10. Notes Page 1 Revision 0

,I Table 11. Page 1 of 5 January 31, 1997 Table ll, Page 2 January 31, 1997 Table 11. Page 3 January 31, 1997 Table 11. Page 4 Revision 3

-Table 11, Page 5 Revisicn 8 Table 12. Page 1 of 2 Revistor 0 Table 12. Page 2 of 2 Revision 0 Table 13. Page '- of 23 January 31, 1997

-Table 13. Page /

January 31, 1997 Table 13. Page 3 January 31, 1997 Table 13. Page 4 January 31, 1997 EDL 3 October 10, 1997

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 4 0F 5 Table 13. Page 5 January 31, 1997 Table 13, Page 6 January 31, 1997 Table 13, Page 7 January 31, 1997 Table 13, Page 8 January 31, 1997 Table 13, Page 9 January 31, 1997 Table 13, Page 10 January 31, 1997 Table 13, Page 11 January 31, 1997 Table 13, Page 12 January 31, 1997 Table 13, Page 13 January 31, 1997 Table 13, Page 14 January 31, 1997 Table 13, Page 15 Revision 9 l

Table 13, Page 16 Revision 9 Table 13, Page 17 January 31, 1997 Table 13, Page 18 Revision 8 Table 13 Page 19 Revision 8 Table 13. Page_20 January 31, 1997 Table 13. Page 21 January 31, 1997 Table 13 Page 22 Revision 9 Table 13 Page 23 Revision 8 Table 14, Page 1 of 5 January 31, 1997 Table 14 Page 2 January 31, 1997 Table 14, Page 3 January 31, 1997 Table 14, Page 4 Rivision 8 Table 14. Page 5 Rivision 8 Table 15, Page 1 of 1 Revision 0 Table 15, Notes, Page 1 Revision 0 Table 16. Page 1 of 2 Revision 0 Table 16, Page 2 of 2 Revision 0 Table 16,-Notes Page 1 Revision 0 Table 17. Page 1 of 12 Revision 2 Table 17, Page 2 of 12 Revision 2-Table 17 Page 3 of 12 Revision 0 Table 17, Page 4 of 12 Revision 0 Table 17, Page 5 of 12 Revision 0 Table 17, Page 6 of 12 Revision 0 Table 17, Page 7 of 12 Revision 0 Table 17. Page 8 of 12 Revision 2 Table 17. Page 9 of 12 Revision 2 Table 17 Page 10 of 12 Revision 2 Table 17. Page 11 of 12 Revision 2 Table 17 Page 12 of 12 Revision 0 Table 17, Notes, Page 1 April 30, 1993 Table 17, Notes, Page 2 Revision 2 A1 Revision 0 A2 April 30, 1993 A3 April 30, 1993 A4 Revision 2 A5 April 30, 1993 EPL-4

. October 10,199T

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 INSERV!CE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 5 0F 5 A6 April 30, 1993 A7 Revision 2 A8 April 30, 1993 A9 Revision 2 A 10 April 30. 1993 A 11 Revision 2 A 12 April 30, 1993-A 13 Revision 2 A 14 April 30, 1993 A 15 Revision 2 A 16 April 30, 1993 A-17 Revision 2 A-18 April 30, 1993 A-19 Revision 9 EPL. Page 1 of 5 October 10. 1997 EPL. Page 2 of 5 October 10. 1997 EPL Page 3 of 5 October 10. 1997 EPL, Page 4 of 5 October 10, 1997 EPL Page 5 of 5 October 10, 1997 5

EPL 5 October 10. 1997

.