Rev 28 to CPSES Technical Requirements Manual
ML20206Q031
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/16/1999
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20206Q027 List:
References
PROC-990416, NUDOCS 9905190045
Download: ML20206Q031 (5)


Text

'

.. CPSES/TRM TECHNICAL REOUIREMENT 4.1 (continued) i TABLE 4.1.lb (continued)

UNIT 2 8 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES

4. 480VAC From Panelboards (continued) 4.3 480 VAC From Plant Support Power Systems Panelboards 25 Both primary and backup breakers have identical trip settings, and 16 are located in the same panelboard. These breakers are Square D i type FH. KH and LH.

a) Panelboard 2B10-1-2 Device Location Breaker Tvoe System Powered Ckt 2 FH Containment Elevator CP2-MEELRB-01 Ckt 4 KH Containment Welding Receptacles Ckt 6 LH Containment Polar Crane CP2-MESCCP-01

    • Ckt 1 FH Containment Jib Crane 28 CP2-MEMECA-16 Disconnect Switches-CP2-ECDSNC-15&l6 b) Panelboard 2B10-1-1-1 16 Device location Breaker Tvoe System Powered
  • Ckt 4 FH Personnel Airlock Hydraulic 25 Units CP2-MEMEHU-01 and 02 Ckt 6 FH Fuel Transfer System Rx Side 16 i Cont. Pnl for TCX-FHSTTS-02 y i Ckt 10 FH Containment Lighting Xfmr CP2-ELTRNT-14 Eg Ckt 8 FH Manipulator Crane 1-01 Pa.

n TCX-FHSCMC-01 ,

  • Breakers become electrical penetration overcurrent protection devices only 25 f8 when transfer switch CP2-BSTSNB-01 is aligned to plant support power panel
    • 2B10-1-1-1/04/BKR-1 and 2. Transfer switch CP2-BSTSNB-01 is normally aligned to MCC 2EB1-2/12B/BKR-1 and 2.

[g ** This device is scheduled to be installed in the fourth refueling outage for Unit 2 and is effective following operations acceptance of design 27 l

a. a. modification 96-096.

COMANCHE PEAK UNITS 1 AND 2 4 25 Revision 28 April 16, 1999

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

Original Submitted July 21, 1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990 i Revision 3 July 20,1990 Revision 4 April 24, 1991 Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11 February 3, 1993 Revision 12 July 15,1993 Revision 13 September 14, 1993 Revision 14 November 30, 1993 Revision 15 April 15, 1994 Revision 16 May 11, 1994 Revision 17 February 24, 1995 Revision 18 April 14, 1995 Revision 19 May 15, 1995 Revision 20 June 30, 1995 Revision 21 January 24, 1996 Revision 22 February 24, 1997 Revision 23 March 13, 1997 Revision 24 June 26, 1997 Revision 25 July 31, 1997 Revision 26 February 24, 1998 Revision 27 April 14, 1999 Revision 28 April 16, 1999 l

l 1

EPL 1 April 16, 1999 i

r 1 l -

I l COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING TRM Tab Origirial Record of Changes February 24, 1995 TRM Title Page June 30, 1992 Table of Contents Tab Original i February 24, 1995 Administrative Controis Tab Original Administrative Controls-Title Page June 30, 1995 01 Revision 20 02 Revision 20 03 Revision 20 04 Revision 20 Technical Requirements Tab Original Section 1 Tab Original 11 Revision 20 12 Revision 26 I i

13 Revision 21 14 Revision 20 15 -

June 30, 1995 16 Revision 21 1-7 February 24, 1997  ;

18 Revision 21 19 Revision 21 1 10 June 30, 1995 1 11 Revision 21 ,

1-12 June 30, 1995  !

1 13 June 30, 1995 1 14 June 30, 1995 1-15 June 30, 1995 1-16 June 30, 1995 1-17 June 30, 1995 ,

1 18 June 30, 1995 1 19 June 30, 1995 Sec. 2-Tab Original 21 Revision 20 22 June 30, 1995 2-3 Revision 21 24 June 30, 1995 25 June 30, 1995 2-6 June 30, 1995 27 Revision 21 28 June 30, 1995 EPL 2 April 16, 1999

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 2-9 Revision 24 2 10 June 30, 1995 2 11 June 30, 1995 2 12 Revision 26 2 13 June 30, 1995 2 14 June 30, 1995 2 15 June 30, 1995 2-16 June 30, 1995 2 17 June 30, 1995 2 18 June 30, 1995 2 19 June 30, 1995 2 20 June 30, 1995 2 21 June 30, 1995 2 22 June 30, 1995 2 23 ,

June 30, 1995 2 24 June 30, 1995 2 25 Revision 26 2 26 Revision 26 2-27 February 24, 1998 2 28 February 24, 1998 2 29 February 24, 1998 Sec. 3 Tab Original 31 Revision 20 32 June 30, 1995 33 June 30, 1995 3-4 June 30, 1995 35 June 30, 1995 36 June 30, 1995 37 June 30, 1995 38 June 30, 1995 39 June 30, 1995 3-10 June 30, 1995 Sec. 4 Tab Original 41 Revision 20 42 June 30, 1995 43 June 30, 1995 44 June 30, 1995 45 June 30, 1995 46 Revision 26 4-7 June 30, 1995 48 June 30, 1995 EPL 3 April 16, 1999 l

l J

1

.. \

+

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM) i EFFECTIVE PAGE LISTING <

l 49 June 30, 1995  !

4 10 June 30, 1995 I 4 11 June 30, 1995 l 4-12 June 30, 1995 4 13 June 30, 1995 l 4 14 June 30, 1995 l 4 15 June 30, 1995 4 16 June 30, 1995 i

l 4-17 June 30, 1995 4 18 Revision'25 4 19 Revision 25 4 20 Revision 25 4 21 Revision 25  !

4 22 June 30, 1995 4 23 June 30, 1995 4 24 June 30, 1995 4-25 Revision 28 4 26 April 14, 1999 4 27 June 30, 1995 4 28 June 30, 1995 4 29 June 30, 1995 l

EPL Tab Original  ;

EPL 1 April 16, 1999 EPL-2 April 16, 1999 )

EPL 3 April 16, 1999 l EPL 4 April 16, 1999 i

s l

l EPL 4 April 16, 1999 l i