Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, RT Sys Instrumentation & TS Table B 3.3.1-1, RT Sys Setpoints ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints ML20141G1941997-05-16016 May 1997 Proposed Tech Specs,Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20134B9801996-09-19019 September 1996 Proposed Tech Specs Re Inverter/Battery Charger Mod ML20116F0471996-08-0202 August 1996 Proposed Tech Specs Re Increase in Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8651996-07-31031 July 1996 Proposed Tech Specs Modifying Inverter/Battery Chargers by Incorporating Listed Changes Into CPSES Units 1 & 2 TSs ML20116F3711996-07-31031 July 1996 Proposed Tech Specs 6.9.1.6b Including TR, SBLOCA Analysis Methodology, in List of NRC-approved Methodologies & Rev of Unit 1 Rx Trip Setpoints ML20115E8041996-07-10010 July 1996 Proposed TS 3/4.7.11,revising Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9461996-07-0909 July 1996 Proposed Tech Specs Re Steam Line pressure-low Allowable Value ML20113B5891996-06-21021 June 1996 Proposed Tech Specs,Removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Info to Clarify Expanded Bases Specific to CPSES ML20106G8231996-03-13013 March 1996 Proposed Tech Specs,Supplementing LAR-95-007,revising TS LCO 3.9.4 to Allow Both Doors of Personnel Airlock to Remain Open as Long as One Pal Door Capable of Being Closed ML20101C5681996-03-12012 March 1996 Proposed Tech Specs 3/4.6.1 & 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J,Option B ML20100J0791996-02-22022 February 1996 Proposed Tech Specs 3/4.9.4,revising Units 1 & 2 TS Bases Allowing Both Doors of Pal to Remain Open as Long One Pal Door Is Capable of Closing ML20096B3281996-01-0505 January 1996 Proposed TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication ML20095E8311995-12-15015 December 1995 Proposed TS Bases 2.2.1,deleting Unnecessary Details Re Time Delay Requirements for Undervoltage & Underfrequency RCP Trip Setpoints ML20094N6201995-11-21021 November 1995 Proposed Tech Specs,Allowing Containment Pal Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant ML20094N9011995-11-21021 November 1995 Proposed Tech Specs,Incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints, Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087K1751995-08-15015 August 1995 Proposed Tech Specs,Moving Shutdown Margin Limits from TS & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS 1999-09-10
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, RT Sys Instrumentation & TS Table B 3.3.1-1, RT Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] |
Text
--_
ATTACHMENT 2 TO TXX-99205 Revised Technical Specification Pages 9908310224 990826 PDR ADOCK 05000445 P
PDR
Programs and Mariuals 5.5
- 5.5 Programs and Manuals i
5.5.9 Steam Generator (SG) Tube Surveillance Procram (continued) c)
A tube inspection (pursuant to Specification 5.5.9.4a.8 shall be performed on each selected tube. If any selected tube does not j
permit the passage of the eddy current probe for a tube inspection, this shall be recorded and an adjacent tube shall be selected and subjected to a tube inspection.
t 3.
The tubes selected as the second and third samples (if required by Table 5.5.9-2 during each inservice inspection may be subjected to a partial tube inspection provided:
a)
The tubes selected for these samples include the tubes from those areas of the tube sheet array whe c tubes with imperfections were previously found, and i
b)
The inspections include those portions of the tubes where imperfections were previously found.
1 The results of each sample inspection shall be classified into one of the following i
three categories:
1 Cateuorv Insnection Results C-1 Less than 5% of the total tubes inspected are degraded tubes and none of the inspected tubes are defective.
C-2 One or more tubes, but not more than 1% of the total tubes inspected are defective, or between 5% and 10% of the total tubes inspected are degraded tubes.
C-3 More than 10% of the total tubes inspected are degraded tubes or more than 1% of the inspected tubes are defective.
Note: In all inspections, previously degraded tubes must exhibit significant (greater than 10%) further wall penetrations to be included in the above percentage calculations.
c.
Steam Generator F* Tube insoection (Unit 1 oniv)-In addition to the minimum sample size as determined by Specification 5.5.9.b., all F* tubes will be inspected within the tubesheet region. The results of the inspections of l
F* tubes identified in previous inspections will not be a cause for additional l
inspections per Tables 5.5-1 and 5.5-2.
r Programs and Manuals
-l 5.5 l
1 l
' 5.5 Programs and Manuals (continued) l 1
i COMANCHE PEAK - UNITS 1 AND 2 5.0-14
)
4 i
l t
i I
l Programs and Manuals 5.5 i
- 5.5 Procyams and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Procram (continued)_
d.
Insoection Frecuencies - The above required inservice inspections of steam generator tubes shall be performed at the following frequencies:
i 1.
The first inservice inspection shall be performed after 6 Effective Full Power Months (EFPM) and before 12 EFPM and shall include a special inspection of all expanded tubes in all steam generators.
Subsequent inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection. If two consecutive inspections, not including the preservice inspection, result in all inspection results falling into the C-1 category or if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum ofonce per 40 months; 2.
If the results of the inservice inspection of a steam generator conducted in accordance with Table 5.5-2 at 40-month intervals fall in Category C-3, the inspection frequency shall be increased to at least once per 20 months. The increase in inspection frequency shall apply until the subsequent inspections satisfy the criteria of Specification 5.5.9.3a.;
the interval may then be extended to a maximum of once per 40 months; and 3.
Additional, unscheduled inservice inspections shall be performed on each steam generator in accordance with the first sample inspection specified in Table 5.5-2 during the shutdown subsequent to any of the following conditions:
a)
Primary-to secondary tube leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3.4.5.2, or b)
A seismic occurrence greater than the Operating Basis Earthquake, or c)
A loss-of-coolant accident requiring actuation of the Engineered Safety Features, or d)
A main steam line or feedwater line break.
(continued)
Programs and Manuals 5.5
' 5.5 Programs and Manuals COMANCHE PEAK-UNITS 1 AND 2 5.0-15 l
1
Programs and Manuals 5.5
- 5.5 Programs and Manuals t
- 5. 5.9 Steam Generator (SG) Tube Surveillance Proeram (continued)'
d.
Acceotance Criteria 1.
As used in this specification:
a)
Imocrfection means an exception to the dimensions, finish, or contour of a tube from that required by fabrication drawings or
{
specifications. Eddy-current testing indications below 20% of j
the nominal tube wall thickness, if detectable, may be
{
considered as imperfections; b)
Deeradation means a service-induced cracking, wastage, wear, f
or general corrosion occurring on either inside or outside of a tube; c)
Degraded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness caused by degradation; d)
% Degradation means the percentage of the tube wall thickness affected or removed by degradation; e)
Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective; f)
Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from service and is equal to 40% of the nominal tube wall thickness. This definition does not apply to that portion of the Unit 1 tubing that meets the l
definition of an F* tube; (continued)
r Programs and Manuals S.S l
l l
' 5.5 Programs and Manuals l
l COMANCHE PEAK-UNITS 1 AND 2 5.0-16 i
I l
I
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Procram (continued) l g)
Unserviceable describes the condition of a tube ifit leaks or l
contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of coolant accident, or a steam line or feedwater line break as specified in Specification 5.5.9.3c, above; h)
Tube Inspection means an inspection of the steam generator tube from the tube end (hot leg side) completely around the U-bend to the top support of the cold leg; and i)
Preservice Insocction means an inspection of the full length of each tube in each steam generator performed by eddy current techniques prior to service to establish a baseline condition of the tubing. This inspection shall be performed prior to initial POWER OPERATION using the equipment and techniques expected to be used during subsequent inservice inspections; j)
F* Distance (Unit I onlv) is the distance of the hardroll l
expanded portion of a tube which provides a sufficient length l
of non-degraded tube expansion to resist pullout of the tube from the tubesheet. The F* distance is equal to 1.13 inches, plus an allowance for eddy current measurement uncertainty, and is measured down from the top of the tubesheet, or the bottom of the roll transition, whichever is lower in elevation; k)
F* Tube (Unit 1 oniv) is that portion of the tubing in the area of i the tubesheet region below the F* distance with a) degradation below the F* distance equal to or greater than 40%, b) which has no indication of degradation within the F* distance, and c) that remains inservice; and 1)
Hard Roll Exoansion (Unit 1 ontv) is that portion of a tube l
which has been increased in diameter by a rolling process such that no crevice exists between the outside diameter of the tube and the hole in the tubesheet.
j i
2.
The steam generator shall be determined OPERABLE after completing l
the corresponding actions (plug all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 5.5-2.
)
I
I Programs and Manuals 5.5
' 5.5 rograms and Manuals (continued) l 1
COMANCHE PEAK - UNITS 1 AND 2 5.0-17 l
i
{
l l
l