ML20202J356
| ML20202J356 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/11/1986 |
| From: | Dougherty F TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20202J051 | List:
|
| References | |
| DAP-19-ADD-01, DAP-19-ADD-1, NUDOCS 8607170065 | |
| Download: ML20202J356 (2) | |
Text
.
e COMANCFE PEAK RESPONSE TEAM DESIGN ADEQUACY PROCEDURE ADDENDUM Procedure:
DAP 19 Revision:
2 Addendum:
1
Title:
PROCESSING AND REVIEW OF INFORMATION BETWEEN OUALITY OF CONSTRUCTION, OA/QC ADEQUACY PROGRAM AND THE DESIGN ADEQUACY PURPOSE This addendum substitutes a revised Attochment C Contact Log Sheet for that contained in Revision 2 of the procedure.
SCOPE Delete Attochment C, DAP 19, Rev. 2, and replace with attached Attochment C, DAP 19, Rev. 2, Addendum 1.
INSTRUCTION This addendum is effective upon opproval and shall remain in effect until opproval of the next revision of DAP 19. This oddendum shall be securely attoched to each controlled copy of DAP 19.
Prepored By:
L Date:
- /TI, Reviewed By: Nbd Date: katM Approved By: MO_)
Date:
4//,I6
' I JO 1 <
$$$71gg 5
A CONTROLLED COPY O
TN-85-6262/19 fiO.
M
ATTACHMENT C Ob FILE NO.
COMANCHE PEAK RESPONSE TEAM A
DAP/ OOC CONTACT LOG SHEET LG
SUMMARY
OF TELECON OR MEETING DATE (of contact) ld
SUBJECT:
ORGANIZATION (S):
PARTICIPANTS: DAP:
GOC:
A OTHERS:
SUMMARY
O l
i ACTION:
b
(
DISTRIBUTION:
t O
TN-85-6262/19 C-1 DAP-19, Re. 2, Addendum I l
_ _ _ _ _ _, _, - _