ML20203A221

From kanterella
Jump to navigation Jump to search
Change Notice 001 to Rev 1 to Quality Instruction QI-012, Reinsp of Instrumentation Equipment/I-E-ININ
ML20203A221
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/25/1986
From: Bajada E, Merhan R, Patterson A
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
QI-012, QI-12, NUDOCS 8607170196
Download: ML20203A221 (2)


Text

r-i Pag 2 1 of 2 f- .

EVALUATION RESEARCH CORPORATION C0)Tm _ED C0?Y CONTRut no Y ~ N COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN ISAP-VII.c CHANGE NOTICE 001 INSTRUCTION NO.: QI-012 REVISION: 1 ISSUE DATE: 02/25/86 REINSPECTION OF INSTRUMENTATION EQUIPMENT /I-E-ININ The QI identified above is hereby changed as shown on the attached page of this notice.

Prepared by: h. Date: f- /f- 80 Approved by: M/d d M-[< M - Date: 2 ~/f T I Issue Coordinator l

Approved by: . C /% r,'s dry Date: d!) d /*

On-Site QA Representa ive Approved by:

Review Team Leader Date: 22Y/ d I I i QA 8607170196 860711 5 PDH ADOCK 0000 l

I 4

ChInga Notice 001 QI-012 g Rsv. I Section 5 Installation (N Para. 2.3 Add the following paragraph after the first paragraph.

b For instruments with flanged connection, verify that the studs and nuts are finger tight. Also, verify that all studs are the same length and that at least one thread protrudes beyond the face of the nut.

l

+

l l

O 2

_ _ _ _ _ _ . _