Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
r .
e
'? = 4, lf m
Pags 1 of 6
. -~
V; s '
~
-EVALUATION RESEARCH CORPORATION c '?' COD 0'__D COPY COMANCHE PEAK RESPONSE TEAM comm no ordt 2-s QUALITY' INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c 3
?
? .s
. 7 INSTRUCTION NO.: QI-056 REVISION:'1
, ISSUE DATE: 02/27/86 i
F-"
A i V'
! DOCUMENTATION REVIEW OF INSTRUMENT PIPE / TUBE SUPPORTS /R-S-INSP t
~
I N e, N
, e .
l + ,
Prepared by: d3#tle A7eW D 2-/2- 8/a
[
- Approved by: ///W' M . a #e/.5 - - Date: 'L-16~ff l* losue Coordinator Appro d by: .[. t6tLt/Ss Date: 2 A b /f4, Q' On-SiteQARepresenftivet n v
-i Approved by:
2- [
~
Date: ,1/4/8(,
V QA/#C Refiew Team Leader
/ /
A 4 -
-- - ---,_-y,, - _ _ . _ _ , , _ , , , _ , , _ _ , , , , , , _ , , , , , _ , _ _ _ _ _ _ _ _ _ _ , .
f e
QI-056
, Rsv. 1 O 1.0 PURPOSE V
This instruction describe's the methods and accept / reject criteria' for documentation review of1 Instrument Pipe / Tube Supports to be-used by QA/QC Reinspection Personnel.
2.0 APPLICABILITY ,
, This instruction applies to safety significant attributes which could not be verified by visual reinspection within the Instrument Pipe / Tube supports population.
3.0 REFERENCES
1.1 Memo QA/QC-RT-821, " Description Memorandum for Documentation Review of Instrument Pipe / Tube Supporcs."
3.2 CPP-009, " Performance of Reinspection and Documentation Reviews."
4.0 GENERAL 4.1 Responsibilities 4.1.1 QA/QC Discipline Engineers The QA/QC Discipline Engineers prepare the documentation review instruction delineating review requirements and attributes.
4.1.2 QA/QC Inspectors QA/QC Inspectors perform documentation review / verification in accordance with this instruction and reference 3.2 and record results and deviations.
4.2 Policy Activities performed'under this instruction shall conform to the policies contained in the latest Comanche Peak Response Team Program Plan and Issue-Specific Action Plan VII.c.
5.0 INSTRUCTION Using the information in Reference 3.2 and below, perform the documentation review on the items in this population and record the results on the checklist, Attacbment 6.1. Should additional space be required for remarks on the checklist, use Attachment 6.3.
o 2
F e
QI-056
+ Rev. I
'(m) s_s >$
5.0 INSTRUCTION (Cont'd)
Where an instrument / tube support is attached to any other seismic support documentation review will be done by way of a supplemental instruction.
> The inspector shall review the support drawing (s) and instrument package to determine which attributes are applicable. Where no inspection verification exists for applicable attributes, DR's will be initiated.
- 1. Inspector Certification Verify that each inspector who signed any item on an Inspection Report or Construction Traveler was certified (Level I or above) as follows:
- a. The certification was valid at the time of inspection, i.e. the date that the inspector initialed / signed must be on or after his certification date and prior to his certification expiration date.
- b. The inspector was certified to the applicable l procedure. The applicable procedure is shown on the IR.
If this attribute is rejected determine if the person that signed as QC inspector was evet certified to the procedure used. If the inspector was ever certified to the procedure record the time period of certification, otherwise state in the renarks column that the person was never certified.
NOTES: If both a. and b. are rejected they may both be treated
, on one DR.
l Inspector's name shall be recorded on the checklist when a deviation occurs.
If any initials and/or signatures are illegible, an attempt shall be made to determine the inspector's name by checking the signature cards located in the
, Permanent Plant Records Vault. If identification s cannot be made the inspector shall reject this attribute.
- 2. Material Traceability For field fabricated, non-catalogue material obtain the heat number or unique ID number from the reinspection verification
[) package. This will be included in the documentation review
\- - package, if available.
3
\
QI-056 R:v. 1
(~'h 5.0 INSTRUCTION (Cont'd)
V
- 2. Material Traceability (Cont'd)
For heat numbers:
Documentation for specific heat numbers are contained in the Receiving Inspection Report (RIR). The RIR can be found in the Permanent Plant Records Vault (PPRV) for Unit 1 or the Interim Records Vault (IRV) for Unit 2 Instrument Pipe / Tube Supports. ,
NOTE: Where copies of the RIR are not available in the vault, a check of the card file in the receiving warehouse, or l other suitable sources, will be necessary to obtain the i RIR and the heat numbers.
- a. Verify that the material utilized for the support matches the drawing requirements.
- b. Verify that the heat number from the Material Identification sheet matches the heat number from the instrument package, if available.
For unique ID numbers:
Check the Miscellaneous Structural Steel Log in the vault and obtain the corresponding heat number and thence, the RIR number from vault resources. Proceed as above. In item b replace ' heat number' with 'ID number' When no heat number or unique ID number is indicated on the visual checklist proceed as follows:
From the instrument package in the PPRV obtain the Material Requisition (MR) number. Using this number and the MR Log in the Miscellaneous Iron and Steel Fabrication Shoo to obtain the heat number the RIR number and proceed as before.
NOTE: If no MR number is listed obtain the inspection or installation date. Proceed to the FDL Log as above and obtain the heat number and the RIR number.
The inspector shall record the source document for the heat number in the remarks column of the checklist.
- 3. Concrete Expansion Anchors (HILTI)
From the vault review the following attributes.
3.1 Torque Verify that:
4 1
QI-056 Rzv. 1
(~ 5.0 INSTRUCTION (Cont'd)
- 3. Concrete Expansion Anchors (HILTI) (Cont'd)
- a. The calibration due date of the torque wrench is subsequent to the date the installation is being performed.
- b. The recorded torque setting value meets the minimum torque requirements of Attachment
-6.2.
I Note: If the number of correctly installed Hilti bolts indicated on IR's in the vault package equals the actual number of bolts installed on the supports for that package then any subgroup of these bolts can be considered verified for the above attributes.
3.2 Bolt Spacing Verify, by review, that if witnessed and if abandoned holes were drilled and subsequently covered by a baseplate, the inspector noted that the appropriate spacing was maintained between the installed HILTI and f-- the abandoned holes, and that if located at a distance
( )g of four bolt diameters and closer, holes were filled and patched according to Procedures 35-1195-CCP-12 (grouted).
3.3 Rework
Verify, by review, if rework of bolts occurred, that the inspector noted:
Correctness of thread fit requirements.
- Restamping of bolt to new length designation was observed. -
- 4. Stud Welding
- a. Verify that an inspection report for daily qualification has been filed, signed and dated.
- b. Verify that torqueing of threaded production studs was done. This is documented by a properly signed and dated entry on the IR.
- c. Verify final visual inspection of stud welds with a signed and dated Nelson stud size and type on the IR.
s-s I 1
5 l l
QI-056 Rsv. 1 5.0 INSTRUCTION (Cont'd)
- 5. Drawing Revision Verify, by review, that the latest revision of the
' generic / design drawing used for the reinspection program (QI-055 Rev. 0) is the sate used in the lattst Brown & Root or TUGC0 inspection. (A copy of the drawing (s) ' rom reinspection is included in the documentation review package).
6.0 ATTACHMENTS 6.1 Documentation Review Checklist 6.2 Hilti Bolt Torque Requirements 6.3 Supplemental Remarks O
O 6
, . . . . . . . . . - . . - . - . , _ = . . . -
- 9' Attatchmtnt 6,1 QI-056 Rev. 1 Page 1 of 2 v
i t
CCMANCHE PE.E RES?ONSE TI.Oi CHECC.IST POPULATION DESC VE?.IIIC.CION PKG NO.
j Instrument Pipe / Tube R-S-INSP- PAGE I 0F 2
~
Suec_ orts I QUALITI INSTRUCTION l QI-056 0artssisc:tox 0 miIT t EQUIP:iENT .".AFX/ TAG S0. @ DOCW.ENTATION REVIr4 ] CIIT 2 COMMON VERIFICATION ACCE?T REJECT DATE ,
i
! J. Inspector Certification
- a. Date
- b. Procedure l
- 2. Material Traceability
\.
- a. Material
- b. Heat Number i
- 3. Concrete Expansion Anchors 3.1 Torque l
- a. Calibr. due date l b. Torque setting 3.2 Bolt Spacing 3.3 Rework l
l 1
PREPARED BY: APPROVED BY:
4 _
DISCIPLINE ENGR. DATE LEAD DISCIPLINE ENGR. DATE INSPECTED 8Y: APPROVED BY:
D5?EC OR DATE LEAD LUSPECTOR DATE C??-007.LA. Revision 0
.. . . - - . . . . . . . .. -. -.~ .. _ - . . . . . _ . . - . ~ . . . . - . .
i:
Attechmzut 6.1 QI-056 Rev. 1 i
COMANCHE PEAK RESPONSE TEAM CHECKLIST 4
9
- POPULATION DESC VERIFICATION PKG NO.
[nstrument Pipe / Tube R- S-INSP- PAGE L OF 1 l Supports i
! VERIFICATION A -REMARKS ACCEPT. REJECT DATE i
i.
}
- 4. Stud Welding-4
- a. Daily Oualification i
i Production Studs b'.
- c. Final Visual l J
- 5. Drawing Revision i
b I
i t
J.
i 1
4 i i.
5 J,
j 4
l 4
J
?
5 3
i i
1 i
t .,
1 I
CPP-007.lB. Rovision 0 4
Attachmsnt 6.2
- QI-056 Rev. 1 Page 1 of 1 O
. HILTI BOLT TORQUE REQUIREMENTS Minimum Embedment Minimum Bolt Diameter Kwik-Bolts Super Kwik-Bolts Torque (Ft./Lbs) 1/4 1 1/8 -- 8 3/8 1 5/8 -- 17 1/2 2 1/4 3 1/4 70 5/8 2 3/4 -- 120*
3/4 3 1/4 -- 150 1 4 1/2 6 1/2 230 1 1/4 5 1/2 8 1/8 400
!O l
l
- Where 5/8" diameter bolts are used in conjunction with Unistrut members for l instrument pipe / tube supports in such a way that the bearing surface under the nut, used with a flat washer, bears against the open side of the Unistrut, the minirum installation torque shall be 80 f t.-lbs.
O 1
I i Attachmant 6.3 QI-056 Rey, 1
- E' I O SUPPLEMENTAL REMARKS VERIFICATION PACKAGE NO. R-S-INSP-ATTRIBUTE (NO./ DESCRIPTION) REMARKS 1
)
i lO 4
i f
O -- Date
- , _ _ _ - - _ ~ _ _ _ _ . _ _ . . . , _ . - _ _ . _ _ _ _ . _ , _ _ . , , _ _ _ . _ _ _ - , _ _ _ , _ _ - - _ , _ _