ML20203A128

From kanterella
Jump to navigation Jump to search
Rev 2 to Quality Instruction QI-009, Document Review of Conduit/R-E-CDUT
ML20203A128
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/24/1986
From: Hansel J, Patterson A, Ross G
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
QI-009, QI-9, NUDOCS 8607170182
Download: ML20203A128 (5)


Text

, _- __ - - _ . ._ _ _ .

t Pcgs 1 of 4

(

EVALUATION RESEARCH CORPORATION CON"R0_ _E] C0)Y CONTROL I40. D Fmt COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c INSTRUCTION NO.: QI-009 REVISION: 2 EFFECTIVE DATE: 02/24/86 DOCUMENT REVIEW OF CONDUIT /R-E-CDUT Prepared by: K, // .aw m Date: 2~ } ! " h [-

/

Approved by: , lh' '< at n . - Date: 2 #J ~[(h Issue Coordinator Approved by: . Date: .f . M -94 On-Site QA Representative Approved by: ,

'~

y, , [ Date: ,2!2,L/ 7(

/

(fC he' view Team' Leader /

i 8607170182 860711 PDR ADOCK 0500044S A PDR

e

/

QI-009

( Rev. 2 y

d

} 1.0 PURPOSE To provide methods to be used and the accept / reject criteria to be applied when performing document review of conduit.

2.0 APPLICABILITY

'* This procedure applies to document review of samples selected from

's the conduit population. The population is described in the Population Description for Conduit.

3.0 REFERENCES

3.1 Description Memorandum QA/QC-RT-271, dated August 27, 1985, delineating documentation used in the development of this procedure including specific sources for attributes and exclusions.

3.2 CPP-009, "?erformance of Reinspection and Documentation Review."

4.0 GENERAL g,) 4.1 Responsibilities ,

Responsibility for reinspection is set forth in Reference 3.2 4

4 5.0 INSTRUCTION Using.the information in Reference 3.2 and below, perform documentation reviews of the sample items in tids population and document the results of the documentation review on the checklist (Attachment 6.1).

The inspection of conduit fabrication activities was done on a surveillance basis, and therefore, an 1R covering the attributes listed below may not exist.

5.1 Class IE Conduit Raceway Inspection

a. Procedure If an IR for conduit fabrication is found, verify by document review that the following non-recreatable attributes for Class lE Conduit Fabrication have been inspected. If the IR is not found, record "N/A" on the Checklist.

Conduit ends free of burrs and sharp edges.

2

' l QI-009

[ Rsv. 2

)

/ 5.0 INSTRUCTION (Cont'd)

\~.)S Conduit ends cleaned of chips and foreign material, l Inspected status of NA, NO or no entry on the IR for I the non-recreatable attributes listed shall be reason for an unsatisfactory condition, except when a previous IR accepted this item.

The above listed attributes have been verified as being contained in the TUGC0 Quality Instructions, including all revisions, listed below:

Instruction Title QI-QP-11.03-11 Conduit Fabrication Inspection QI-QP-11.03-23 Class IE Conduit Raceway Inspections QI-QP-11.03-23-04 Verify conduit Fabrication i

QI-QP-11.03-30 Class IE Conduit b,') Fabrication

%J The above instructions may be covered as either a heading on the IR or as an individual attribute.

For multiple inspections of one conduit, the latest fabrication IR is te be reviewed. If the IR is only a partial inspection, such as reinspection of construction rework, then the next latest IR is to be reviewed to determine acceptability of the subject attribute.

b. Inspector Certification Verify by review of the inspector's certification file that each person signing as a QC inspector on the Inspection Report used in 5.1.a above was certified to the procedure used, at the time of the signature.

Record the IR number and procedure used.

NOTE: If this attribute is rejected, determine if the person that signed as a QC inspector was ever certified to the procedure used. If the inspector was ever certified to the procedure, record the time period of p)

(

certification, otherwise state that the person was never certified.

3

e QI-009 A Rev. 2 6.0 ATTACHMENTS 6.1 Checklist 1

4

6

?

I Attachment 6.1 QI-009

,~s Revision: 2

('-) CHECKLIST Page 1 of 1 CCMANCHE PEAK RESPONSE TEX'.

CHECIC.IST PCPULATION DESC VERIFICATION PKG No.

PAGE 1 0F 1_,

Conduit R-E-CDUT QUALITY INSTRUCTICN 01-009 O REINSPECTION O cNIT t EQUIPMENT MARK / TAG NO. @ DOC: MENTATION REVIEW 0, UNIT 2 O Cow.cN VERIFICATICN

^

ACCE?T REJECT p!E

1. Raceway inspection
a. procedure

(

b. inspector certification \/

<A (f"g) - - - . - -

v -

'\j Record the IR nurter and Pre _d u ed. t PREPARED BY: APPROVED BY:

DISCIPLINE ENGR. DATE LEAD DISCIPLINE ENGR. DATE

\ INSPECTED BY: APPROVED BY:

V INSPE(.IOR DATE LEAD I!'SPECTOR DATE CPP-007.lA, Rav'sion 0