ML20202J719

From kanterella
Jump to navigation Jump to search
Change Notice 001 to Rev 1 to Quality Instruction QI-069, Documentation Review of Epoxy Grout
ML20202J719
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/24/1986
From: Beasley C, Patterson A, Ross G
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
QI-069-02, QI-69-2, NUDOCS 8607170135
Download: ML20202J719 (2)


Text

F

  • C0 \"10_ _ D CO?Y CONTROL NO 0,=-nq EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 INSTRUCTION NO.: QI-069 REVISION: 1 ISSUE DATE: 02/24/86 7m DOCUMENTATION REVIEW OF EP0XY GROUT i )

The QI identified above is hereby changed as shown on the attached pages of this notice.

Prepared by: Or x Date: [-/f' b6]

c a Approved by: MMI- #R.A . - Date: 2 ' @N Issue Coordinator Approved by: .

Date: /'88-8[

On-Site QA Representative

/D Approved by: m!

C Re' view Tehm Leader Date: d d/ ((o

/ '/

Q 8607170135 860711 PDR ADOCK ObOOO445 A PDR 1

i Ching2 Notica 001

. .g y QI-069 Rev. 1 0 1. Attribute 3.b is amended to read:

"The lot of epoxy grout was tested to the requirements of ASHI C-579. The epoxy grout shall have "during use" compliance test results meetirg a minimum compressive strength requirement of 12,000 PSI."

i O

O 2

_.