Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
- - - .
Page 1 of 6 0 .
EVALUATION RESEARCH CORPORATION CO go DhM COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR ISSUE SPECIFIC ACTION PLAN I.d.1 i
PROCEDURE NO.: CPP-015 REVISION: 0 EFFECTIVE DATE: 7/22/85 Q
SPECIAL EVALUATION TEAM (SET) l l
PREPARED BY:Ce m E hm _ _< DATE: 7[/7/84
/ ( / '
APPROVED BY: DATE:
ON-SITE QA REPRESENTATIVE APPROVED BY: / DATE: "7 /[ [ '
TQC' RTVIEW TfKLEADER '/
o esp g h0 A .
I --
O CPP-015
- Revision: 0
('s 1.0 PURPOSE
(
The purpose of this procedure is to establish qualifications, responsibilities, and actions related to members of the Special Evaluation Team (SET).
SET has been. formed as a result of the USNRC/TRT inspection of the QC inspector training and certification records at the Comanche Peak Steam Electric, Station (CPSES). SET will evaluate inspector qualifications that could not be verified during Phase I of Action Plan I.d.1.
l 2.0 APPLICABILITY The requirements of this procedure apply directly to the activities of e'ach member of SET with regard to resolution of these concerns.
3.0 REFERENCES
l 3.1 Brown & Root Procedure QI-QAP-2.1-5, Revision 7 i
3.2 Brown & Root Procedure Ql-QAP-2.1-1, Revision 5 t
I "q 4.0 GENERAL i is ,/
4.1 Responsibilities 4.1.1 The QA/QC Review Team Leader is responsible for reviewing the qualifications and experience of the team members and ensuring that they meet the requirements of l this procedure.
l 4.1.2 The responsibility of the SET is to evaluate inspector qualifications CD$t could not be verified during Phase I of Action Plan-I.d.1, and other support activities as directed by the QA/QC Review Team Leader.
4.1.3 Each member of SET is responsible for reviewing an information packet containing the following:
- CPSES/FSAR, pages 1A(B)-24 and 1A(B)-24A, i dated April 30, 1981.
CPSES Quality Assurance Plan, Section 10, Examination, Tests and Inspections, Rev. 1, 7/31/84.
CPSES Quality Assurance Plan,Section II, Test Control, Rev. O, 7/1/78.
[
O - TUGC0 Procedure CP-QP-2,1, Rev. 16, July 17, 1984.
l 2 l
r F yw p-y--e -- -
O CPP-015
. Revision: 0
/
' _}
\ ,/ - TUGC.0 Procedures CP-QP-2.0, CP-QP-2.3, and DQI-QA-2.1.
- USNRC Regulatory Guide 1.58, Rev.'l September 1980.
ANSI /ASME Standard N45.2.6-1978.
REPORT /USNRC/TRT Inspection, Item Number I.d.1.
TUGC0 Response to USNRC findings (I.d.1) and Action Plan dated August 17, 1984.
10CFR50, Appendix B.
After review of the information packet, each member will sign a form similar to Attachment 6.1 attesting to the fact that the member has read and understands the information. Should a team member have any question regarding the information, he should consult the Team Leader for resolution.
4.1.4 The QA/QC Review Team Leader is responsible for assuring that each team member understands the
,g responsibilities identified in this section.
%I 4.2 Qualifications Each member of SET shall meet auditor experience and qualification requirements of ANSI N45.2.23.
Each member shall have five years experience in the Quality l Assurance field in either a management or supervisory role l directly related to nuclear quality assurance.
Each member will have experience in some aspect of training, either inspection of training programs or actual experience in the conduct of training.
Personnel comprising the SET will be independent of the TUGC0 QC training / certification process.
Each member shall supply a resume of this education and experience noted above to the SET Team Leader.
l 4.3 Team Composition l
l The SET will normally be composed of a maximum of three i members, one of which will be the team leader. A majority of the members will be required to resolve any disagreements i
j () resulting from resolution of the findings in this action.
l 3
f l
f
. Revision: 0 t}
(. / In the case of.a disagreement, the team leader will meet with the QA/QC Review Team Leader to resolve the disagreement.
4.4 Documentation Each team member shall keep records during the review of each QC inspector file and if an inspectors qualifications are found acceptable, they shall document the basis for acceptability.
At the conclusion of the file review, each team member will finalize his notes in a form similar to Attachments 6.2 and 6.3.
This report will contain the findings of each team member, evaluation of the findings by the team member, and disposition and resolution of each finding with recommendation for corrective action.
5.0 PROCEDURE Under Phase I, the TUGC0 Audit Group (TAG) will review the training / certification files for every electrical QC inspector who has ever worked at CPSES and for every non-ASME inspector presently f-on-site against project requirements. Evaluation Research
( Corporation (ERC) will review the certification records of current ASME inspectors to verify compliance with the procedures, in place at the time, for certifying / qualifying ASME inspectors (see References 3.1 and 3.2)
If an inspector's qualifications cannot be verified, or some question is raised by TAG or ERC regarding these files, those
- training records will be referred to the SET for evaluation, resolution or disposition. SET will evaluate these inspector records found to be questionable for acceptability considering the
Experience of the inspector Education of the inspector i - Formal training at CPSES l
On-the-job training that demonstrates practical l
proficiency i
I - Examinations that demonstrate procedural knowledge Other valid certification in related areas
- Other considerations deem appropriate by SET 73 d
1 4
.0 CPP-015
. Revision: 0
, . () Inspectors whose qualifications are found to be acceptable will be documented and dispositioned as acceptable without further action.
The basis used by the SET for this determination will be documented and will be included in the final SET report.
The basis should meet, as a minimum the criteria identified in the documents listed in Section 4.1.3. The certification summary for these inspectors will reflect the evaluation performed by the SET.
In the event that inspectors.are found whose qualifications to 4 project requirements cannot be verified, the SET will review those individuals' training records to determine the adequacy of inspections made by the individuals and provide a determination on the impact of the deficiencies noted on the safety of the project.
The SET Team Leader shall provide liaison between the TAG, ERC and the SET and coordinate the distribution of the selected inspector files to the other member of the SET.
If during a review, a member of the SET has a concern related to the qualifications, experience or education of any TUGC0 or Brown &
! Root inspector, or to the criteria used for certification, he should immediately bring this to the attention of the SET Team Leader for resolution.
() In general, the following sequence will be followed:
I - TAG will report to the SET on the general results of the Phase I evaluation of non-ASME Inspectors.
Included in this report will be the number of discrepancies noted, the types of discrepancies, and TAG recommendations for resolutions / disposition of these discrepancies.
- The TAG will then turn over the information on possible discrepant files to the SET. The team leader will distribute these to the individual members, and each member will review his files against the requirements noted in Section 5.0.
- ERC will report the results of the ASME inspector Phase I evaluation. The results will be reportd on an
! Inspector Qualification Checklist.
As the QC inspector files are reviewed by the SET, they will be determined to either meet the criteria and thus resolved, or if a ,
i concern exists, the SET will determine further resolution / disposition. Procedures necessary to address ectivities beyond the scope of this instruction will be generated as required prior to performing these activities.
5
. Revision: 0
( Should a concern identified by the TAG or ERC be resolved by the
-SET, then the reasons for acceptability without further action will be documented by the SET. This documentation will also be presented in the final SET report and will include all files reviewed, acceptance criteria, resolution of concerns, conclusion on root cause and recommendations on project instructions needing to be revised and criteria to be added or deleted, or the corrective action as required.
6.0 ATTACHMENTS 6.1 Notification of Compliance 6.2 Team member file for QC Inspector / Experience - Training 6.3 QC Inspector / Education o
O O
6
A Attachment 6.1 7
W CPP-015 Revision 0 Page 1 of 1 NOTIFICATION OF COMPLIANCE q\s ,
SPECIAL EVALUATION TEAM (SET) -
I NOTITICATION OF COMPLIANCE STECIAL EVALUATION TEAM (SET) 1 . have reviewed the information ,
identified in ERC CPP-015 Section 4.1.3, and understand the information contained therein. I also have reviewed the qualifications for a member f of the Special Evaluation Team (SET) and certify that I seet these ,
qualifications and agree to accept the re+ponsibility as a member of !
this team. I have submitted a copy of my me to the SET Team Leader for his review and subsequent inclusion .t t records of the SET. ,
Signed , !
i e
\ ,
l' l'
I f
i !
\
l e CPP-015.1 Rev. 0 f
O I l
=
A Attachment 6.2 v CPP-015 Revision: 0 Page 1 of 1 QC INSPECTOR / EXPERIENCE - TRAINING 9 SPECIAL EVALAUTION TEAM (SET)
... TEAM HDGER FJLE FOR QC INSPECTOR / EXPERIENCE-TRAINING Nare Social Security No.
TRAINING / CERTIFICATION CRITERIA Tears experience in QA. QC or QE Tears experience in rela raft Tears experience at journe n v Tears waived for 0 Color Vision s (Ish Color Vision T ther)
Passe Le 1Ie m. Date i
P se exte. Date j Other SET Memb Notes.
i l
l t
l i
This Man's experience meets the requirements of ANSI E45.2.6 4 :
I i
CPP-015.2 Rev. 0 l l
O .
a Attachenet 6.3 0 CPP-015 Revision: O Page 1 of 1 O2 QC INSPECTOR / EDUCATION V .
I l
i l
l l
SPECIAL EVAISATION TEAM (SET)
- QC INSPECTOR / EDUCATION l
Name Social Security No.
EDUCATION CRITERIA / RECORD CED School Date High School Diploma _ . e College Level Work . *e A _
College Degree _
D e
.o Advanced Degree <3s) . Date Other Education A ( , Date 9 M i Other FET Mes* Notes:
l l
l i
This Man's e'xperience meets the requirements of ANSI '
N45.2.6 O
CPP-015.3 Rev. O O
l l
l I
<