MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
m l
i k
't Page 1 of 5 O
EVALUATION RESEARCH CORPORATION CO TR0'_D CO?Y CONTROL N01F-ccl COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 PROCEDURE NO: QI-048 REVISION NO: 1 ISSUE DATE: 05/22/86 DOCUMENTATION REVIEW OF TUBING WELDS / MATERIAL The QI identified above is hereby changed as shown on the attached pages of this notice.
Prepared by: 4026 Date: b!O!$
/
Approved by: II4 W //* M44. ~ Date: I!
Issue Coordinator Approved by: , .
d_/ M Date: 5[c} /[84 On-Site QA Representyive Approved by: [_ b Date 6bI #[,
QAliQCReviewTeamLeper / /
0607170103 860711 PDR ADOCK 00000445 .
A PDH
4
, , Chang 2 Notico 001 QI-048 Rev. 1 LO ITEM CHANGE TO QUALITY INSTRUCTION 1.- Pages 5'and 6, Attribute 2, " Base Material Traceability", is changed to read:
Page 5, 3rd and 5th bullets:
4 That the base materials size (see Note 3), material specification, grade and ASME Code Class listed on the isometric drawing, the CMTR and/or C of C, and the MRS bill of materials, when available, are the same. The ASME code class need not be listed on the MRS. For Incore Detector couplings and nozzles, verification of the above (when not required by j the isometric drawing) may be achieved by certification to the
- requirements of Westinkhouse drawings (i.e., dwg # 501B510, for couplings) to the C of C.
1 Page 6, 2nd and 6th bullets:
i That the base material size, (see Note 6), material
! specification, grade and ASME code class listed on the f
isometric drawing, the CMTR and/or C of C (for tubing only),
and the MRS bill of materials, when available, are the same.
The ASME code class need not be listed on the MRS.
- 2. Page 9 Attribute 7 " Inspector Certification", delete entirely and replace with the following
- Verify, by review, that the QA/QC Inspector (s) who
- initialed / signed and dated the inspection results on the WDC,
- the RPS (when applicable), the NDE report (s), the MRS (when
- available), and the Pressure Test Data Sheet, were certified
! at the time the inspection was performed. To accomplish this,
! check the Monthly Mechanical and NDE Certification Report
- effective at the time of the inspection, or the inspectors
! certification records as follows:
i For Incore Detector tubing, the Inspector's area or
, category of certification is, as a minimum, ASME QC Level II, for Mechanical Installation Fabrication i Inspection (MIFI), Visual Welding Inspection (VT), or the appropriate NDE as applicable.
i For tubing other than the Incore Detector tubing, the l Inspector's area or category of certification is, as a
- minimum, ASME QC Level II, prior to February 11, 1982, or NON-ASME QC Level II on or after February 11, 1982, 1
for MIFI/ Instrumentation and Control Inspection (I&C),
I- Visual Welding Inspection (VT), or the appropriate NDE 4
as applicable.
I i w-i
- 2 t
- - - ~ _ . . . . - . ._. - .- - . _ -
7s, d
l
, Ch ngs Notico 001 QI-048 l Rev. 1 ITEM CHANGE TO QUALITY INSTRUCTION I 2. When it is not possible to determine (from these (Cont'd) documents) whether the inspector was certified to ASME or NON-ASME requirements; the inspector shall:
Obtain the Inspection procedure used from the WDC, and identify by using the " Inspection Procedure Table" listed below, whether the r
procedure used is for ASME or NON-ASM2 Tubing Inspections.
Verify by review of the Inspectors Certification Package, that tha Inspector was certified to that procedure. ,
- Procedure Inspection .
1-Procedure No. Description Type i CP-NDEP-200 Visual Examination Weldsents ASME QI-QAP-10.2-7 Visual Examination Weldsents j QI-QAP-11.1-26 ASME Pipe Fabrication and Installation Inspections
! QI-QP 11.8-11 Inspections of Welded NON-ASME Instrumentation Tubing i
QI-QP 11.21-1 Requirements for Visual Weld Inspections Note: Should there be no procedure reference on the WDC, or if a procedure other than the ones listed above is referenced, contact the l population engineer before rejecting this attribute. Such cases will be handled individually.
Verify that the Inspector's date of certification was prior to the date of the inspections performed, and inspections were performed prior to certification expiration date.
Note If this attribute is rejected, determine if the person that signed as a QC Inspector was ever certified in the appropriate area or category.
If the inspector was certified, record the timo period of certification. Otherwise, state that the person was never certified.
O 3
\
.m4 .
Changs Nstico 001 QI-048 Rev. 1 O
b ITEM CHANGE TO QUALITY INSTRUCTION
- 3. Page 10, add attribute 8. " Pressure Test (Hydrostatic /
Pneumatic)" as follows:
8.0 Pressure Test (Hydrostatic / Pneumatic)
For the tubing where the sample weld is located, verify by review the following:
That a hydrostatic (or pneumatic) pressure test i
was performed and that the Pressure Test Data Sheet (for the latest pressure test performed on the sample weld) has been signed and dated by a QC Inspector as acceptable. These documents are in the Pressure Test Data Package.
That the pressure test was performed after any weld repairs which may have been identified in the weld data package.
Note 1: For Unit I and Common Systems:
If a pressure test has not been performed, contact the population Os engineer to determine if it was exempt from a pressure test before rejecting this Attribute. If exempt from pressure testing mark "N/A" (Verification column) and " Exempt j from pressure test" (Remarks column) on the checklist.
Note 2: For Unit 2 Systems:
If a pressure test has not been
- performed at this time, this attribute shall be marked "N/A" (Verification column) and " Test not performed yet" (Remarks column) on the checklist.
I Note 3: Test Boundaries are shown on system flow diagrams and drawings which are provided in the Pressure Test Data Package.
This attribute can be verified by utilizing the following steps:
l
(/
- From the DWG identify the associated instrument equipment number for the tubing containing the sample weld. Also identify any component identifications ne#k*the weld.
4
N jI
- a Chengs Nstics 001 QI-048 Rev. 1 ITEM CHANGE TO QUALITY INSTRUCTION
- 3. Obtain the Pressure Test Data Package number by (Cont'd) cross-referencing this information (instrument equipment number, and/or component identification numbers) on the Startup Hydro Group's Startup Hydro Test Log, or the Plant Information Management System PIMS Hydro Report computer listing (sorted by component number).
The Startup Hydro Report, Test Log, and PIMS Hydro Report document all pressure tests which have been performed. If there is no Pressure Test Data Package identified on these reports for the DWG information associated with the weld, it can be assumed that no pressure test has been performed.
Obtain the Pressure Test Data Package from the B&R PPRV, TUCCO PPRV, or the B&R IRV.
- 4. Add attribute 8, " Pressure Test (Hydrostatic / Pneumatic)" to the checklist, attached.
O l
l l
O 5
8 s
g- ..
3 Change Notice 001 Attachment 6.1 COMANCHE PEAK RESPONSE TEAM QI-048 CHECKLIST Rev. 1 POPULATION DESC VERIFICATION PKG NO.
Tubing Welds / Material R-M-TUWM- "PAGE 1 0F 1 QUALITY INSTRUCTION #
QI-048 CREINSPECTION h UNIT 1 EQUIPMENT MARK / TAG'NO. DOCUMENTATION REVIEW UNIT 2 i
COMMON VERIFICATION REMARKS ACCEPT REJECT DATE
- 1. Wald Procedure Application
- 2. Base Material Traceability
- 3. Weld Material Traceability
- 4. Wald Procedure Qualification
- 5. Welder Qualifications
- 6. Hold Points
- 7. Inspector Certification
- 8. Pressure Test (Hydrostatic /
Pneumatic)
PREPARED BY: APPROVED BY:
O DISCIFLINE ENCR.
IN5FEcu.u BY:
DATE LEAD DISCIPLINE ENGR.
APPROVED BY:
DA*E p -
LN5 F EL wR DATE LEAD INSPECTOR DATE CPP-007.IA, Revision 0 '