Change Notice 001 to Rev 7 to Procedure CPP-010, Preparation of Deviation Repts
ML20202J558
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/15/1986
From: Bajada E
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
CPP-010, CPP-10, NUDOCS 8607170104
Download: ML20202J558 (2)


Text

I

. Page 1 of 2 cx EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS o

CHANGE NOTICE: 001 COWROWD C '

PROCEDURE NO.: CPP-010 CONTROL No. R1_h o REVISION NO.: 7 ISSUE DATE: 05/15/86 (s

b PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as shown on the attached page of this notice.

l l

i Prepared by: Date:

M!h Approved by: , , /u' at:/S Date: .T!/F[6$

On-Site QA Representa ve Approved by: . . 1 Date: f6%

QA/p Review Team Lepder //

8607170104 860711 PDR

~

ADOCK 05000445 PDR

. . I Changs Notica 001 CPP-010 73

i Revision
7 V'
1. Delete the following portion of Section 4.4.3:

, or an adverse trend analysis of the unclassified trend"

2. Change the second sentence in the first paragraph of Section 5.2.2 to read:

"Second reviewers determine when a deviation or set of related deviations constitute an unclassified deviation."

3. Change Section 5.3.2, first paragraph, to read:

"The QA/QC Records Administrator normally transmits copies of valid DRs received from the second reviewer (refer to Paragraph 5.2.2) to:

. the SSEG Supervisor for analyses,

. the CPSES QC Coordinator for further processing in accordance with Reference 3.3, and

, the QA/QC Interface Coordinator for action as required per Reference 3.5.

g is,) Valid DRs in the following categories are also transmitted to tbs Project Manager, Pipe Stress and Pipe Support Reconciliation Project:

LBCO PIWM LBSR SBPS SBC0 PBFA LBSN PWRE Unclassified DRs and those reviewed by the ISAP I.d.1 Issue Coordinator are transmitted to the SSEG Supervisor for information only, as safety-significant evaluations for those DRs are unwarranted. DRs reviewed by the ISAP I.d.1 Issue Coordinator are also transmitted to the appropriate first I

reviewer for use in the collective evaluation."

I bs 2