Change Notice 001 to Rev 2 to Procedure CPP-008, Preparation of Verification Packages
ML20202J487
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/1986
From: Hansel J, Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
CPP-008, CPP-8, NUDOCS 8607170090
Download: ML20202J487 (2)


Text

pp, lI r.tQ **

Prga 1-of 2 00CR0;.JD 00)y

.b con'fROL NL=m: cot

. EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 PROCEDURE NO: CPP-008 REVISION: 2 EFFECTIVE DATE: 06/30/86 PREPARATION OF VERIFICATION PACKAGES Prepared by: M ,,5Nid d Date: 4dt/N d

Approved by: N Date: [/f/, M.

On-Site Q p epresentative / '

Approved by:  : _" Date: 24 8d ycR.v1..,...,....r O nrim sne A

'l  ; -,

4 Ching2 Notics 001

, CPP-008 Rev. 2 j 1. Revise Paragraph 5.1.4 to read:

i 5.1.4 Verification Package for Documentation Review

,g1

)

The engineer reviews the population Quality Instruction to

~~' determine if the types of contractor documentation to be reviewed and their locations are identified in the QI. If not, they shall be identified in each verification package. The engineer also includes the Data Base Report prepared in accordance with Reference 3.2.

2. Revise first paragraph of item 8 of attachment 6.1 to read:

(8) As applicable, enter the date the document was completed.

That is, the date the QA/QC Lead Discipline Engineer approved the Supplemental Inspection Instruction is the date the instruction was completed. The date the DR is (in) validated is the date the DR was completed.

3. Revise item 10 of attachment 6.1 to read:

(10) Enter separately the information specified in instruction (7),

(8), and (9) and if not given in the QI, the location of the reference documents needed by the Inspector, but not included in the Verification Package.

O O

w 2