ML20154B917

From kanterella
Jump to navigation Jump to search
Requests Listed Ref Matl Required for Reactor/Senior Reactor Operator Licensing Exams Scheduled for Wk of 880109. Forwards Instructions
ML20154B917
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/09/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8809140186
Download: ML20154B917 (10)


Text

_ - _ _ _ _ _

. GEP 9 1933 Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690

Dear Mr. Reed:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. L. Bunner, and Me. T. Reidinger, arrangements were made for the administration of examinations at the Byron Nuclear Station.

The written and oral examinations are scheduled for the week of January 9, 1989.

In order for us to meet this schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1 "Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations" at least 60 days prior to the examination date. Any delay in receiving properly bound and indexed reference material will result in a delay in administering the examinations. Our examinations are scheduled far in advance with considerable planning to best utilize our limited examiner manpower and to meet the examina-tion dates requested by the varieus facilities. Therefore, missing the deadline, even by a few days, will likely result in a long delay since it may not be possible to reschedule examinations at other facilities. Mr. L. Bunner has been advised of our reference material requirements, the number of reference material sets that are rer,uired, and the examiners' names and addresses where each set is to be mailed.

The facility management is responsible for providing adequate space and accommodations in order to properly conduct the written examinations.

Enclosure 2 "Administration of Reactor / Senior Reactor Operator Licensing Written Examinations," describes our requiremen's for conducting '.hese I exwinations. Mr. L. Bunner has also been infomed of these requirements.

l In addition, to better document simulator examinations, the chief examiner will have the facility simulator operator record prespecified plant conditions (i.e., plant pressure, temperature, pressurizer level, etc.), for each simulator scenario. The candidate will be responsible for providing this infonnation, along with any appeal of his simulator operating examination. Therefore, the facility training staff should retain the simulator examination scenario information until all candidates taking the examination have either passed the operating examination er all appeals filed by the candidates who failed the operating examination have been completed.

Enclosure 3 contains the Rules and Guidance that will be in effect during the administration of the written examination. The facility management is respon-sible for ensuring that all candidates are aware of these Rules,

\

wwr%

V e )

A Comonwecith Edison Company 2 pp 9}ggg All reactor operator and senior reactor operatnr license applications should ,

normally be submitted at least 60 days prior to the first examination dates so ,

that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has been determined. If the applications are not received at least 30 days prior to the examination dates, it is likely that a postponement will be necessary.

This request for information was ap> roved by the Office of Management and Budget under Clearance Number 3150-0101, w11ch expires May 31, 1989. Conrnents on burden and duplication may be directed to the Office of Management and Budget, i Reports Management Room 3208, New Executive Office Building, Washington, D.C.

20503.

The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4 "Requirements for Facility Review of Written Examination." Mr. L. Bunne" has been infonned of these requirements.

1 Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact T. Reidinger at 312-790-5551, 3

Sincerely, I

0"".

7: 0 N CE0TiiH C, ainiT 1

Geoffrey C. Wright, Chief Operations Branch

Enclosures:

1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations

! 2. Requirements for Administration of Written Examinations r l 3. NRC Rules ar.d Guidelines for  :

I License Examinations l

4. Facility Review Requirements See Attached Distributic.1 L

l W .

I Rei inger/lc Bu ick Wigi 9/d/88 T/n  ;

l

-e . . _ -__.r< . . . _ , . - - , , _ - - , , - _ - - - _ _ _ _ _ , . - _ , _ - ~ . - . - - - - _ _ - . _ - - - - - , - - _ - - , - - -_-

Commonwealth Edison Company 3 ggp 9 ;ggg cc w/ enclosure: '

T. J. M31 man, Vice President, PWR Operations H. Bliss, Nuclear Licensing Manager R. Pleniewicz, Station Manager DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RI!! Byron Resident Inspector, RI!!

Braidwood D. W. Cassel, Jr., Esq.

Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division Dicne Chavez, DAARE/ SAFE L. Olshan, NRR LPH H. S. Taylor, Quality Assurance Division ,

A. 1. Chernick, Plant Training Manager  !

cc w/o enclosures:

L. Olshan, Project Manager, NRR '

j J. N. H6nnon, Branch Chief, OLB J. M. Hinds, Section Chief, DRP <

f I

l l  !

t l

1 .

.! I l

ENCLOSURE 1 Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations

1. Failure to provide complete, properly bound and indexed plant reference ,

material will result in canceling and rescheduling of the examinations. )

i

2. Training material should include all substantive written material used I for preparing candidates for initial R0 and SRO licensing.
3. The written material should include learning objectives and the details presented during lectures, rather than outlines.
4. Training material and procedures should be identified by plant and unit  !

along with appropriate indexes or table of contents. '

5. The reference material and procedures should be approved, final issues, and should be so marked.
6. If the facility is in the process of revising some of the material, the material received by the Connission will be used for the examination.

Any material under revision, upon receipt of this letter > must be finalizcd when the required material is submitted.

7. Thr, following training materials shall be provided:
a. System descriptions.

System descriptions shculd include descriptions of all operationally relevant flow paths, components, controls, and instrumentation.

1

b. Existing system learning objectives and leeson plans.

1 System training material should draw parallels to the actual procedures used for operating the applicable system,

c. Complete and operationally useful descriptions of all safety-system interactions,
d. Where available. Balance-of-Plant system interactions under emergency and abnormal conditions, including consequencts of anticipated operator error, maintenance error, and eauipment failure,
e. Comprehensive theory material that includes fundamentals in the area of theory of reactor operations, heat transfer and fluid flow, and specific application to actual in-plant components.

Thermodynamics learning objectives and lesson plans.

For example, mechanical theory material on pumps should include pump theory as well as descriptions of how these principles

7 actually apply to major plant pumps and systems in which they are installed i.e., Reactor Coolant pumps, all ECCS pumpt, Recirculation pumps, Feedwater pumps, and Emergency Feedwater pumps.

Reactor theory learning objectives and lesson plans.

For example, Reactor Theory material should include descripticns that draw explicit ties between the fundamentals and actual operating limits followed in the plant i.e.,

reactor theory material should contain explanations of how principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP.

f. Training manuals,
g. Plant orientation manual.
h. Training material and learning objectives used to clarify and strengthen understanding of emergency operating procedures,
i. Procedure index (alphabetical by subject).
j. All applicable reactor operating and safety administrative procedures ,
k. A table of contents for all facility administrative procedures.
1. All integrated plant operating procedures (normal and general operating procedures),
m. Emergency procedures (emergency instructions, abnormal or special procedures),
n. Standing orders (important orders that are safety-related and may supersede the regular procedure),
o. Fuel handling and core loadin procedures, when appropriate)g procedures (initial core loading
p. Annunciator procedures (alarm procedures, including set points),
q. Radiation protection manual (radiation control manual or procedure),
r. Emergency plan implementing procedures,
s. Technical specifications,
t. System operating procedures,
u. Piping diagrams or flow charts.
v. Instrurentation diagrams or flow charts.

2

w. Electrical diagrams or flow charts. ,
x. Technical data book and/or plant curve information as used by operators.
y. Facility precautions, limitations and set points.
z. Questions and answers and f.imulator scenarios specific to the facility training program which may be used in the written i examination or operating test, respectively (voluntary by the facility).

. ca. ECCS system Surveillance proceduras required by Technical Specifications.

bb. The following information on the plant referenced simulator:

  • List of all available initialization points.
  • List of all present malfunctions with a clear identification
number. This list should include cause and effect information
and a list of which annunciators are to be initially expected, i

Specifically, for each malfunction, a concise description of j the expected result, or range of results, that will occur upon

implementation.

)

A description of simulator failure capabilities for valves, breakers, indicators and alarms.

4 l

Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction should be provided, i. e., ability to vary the size of a LOCA or steam leak, or the ability to cause a slow failure of a component such as a feed water pump, turbine generator or major valve.

For example , the drifting shut 57 a main feed water regulating valve.

A list of modeling conditions or simulator problems that may impact the examination.

Identification of any known performance test failures not yet completed.

Copies of facility generated scenarios that expose the candidates to situations of degraded pressure control (PWR),

degraded heat removal capacity (PWR and BWR), and containment challenges (BWR).

Simulator instructor's manual. (voluntary by the facility)

  • Description of the scenarios used fer the training class.
8. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.

3

ENCLOSURE 2 Requirements for Administration of Written Examinations Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the i responsibility of the licensee.

2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3 foot spacing between tables. No wall charts, models, '

and/or other training materials shall be present in the examination room.

3. Suitable arrangements are to be made by the facility if the candidates are to have lunch, coffee, etc. These arrangements shall comply with Item 1 above. These arrangements will be reviewed by the examiner and/or proctor.
4. The facility staff shall be provided a copy of the written examination and answer key after the last candidate has completed and handed in his written examination. The facility staff shall then have five working days to provide formal written conments with supporting documentation on the examination and answer key to the chief examiner or to the regional office section chief.
5. The facility licensee will provide pads of 8-1/2 x 11" lined paper in unopened packages for each candidate's use in completing the examination.

The examiner will distribute these pads to the candidates. All reference material needed to complete the examination will be furnished by the i examiner. Candidates can bring pens, pencils, calculators or slide rules i into the examination room and no other equipment or reference material l will be allowed.

l

, 6. Only black ink or dark pencil. :hould be used for writing answers to i questions.

l l

1 _ _ _ ._

ENCLOSURE 3 NRC Rules and Guidelines for License Examinations During the administration of this examination the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. Restroom trips are to be limited and only one candidate at a time may r l

leave. You must avoid all contacts with anyone outside the examination .

room to avoid even the appearance or possibility of cheating. [

] 3. Use black ink or dark pencil only to facilitate legible reproductions. ,

j  !

Print your name in the blank provided on the cover sheet of the

~

4. i examination.
5. Fill in the date on the cover sheet of the examination (if necessa y).

l 6. Use only the paper provided for answers.

7. Print your name in the upper right-hand corner of the first page of
each section of the answer sheet. I
8. Consecutively number each answer sheet, write "End of Category " as appropriate, start each category on a new page, write on only one side 3

of the paper, and write "Last Page" on~ E e last answer sheet.

! 9. Number each answer as to category and number, for example,1.4, 6.3.

10. Skip at least three lines between each answer.

l 11. Separate answer sheets from pad and place finished answer sheets face  !

down on your desk or table. '

12. Use abbreviations only if they are commonly used in facility literature. l t
13. The point value for each question is indicated in parentheses after the  ;

question and can be used as a guide for the depth of answer required. .

14. Show all calculations, methods, or assumptions used to obtain an answer e l to mathematical problems whether indicated in the question or not.

i

15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION l AND 00 NOT LEAVE ANY ANSWERS BLANK. ,

f 16. If parts of the examination are not clear as to intent, ask questions of the e'.aminer only.

I l

1 e

l

F

17. You must sign the statement on the cover sheet that indicates that the work is your own and you have not received or been given assistance in completing the examination. This must be done after the examination has been completed.
18. When you complete your examination, you shall:
a. Assemble your examination as follows:

(1) Exam questions on top.

(2) Exam aids - figures, tables, etc.

(3) Answer pages including figures which are a part of the answer.

b. Turn in your copy of the examination and all pages used to answer L the examination questions,
c. Turn in all scrap paper and the balance of the paper that you did I not use for answering the questions.
d. Leave the examination area, as defined by the examiner. If after  !

leavi v,, you are found in this area while the examination is still t in progress, your license may be denied or revoked. j f

i l

I

?

I I

2 l

ENCLOSURE 4 Requirements for Facility Review of Written Examination

1. There shall be no review of the written examination by the facility staff before or during the administration of the examination. Following the administration of the written examination, the facility staff shall be provided a marked-up copy of the examination and the answer key.
2. The facility will have five (5) working days from the day of the written .

examination is given to provide formal comment submittal. The submittal '

will be made to the responsible Regional Office by the highest level of corporate management for plant operations, e.g., Vice President for Nuclear Operations. A copy of the submittal will be forwarded to the chief examiner, as appropriate. Contents not submitted within five (5)

, working days will be considered for inclusion in the grading process on a case by case basis by the Regional Office section chief. Should the I comment submittal ceadline not be met, a long delay for finalization of the examination results may occur.

3. The following format should be adhered to for submittal of specific connents:
a. Listing of NRC Question, answer and reference.
b. Facility comment
c. Supporting documentation NOTES: (1) No change to the examination will be made without submittal of complete, current, and approved reference i 1 material. ,

(2) Conments made without a concise facility recommendation will not be addressed.

l 4

f I

I

. - _ _ _ _ _ - - . _ - _ _ _ _ _ . . . - _ __ _ _ _ . _ - _ _ - - _ - _ - -