ML20151X131

From kanterella
Jump to navigation Jump to search
Forwards Results of Water Samples from Wells Located on Util Property Obtained During 870921-25 Insp as Suppl to Insp Repts 50-321/87-25 & 50-366/87-25.Measurement Comparisons & Criteria for Comparing Measurements Provided
ML20151X131
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/28/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Head G
GEORGIA POWER CO.
Shared Package
ML20151X136 List:
References
NUDOCS 8805040062
Download: ML20151X131 (2)


See also: IR 05000321/1987025

Text

'

b//jsal

3

o

APR 2 81988

Georgia Power Company

udTN: Mr. George F. Head

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: DOCKET NOS. 50-321 AND 50-366, RESULTS OF MEASUREMENTS OF SPLIT

WATER SAMPLES, SUPPLEMENT TO INSPECTION REPORT NO. 50-321/87-25

AND 50-366/87-25

During the Nuclear Regulatory Commission (NRC) inspection conducted by

R. R. Marston on September 21-25, 1987, Georgia Power Company (GPC) and the NRC

inspector obtained water samples from wells located on GPC property within the

protected area. The samples were to be analyzed for tritium by GPC and the

NRC. The results of the GPC analysis were sent to the NRC on January 28, 1988.

The comparison of your results to the NRC results is presented in Enclosure 1

for your information. The acceptance criteria for the comparison are listed in

Enclosure 2.

In our review of the data, it was noted that only one set of the comparative

results were in disagreement. These data should be reviewed in greater detail

by cognizant staff members for any significant trends in the data. Any biases

noted may be indicative of a programmatic weakness, and your efforts should be

expended in determining reasons for such biases.

These results will be discussed further at a subsequent inspection.  ;

l

Sincerely, 1

Douglas M. Collins, Chief

Emergency Preparedt.ss and

Radiological Protection Branch

Division of Radiation Safety

and Safeguards

Enclosures:

1. Measurement Comparisons

2. Criteria for Comparing Analytical

Measurements

cc w/encis: (See page 2)

8805040062 000428

gDR ADOCK 0b000321

PDR

il

l

JEe&

r

O

Georgia Power Company 2

c / i

(J'c

. T.wBeckham,

enc s: Vice President, Plant Hatch

c . C. Nix, Plant Manager

. M. Fraser, Site Quality Assurance (QA)

Jupervi sor

% Gucwa, Manager, Nuclear Safety

and Licensing

bcp w/encis:

'NRC Resident Inspector

DRS Technical Assistant

M h S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

1

l

l

1

RII RII RII

RM ' on J MSirkule

4/ /88 //f/88 4/p/88

1