Letter Sequence Other |
---|
CAC:001028, (Approved, Closed) EPID:2019, License Amendment Request to Modify Technical Specifications 3.4.16, RCS Specific Activity, 3.7.13 Secondary Specific Activity, 5.5.7, Ventilation Filter Testing Program (Vftp), and 5.5.14, Control Room Envelope. (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19150A559, ML19182A107, ML20002A442, ML20009D008, ML20010D564, ML20015A450, ML20015A451, ML20015A454, ML20028E845, ML20028E846, ML20049A082, ML20052E146, ML20052E154, ML20065N281, ML20071F156, ML20076D696, ML20099A180, ML20104C015, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20136A050, ML20136A051, ML20150A335, ML20150A421, ML20155K741, ML20155K743, ML20155K744, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20261H420, ML20269A259, ML20279A577, ML20279A586, ML20289A493... further results
|
MONTHYEARML20052D9362018-07-0303 July 2018 Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Project stage: Request ML18267A2142018-08-29029 August 2018, 25 September 2018 Package: Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Request ML18267A2112018-09-25025 September 2018 Memorandum to A. Rivera-Varona Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Meeting ML18320A1842018-11-16016 November 2018 Letter to J. Isakson Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI, Part 1 (W/Enclosure 1) Project stage: RAI ML19032A2302019-02-0404 February 2019 Summary of Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the Interim Storage Partner Consolidated Isfs Application for a Facility at Andrews County, Texas (W/Encl. 1&2) Project stage: RAI ML19065A0192019-03-0606 March 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the WCS Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72.1050 - First Request for RAI Part 2 (W/Enclosure 1) Project stage: RAI ML19072A1562019-03-14014 March 2019 Summary of Partially Closed Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the ISP Cisf Application for a Facility at Andrew'S County, Tx (W/Encl. 1&2) Project stage: RAI ML19126A0682019-04-0303 April 2019, 6 May 2019 Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas Project stage: Request ML19105B2172019-04-19019 April 2019 Memorandum to C. Regan Summary of March 20, 2019, Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the Interim Storage Partners Consolidated Isf Application (W/Enclosures 1 and 2) Project stage: RAI ML19120A4282019-04-23023 April 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI (W/Enclosure) Project stage: RAI ML19126A0662019-05-0606 May 2019 Memorandum to C. Regan Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas (W/Enclosure 1 & 2) Project stage: RAI ML20015A4502019-05-31031 May 2019 Sprint Andrews County Disposal Facility, Andrews County, Texas- Railroad Commission of Texas Commercial Processing and Disposal Facility Permit Application Project stage: Other ML19150A5592019-06-0303 June 2019 Letter to J. Isakson Site Audit Plan for Interim Storage Partners Proposed Application for a Site-Specific License of an Away-from-Reactor Independent Spent Fuel Storage Installation Project stage: Other ML19182A1072019-07-0101 July 2019 Letter to J. Isakson Interim Storage Partners Llc'S Application for a Specific ISFSI for the Waste Control Specialists Consolidated Interim Storage Facility for Spent Nuclear Fuel - Revised Review Schedule Project stage: Other ML20015A4512019-08-22022 August 2019 Report No. R1432-01, Acoustical Analysis of ISP Cisf Project stage: Other L-19-099, License Amendment Request to Modify Technical Specifications 3.4.16, RCS Specific Activity, 3.7.13 Secondary Specific Activity, 5.5.7, Ventilation Filter Testing Program (Vftp), and 5.5.14, Control Room Envelope.2019-10-20020 October 2019 License Amendment Request to Modify Technical Specifications 3.4.16, RCS Specific Activity, 3.7.13 Secondary Specific Activity, 5.5.7, Ventilation Filter Testing Program (Vftp), and 5.5.14, Control Room Envelope. Project stage: Request ML19323F4992019-11-19019 November 2019 Acceptance Review for Control Room Envelope Habitability Control LAR (Epids L-2019-LLA-0223) Project stage: Acceptance Review ML20015A4542019-11-30030 November 2019 Socioeconomic Impacts of the Proposed Spent Nuclear Fuel Consolidated Interim Storage Facility, Andrews County, Texas, Revision 5 Project stage: Other ML19357A1762019-12-18018 December 2019 NAC International - Submission of a Request to Renew the U.S. Nuclear Regulatory Commission Certificate of Compliance No. 1025 for the NAC-MPC Cask System Project stage: Request ML19354A7142019-12-20020 December 2019 Approval of Tn America Request for Withholding Information from Public Disclosure for Coc 1029 Renewal Request for Supplemental Information Responses (CAC No. 001028) Project stage: Withholding Request Acceptance ML20002A4422019-12-20020 December 2019 International _Affidavit Project stage: Other ML19360A0472019-12-26026 December 2019 Internationals Application for Specific Independent Spent Fuel Storage Installation License for the Hi-Store Consolidated Interim Storage Facility for Spent Nuclear Fuel - Request for Clarification of Responses Related to Emergency Response Project stage: Approval ML20009D0512020-01-0606 January 2020 Notification of NRC Acceptance of the Standardized Advanced NUHOMS CoC 1029 Renewal Application for Review Project stage: Acceptance Review ML20009D0082020-01-0606 January 2020 Acknowledgement of NRC Receipt of CoC 1025 (NAC-MPC) Renewal Application Project stage: Other ML20015A4522020-01-0606 January 2020 Interim Storage Partners LLC - Submittal of Supplemental Information in Support of RAI, Part 3 - Clarification Related to the Response to RAI AQ-6 Project stage: Supplement ML19354B6372020-01-0707 January 2020 Exemption Request for NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Request for Additional Information Project stage: RAI ML20010D5642020-01-10010 January 2020 Proprietary Determination Letter for HI-STAR 100 CoC Renewal Submittals Project stage: Other ML20028E8462020-01-17017 January 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20028E8452020-01-17017 January 2020 Enclosure 1 - Affidavits Project stage: Other ML20031D0562020-01-29029 January 2020 Interim Storage Partners, LLC - Submittal of ISP Updated Draft Responses for Rals NP-8-1, NP-8-2 and Associated SAR Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20034E8352020-02-0303 February 2020 Letter-Materials Request for Additional Information Clarification with Enclosure Project stage: RAI ML20034E9872020-02-11011 February 2020 Meeting Summary - Meeting with Westinghouse Electric Company, LLC, Pre-Application Amendment No. 5 of Storage CoC No. 1026 for the Fuelsolutions Spent Fuel Management System, November 21, 2019 Project stage: Meeting ML20052D9962020-02-14014 February 2020 Interim Storage Partners, LLC - Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML20052E1542020-02-17017 February 2020 WCS Consolidated Interim Spent Fuel Storage Facility Environmental Report, Revision 3 - Part 2 of 3 Project stage: Other ML20052E1462020-02-17017 February 2020 Interim Storage Partners, LLC - Submittal of Revision 3 of the Environmental Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of NRCs Environmental Review Project stage: Supplement ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support NRCs Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20072N0402020-03-12012 March 2020 Request for Additional Information - Control Envelope Habitability LAR Project stage: RAI ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other 2019-07-01
[Table View] |
|
---|
Category:License-Dry Cask
MONTHYEARML23137A4112023-06-0808 June 2023 Enclosure 1 - Final CoC 1042 Amd 3 ML23027A2142023-04-25025 April 2023 Proposed CoC 1042 Amd 3 ML21244A2972021-09-15015 September 2021 2 Final CoC 1042 Amendment 2 Issued to Tn Americas, LLC ML21125A1052021-08-0303 August 2021 2. Proposed CoC No. 1042 Amendment 2 for Tn Americas, LLC ML21102A2822021-03-31031 March 2021 Enclosure 4 - Proposed Technical Specifications, CoC 1042 Amendment 3, Revision 0 ML21102A2832021-03-31031 March 2021 Enclosure 9 - List of TS and UFSAR Pages Involved in CoC 1042 Amendment 3, Revision 0 ML21102A2862021-03-31031 March 2021 Enclosure 3 - Proposed Certificate of Compliance No. 1042 Amendment 3, Revision 0 Markup ML20190A1392020-06-30030 June 2020 Enclosure 4: List of New CoC 1042 Amendment 2, Revision 5 Technical Specifications Changes and Justifications ML20136A0512020-05-19019 May 2020 Final Tech Specs - Eos Amd 1 ML20136A0502020-05-19019 May 2020 Final CoC - Eos Amd 1 2023-06-08
[Table view] Category:ISFSI
MONTHYEARML23137A4112023-06-0808 June 2023 Enclosure 1 - Final CoC 1042 Amd 3 ML23027A2142023-04-25025 April 2023 Proposed CoC 1042 Amd 3 ML21244A2972021-09-15015 September 2021 2 Final CoC 1042 Amendment 2 Issued to Tn Americas, LLC ML21125A1052021-08-0303 August 2021 2. Proposed CoC No. 1042 Amendment 2 for Tn Americas, LLC ML21102A2822021-03-31031 March 2021 Enclosure 4 - Proposed Technical Specifications, CoC 1042 Amendment 3, Revision 0 ML21102A2832021-03-31031 March 2021 Enclosure 9 - List of TS and UFSAR Pages Involved in CoC 1042 Amendment 3, Revision 0 ML21102A2862021-03-31031 March 2021 Enclosure 3 - Proposed Certificate of Compliance No. 1042 Amendment 3, Revision 0 Markup ML20190A1392020-06-30030 June 2020 Enclosure 4: List of New CoC 1042 Amendment 2, Revision 5 Technical Specifications Changes and Justifications ML20136A0512020-05-19019 May 2020 Final Tech Specs - Eos Amd 1 ML20136A0502020-05-19019 May 2020 Final CoC - Eos Amd 1 2023-06-08
[Table view] Category:(Amend) DKT 72
MONTHYEARML23137A4112023-06-0808 June 2023 Enclosure 1 - Final CoC 1042 Amd 3 ML23027A2142023-04-25025 April 2023 Proposed CoC 1042 Amd 3 ML21244A2972021-09-15015 September 2021 2 Final CoC 1042 Amendment 2 Issued to Tn Americas, LLC ML21125A1052021-08-0303 August 2021 2. Proposed CoC No. 1042 Amendment 2 for Tn Americas, LLC ML21102A2822021-03-31031 March 2021 Enclosure 4 - Proposed Technical Specifications, CoC 1042 Amendment 3, Revision 0 ML21102A2832021-03-31031 March 2021 Enclosure 9 - List of TS and UFSAR Pages Involved in CoC 1042 Amendment 3, Revision 0 ML21102A2862021-03-31031 March 2021 Enclosure 3 - Proposed Certificate of Compliance No. 1042 Amendment 3, Revision 0 Markup ML20190A1392020-06-30030 June 2020 Enclosure 4: List of New CoC 1042 Amendment 2, Revision 5 Technical Specifications Changes and Justifications ML20136A0512020-05-19019 May 2020 Final Tech Specs - Eos Amd 1 ML20136A0502020-05-19019 May 2020 Final CoC - Eos Amd 1 2023-06-08
[Table view] |
Text
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Page 1
of 4
The U.S. Nuclear Regulatory Commission is issuing this Certificate of Compliance pursuant to Title 10 of the Code of Federal Regulations, Part 72, "Licensing Requirements for Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-related Greater than Class C Waste" (10 CFR Part 72). This certificate is issued in accordance with 10 CFR 72.238, certifying that the storage design and contents described below meet the applicable safety standards set forth in 10 CFR Part 72, Subpart L, and on the basis of the final safety analysis report (FSAR) of the cask design. This certificate is conditional upon fulfilling the requirements of 10 CFR Part 72, as applicable, and the conditions specified below.
Certificate No.
Effective Date Expiration Date Docket No.
Amendment No.
Amendment Effective Date Package Identification No.
1042 6/7/2017 6/7/2037 72-1042 2
10/26/2021 USA/72-1042 Issued To: (Name/Address)
TN Americas LLC 7160 Riverwood Drive, Suite 200 Columbia, Maryland 21046 Safety Analysis Report Title TN Americas LLC, Safety Analysis Report for the NUHOMS EOS Horizontal Modular Storage System for Irradiated Nuclear Fuel CONDITIONS This certificate is conditioned upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Technical Specifications), and the conditions specified below:
- 1. CASK:
- a. Model Nos. NUHOMS EOS-37PTH, -89BTH, and 61BTH Type 2 DSCs The two digits refer to the maximum number of fuel assemblies stored in the dry shielded canister (DSC), the character P for pressurized water reactor (PWR) or B for boiling water reactor (BWR) is to designate the type of fuel stored, and T is to designate that the DSC is intended for transportation in a 10 CFR Part 71 approved package. The character H refers to designs that are also qualified for fuel with burnup greater than 45 GWd/MTU.
- b. Description The NUHOMS EOS System is certified as described in the safety analysis report (SAR) and in the NRCs safety evaluation report (SER). The NUHOMS EOS System is a horizontal canister system composed of a steel dry shielded canister (DSC), a reinforced concrete horizontal storage module (HSM), and a transfer cask (TC). The welded DSC provides confinement and criticality control for the storage and transfer of irradiated fuel. The concrete module provides radiation shielding while allowing cooling of the DSC and fuel by natural convection during storage. The TC is used for transferring the DSC from/to the spent fuel pool area to/from the HSM and provides radiation shielding during these operations.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Certificate No.
1042 Amendment No.
2 Page 2
of 4
The principal component subassemblies of the DSC are the shell with bottom cover plates and bottom shield plug, or bottom forging assembly, ram/grapple ring, top shield plug, top cover plates, and basket assembly. The shell is a welded stainless or duplex steel sealed container with a length that is fuel-specific. The internal basket assembly for the EOS-37PTH and EOS-89BTH DSCs is composed of interlocking slotted plates to form an egg-crate like structure that forms a grid of fuel compartments to house the fuel assemblies. The grid structure is composed of one or more of the following: a steel plate, an aluminum plate and a neutron absorber plate. Basket transition rails, made of aluminum, provide the interface between the rectangular basket structure and the cylindrical DSC shell. The DSC is designed to hold either 37 PWR or 89 BWR fuel assemblies.
The 61BTH Type 2 DSC consists of the DSC shell assembly (cylindrical shell, canister bottom and top cover plates and shield plug assemblies) and a basket assembly. Top grid assemblies have been provided to accommodate hoist ring designs. The transition rails support the fuel assemblies and transfer mechanical loads to the DSC shell. The DSC is designated to hold up to 61 BWR fuel assemblies.
Different DSC basket configurations are provided for the EOS-37PTH DSC, with poison plates containing a borated metal matrix composite (MMC) at differing B-10 concentrations. The EOS-89BTH DSC has basket configurations that differ in the material used for the poison plates, either borated MMC or Boral, and the concentration of B-10 used.
The 61BTH Type 2 DSC is designated to use one of three types of poison materials in the basket:
Borated Aluminum alloy, Boron Carbide/Aluminum MMC or Boral.
The basket assembly aids in the insertion of the fuel assemblies, enhances subcriticality during loading operations, and provides structural support during a hypothetical drop accident. The DSC is designed to slide from the transfer cask into the HSM and back.
The HSM is a reinforced concrete unit and is designed to store DSCs with up to 50.0 kW decay heat.
The HSM has variable lengths to accommodate the range of DSC lengths. There are multiple versions of the HSM, the NUHOMS EOS-HSM (EOS-HSM) and the NUHOMS MATRIX HSM (HSM-MX).
When used without distinction, the term HSM refers to the EOS-HSM as well as the HSM-MX.
Because they are geometrically the same design overall, the term EOS-HSM refers to a single module for storage of a single DSC as a single unit (EOS-HSM) or as a split base unit (EOS-HSMS). Only the fabrication details differ. The HSM-MX is an alternate design with a two-tiered, staggered, high-density module, which contains multiple compartments to accommodate multiple DSCs.
The TC is designed and fabricated as a lifting device to meet NUREG-0612 and ANSI N14.6 requirements. It is used for transfer operations within the spent fuel pool area and for transfer operations to/from the HSM. The TC is a multi-walled cylindrical vessel, comprised of a gamma shield and neutron shield layers with a bottom end closure assembly and a bolted top cover plate. There are multiple versions of the TC. The EOS-TC system consists of the EOS-TC135 cask, the EOS-TC125 cask, and the EOS-TC108 cask. The EOS-TC108 is designed with a removable neutron shield for use at nuclear plant sites with space limitations and/or crane capacity limits. Two upper lifting trunnions are located near the top of the cask for downending/uprighting and lifting of the cask in the spent fuel pool area. The lower trunnions, located near the base of the cask, serve as the axis of rotation during downending/uprighting operations and as supports during transfer to/from the independent spent fuel storage installation (ISFSI).
The OS197 transfer cask is used to transfer the 61BTH Type 2 DSC to the HSM-MX. The OS197 includes the OS197H and OS197FC-B variants as described in the TS. The maximum loaded weight for the OS197 TCs and OS197H TCs is 110 tons and 125 tons, respectively.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Certificate No.
1042 Amendment No.
2 Page 3
of 4
With the exception of the TC, fuel transfer and auxiliary equipment necessary for ISFSI operations are not included as part of the NUHOMS EOS System referenced in this certificate of compliance (CoC).
Such site-specific equipment may include, but is not limited to, special lifting devices, the transfer trailer, and the skid positioning system.
c.
Drawings The drawings for the NUHOMS EOS System are contained in Section 1.3, Section A.1.3, and Section B.1.3 of the SAR.
d.
Principal Components The principal components of the NUHOMS EOS System that are important to safety are the DSC, HSM, and TC. These components are described in Section 2.1, Section A.2.1, and Section B.2.1 of the SAR.
- 2. OPERATING PROCEDURES Written operating procedures shall be prepared for handling, loading, movement, surveillance and maintenance. The users site-specific written operating procedures shall be consistent with the technical basis described in Chapter 9, Chapter A.9, and Chapter B.9 of the SAR.
- 3. ACCEPTANCE TESTS AND MAINTENANCE PROGRAM Written cask acceptance tests and maintenance program shall be prepared consistent with the technical basis described in Chapter 10, Chapter A.10, and Chapter B.10 of the SAR.
- 4. QUALITY ASSURANCE Activities in the areas of design, purchase, fabrication, assembly, inspection, testing, operation, maintenance, repair, modification of structures, systems and components, and decommissioning shall be conducted in accordance with a quality assurance program that satisfies the applicable requirements of 10 CFR Part 72, Subpart G, and that is established, maintained, and executed with regard to the cask system.
- 5. HEAVY LOADS REQUIREMENTS Each lift of a DSC and TC must be made in accordance with the existing heavy loads requirements and procedures of the licensed facility at which the lift is made. A plant-specific safety review (under 10 CFR 50.59 or 10 CFR 72.48, if applicable) is required to show operational compliance with NUREG-0612 and or existing plant-specific heavy loads requirements.
If a single failure proof crane is not used, the licensee must evaluate the accidental drop of the shielding components of the TC under 10 CFR 50.59, 10 CFR 72.48, and 10 CFR 72.212, and evaluate the consequences of the accident drops.
- 6. APPROVED CONTENTS Contents of the NUHOMS EOS System must meet the fuel specifications in Appendix A (Technical Specifications).
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Certificate No.
1042 Amendment No.
2 Page 4
of 4
- 7. DESIGN FEATURES Features or characteristics for the site, or cask system must be in accordance with Appendix A (Technical Specifications).
- 8. CHANGES TO THE CERTIFICATE OF COMPLIANCE The holder of this certificate who desires to change the certificate or technical specifications shall submit an application for amendment of the certificate or technical specifications.
- 9. PRE-OPERATIONAL TESTING AND TRAINING EXERCISE A dry run training exercise of the loading, closure, handling, unloading and transfer of the NUHOMS EOS System shall be conducted by each licensee prior to the first use of the system to load spent nuclear fuel assemblies. The training exercise shall not be conducted with spent nuclear fuel in the canister. The dry run may be performed in an alternate step sequence from the actual procedural guidelines in Chapter 9, Chapter A.9, and Chapter B.9 of the SAR. The dry run shall include, but need not be limited to the following:
Loading Operations a.
Fuel loading b.
DSC sealing, drying and backfilling operations c.
TC downending and transfer to the ISFSI d.
DSC transfer to the HSM Unloading Operations e.
DSC retrieval from the HSM f.
Opening of the DSC g.
Flooding of the DSC Any of the above steps can be omitted if the site has already successfully loaded a NUHOMS EOS System or another NUHOMS system.
- 10. AUTHORIZATION The NUHOMS EOS System, which is authorized by this certificate, is hereby approved for general use by holders of 10 CFR Part 50 licenses for nuclear reactors at reactor sites under the general license issued pursuant to 10 CFR 72.210, subject to the conditions specified by 10 CFR 72.212, this certificate, and the attached Appendix A.
FOR THE NUCLEAR REGULATORY COMMISSION John McKirgan, Chief Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
Attachment:
Appendix A. Technical Specifications Dated: September 15, 2021 John B.
McKirgan Digitally signed by John B.
McKirgan Date: 2021.09.15 15:38:07
-04'00'