EPID:2019
From kanterella
Jump to navigation
Jump to search
EPID - 2019, CoC 1042 Eos A2 Issuance Package to Tn (Open) 12 March 2019 - 15 September 2021 | |
|---|---|
Request for: - Open | |
Initiation
Results
Other: ML19205A540, ML19231A209, ML21244A296, ML21244A297, ML21244A298, ML21244A299 | |
| From: | |
MONTHYEARML19067A0482019-03-12012 March 2019
[table view]Title: Summary of Public Teleconference with Indiana Michigan Power Co. (I&M) Review of LAR for Approval of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (EPID-2019-LLA-0054) ML19205A5402019-07-24024 July 2019 Title: NRR E-mail Capture - Waterford 3 - Documentation of Verbal Authorization to ASME Code Case N-666-1 for Weld Overlay Repair at Waterford 3 (EPID 2019-LLR-0066) ML19231A2092019-08-23023 August 2019 Title: Nuclear Regulatory Commission Vendor Inspection Report of KHNP Washington, Dc. 05200046/2019201 ML20072N0402020-03-12012 March 2020 Title: Request for Additional Information - Control Envelope Habitability LAR ML21244A2992021-09-15015 September 2021 Title: 4 NUHOMS_EOS_Amd_2_FSER ML21244A2952021-09-15015 September 2021 Title: CoC 1042 Eos A2 Issuance Package to Tn ML21244A2982021-09-15015 September 2021 Title: 3 Final Tech Specs - CoC 1042 Amd 2 Rev 7 ML21244A2972021-09-15015 September 2021 Title: 2 Final CoC 1042 Amendment 2 Issued to Tn Americas, LLC ML21244A2962021-09-15015 September 2021 Title: 1 Issuance Letter_For Tn Americas, LLC CoC No. 1042 for Amendment 2 for NUHOMS Eos System 2019-08-23 | |
Retrieved from "https://kanterella.com/w/index.php?title=EPID:2019&oldid=5459064"