ML20190A139

From kanterella
Jump to navigation Jump to search
Enclosure 4: List of New CoC 1042 Amendment 2, Revision 5 Technical Specifications Changes and Justifications
ML20190A139
Person / Time
Site: 07201042
Issue date: 06/30/2020
From:
TN Americas LLC
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML20190A135 List:
References
E-56684
Download: ML20190A139 (1)


Text

Enclosure 4 to E-56684 List of New CoC 1042 Amendment 2, Revision 5 Technical Specifications Changes and Justifications Page 1 of 1 Changed Technical Specifications (TS) Area and Page Number Justification Table of Contents, List of Tables, and List of Figures Updated 2.1 (CONTROL COMPONENTS (CCs))

Page 2-3 As described in Enclosure 12, Item 1, the CONTROL COMPONENT (CCs) section has been revised.

3.1.3 (LCO 3.1.3)

(Page 3-7)

As described in the response to Thermal RAI 4-7, the time limits for the 61BTH Type 2 DSC model for Applicable HLZCs 5, 6, or 8 and for Applicable HLZCs 7 or 10 have been revised.

3.1.3 (ACTIONS)

(Page 3-8)

As described in the response to Thermal RAI 4-7, note number 1 has been revised and note 2 has been added.

5.1.2 (Radiation Protection Program)

(Page 5-1)

As described in Enclosure 12, Item 1, TS 5.1.2.a.3 has been revised.

5.1.2 (Radiation Protection Program)

(Page 5-2)

As described in the response to Operating Procedures RAI 9-1, TS 5.1.2c,i has been revised.

5.1.2 (Radiation Protection Program)

(Page 5-3)

As described in the response to Thermal RAI 4-8, TS 5.1.2(g) has been deleted.

Table 3 (Page T-1)

As described in Enclosure 12, Item 1, Table 3 has been deleted from the TS and added to the UFSAR in Chapter 6 as Table 37a.

Table 13 (Page T-14)

As described in the response to Shielding RAI 6-3, note 3 has been revised.