Forwards Safety Insp Rept 50-454/86-40 on 861001-31 & Forwards Notice of Violation.Discussion of Actions Taken to Restore Quality Level of Affected Battery Charger & Testing Performed Requested.W/O Notice of Violation
ML20214S966
Person / Time
Site: Byron Constellation icon.png
Issue date: 11/25/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20214S969 List:
References
NUDOCS 8612080437
Download: ML20214S966 (2)


See also: IR 05000454/1986040

Text

'

g p e

O

<

nov 25 GM

Docket No. 50-454

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. M. Hinds

Jr., P. G. Brochman, R. M. Lerch, H. A. Walker, and Ms. J. A. Malloy of this

office on October 1 - October 31, 1986, of activities at Byron Station Unit 1,

authorized by NRC Operating License No. NPF-37 and to the discussion of our

findings with Mr. R. E. Querio and others of your staff at the conclusion of [

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required. In your response to violation number 1, you are specifically

requested to discuss the actions you have taken to restore the quality level

of the affected battery charger and the testing performed to verify that no

degradation of its performance has occurred.

Additionally, it is our understanding that your staff has committed to the

actions as described below regarding three unresolved items discussed in the

report.

For the unresolved item concerning performance testing of Essential Service

Water Booster Pump ISX04P, as discussed in paragraph 4 of the report, you

have agreed to perform testing, as practicable, as described in IE Bulletin

83-05 and submit a supplemental response within 30 days of the completion

of testing.

Regarding the two unresolved items concerning the potential loss of

recirculation capability for both Auxiliary Feedwater pumps, should valve

1AF024 fail to open, as discussed in Paragraph 9 of the report, we understand

&#$$

a

0 * Y

9

i

_ _ _ .

,.,

..

-

Commonwealth Edison Company 2 NOV 2 51986

that you have agreed to provide an engineering analysis of the minimum

recirculation / flow cooling requirements during pump operation that are

necessary to prevent failure of the Auxiliary Feedwater pumps within 15

days of your receipt of this report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Charles E. Norelius, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-454/86040(DRP)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, 0GC

L. Olshan, NRR LPM