Forwards Insp Rept 50-382/87-24 on 871016-1115.No Violations Noted.Status of Examined Actions from Previous Insp Findings Found in Paragraph 6 of Encl Rept
ML20236Y246
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/08/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20236Y249 List:
References
NUDOCS 8712110197
Download: ML20236Y246 (2)


See also: IR 05000382/1987024

Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _

l

.) ,

In Reply Refer To: .

Docket: 50-382/87-24 DEC 8 1987

Louisiana Power & Light Company

ATTN: J. G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Gentlemen:

This refers to the inspection conducted by Messrs. W. F. S:nith and T. R. Staker

of this office during the period October 16 through November 15, 1987, of

activities authorized by NRC Operating License NPF-38 for the Waterford Steam

Electric Station, Unit 3, and to the discussion of our findings with Mr. N. S. l

Carns and other members of your staff at the conclusion of the inspection. I

Areas examined during the inspection included onsite followup of events,

operational safety verification, monthly maintenance observation, monthly

surveillance observation, followup of previously identified items, licensee

event report followup, and plant status. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations were identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 6 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

L. J. Callan

L. J. Callan, Director

Reactor Projects Division

E su re: (see next >)

I : ,1 . SRI  : D/A D:DR

Staker JPJaudon LJCallan i

'h iS'ith /1/87 ')/87 (2/7 /87

. P/1/87  :

!

gu221865i Bla8ljp g/

Q

__- . _ _ _ _ _ _ _ _ _

f - B

Louisians Power & Light Company -2-

Enclosure:

Appendix - NRC Inspection Report

50-382/87-24

cc w/ enclosures:

Louisiana Power & Light Company

ATTN: N. S. Carns, Plant Manager

P.O. Box B

Killona,. Louisiana 70066

Louisiana Power & Light Company

ATTN: K. W. Cook, Manager

Nuclear Safety & Regulatory Affairs

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Power & Light Company

ATTN: G. E. Wuller, Onsite ,

Licensing Coordinator  !

P.O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally

P.O. Box 6100

New Orleans, Louisiana 70161

Louisiana Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RRI R. D. Martin, RA
  • Section Chief (DRP/A) *DRP

RPSB-DRSS * MIS System

  • Project Engineer, DRP/A *RSTS Operator
  • RIV File ^J. Wilscq, NRR Project Manager ,
  • R. Hall *DRS l
  • TSS *Lisa Shea, RM/ALF l

D. Powers

  • w/766

l

l

_ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . . _ _ . _ _ _ _