ML20213G053

From kanterella
Revision as of 00:18, 20 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Description of QA Program for Design & Const Submitted on 861016 Continues to Satisfy Requirements of 10CFR50,App B & Acceptable
ML20213G053
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/14/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8611170301
Download: ML20213G053 (2)


Text

-

1

.9 NOV 141986 Washington Public Power Supply System Box 1223 Elma, Washington 98541-1223 Attention: Mr. G. C..Sorensen, Manager Regulatory Programs Gentlemen:

Subject:

QUALITY ASSURANCE PROGRAM DESCRIPTION FOR NUCLEAR PROJECT 3

~

By letter dated October 16, 1986 (G. C. Sorensen to J. B. Martin) the Washington

~

Public Power Supply System submitted the current description of the QA' Program for Design and . Construction of Nuclear Project 3 (WNP-3) .

Based on our evaluation of the changes introducted by SCN's 740, 778, 784 and 788 to Amendment 6, we find that the QA Program description for the design-and construction of WNP-3 continues to satisfy the requirements of Appendix B to 10 CFR Part 50 and is therefore acceptable.

Should you have any questions regarding our review, please contact W. J.. Wagner at (415) 943-3731.

Sincerely, 4.ChoNes per - Dennis F. Kirsch, Director Division of Reactor Safety and Projects cc:

C. W. Knighton, NRR W. O. Belke, QUAB Section Chiefs Branch Chiefs W. JMqeNDesQ RV/jk WAGNER RICHARDS PARTE KIRSCH 11//f /86 11//f/86 11/N/86 11/17/86

/

p .

8611170301 861114 \

PDR ADOCK 05000397 P PDR t

e p KfGo

.- 4 UNITED STATES

!"  % NUCLEAR REGULATORY COMMISSION

{ a$

g REGION V 1450 MARIA LANE, SUITE 210 o,

5 oU WALNUT CREEK, CALIFORNI A 94596 NOV 141986 Washington Public Power Supply System Box 1223 Elma, Washington 98541-1223 Attention: Mr. G. C. Sorensen, Manager Regulatory Programs Gentlemen:

Subject:

QUALITY ASSURANCE PROGRAM DESCRIPTION FOR NUCLEAR PROJECT 3 By letter dated.0ctober 16, 1986 (G. C. Sorensen to J. B. Martin) the Washington Public Power Supply System simbmitted the current description of the QA Program for Design and Construction of Nuclear Project 3 (WNP-3).

Based on our evaluation of the changes introducted by SCN's 740, 778, 784 and 788 to Amendment 6, we find that the QA Program description forf the design and construction of WNP-3 continues to satisfy the requirements of Appendix B to 10 CFR Part 50 and is therefore acceptable.

Should you have any questions regarding our review, please' contact W. J. Wagner at (415) 943-3731.

Sincerely,

< i c' Dennis F. Kirsch, Director Division of Reactor Safety and Projects

~.

l

! 'g cc:

l C. W. Knighton, NRR l '

W. O. Belke, QUAB l

Section Chiefs Branch Chiefs .

Document Control Desk 9

o l'

l I