Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions
ML20204F026
Person / Time
Site: Columbia 
Issue date: 03/19/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20204F032 List:
References
50-397-99-01, 50-397-99-1, NUDOCS 9903250203
Download: ML20204F026 (5)


See also: IR 05000397/1999001

Text

-

_

- _.

-

-- -

- . - _ _ _ _ .

.

A"'%,k

J

UNITED STATES

NUCLEAR REGULATORY COMMISSION

3

'

u

p,

5

e

REGloN IV

611 RYAN PLAZA DRIVE, SulTE 400

,,g,

ARLINGTON, TEXAS 76011-8064

MAR 191999

,

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington 99352-0 % 8

SUBJECT: NRC INSPECTION REPORT 50-397/99-01

Dear Mr. Parrish:

From February 1-4,1999, an NRC inspection was conducted at your Washington Nuclear

Project-2 reactor facility. The enclosed report presents the scope and results of that inspection.

'

Additionally, telephonic conversations were held on March 3-5,1999, between Ms. G. Good of

this office and Messrs. J. Mcdonald and D. Coleman of your staff.

Areas examined during this inspection included portions of your physical security program. We

determined that those areas inspected were being effectively implemented with the following

exception,

j

l

During the inspection, we determined that your staffing of armed response personnel inside the

protected area was in accordance with the minimum requirements of the physical security plan.

During the September 21-24,1998, Operational Safeguards Response Evaluation (OSRE), you

exceeded the minimum requirements of the physical security plan and elected to utilize five

additional armed response personnel to successfully demonstrate your ability to defend against

the design bas;s threat. The requirement to defend against the design basis threat is

addressed in 10 CFR 73.55(a). The results of your OSRE were documented in NRC Inspection

Report 50-397/98-201 dated December 9,1998.

To meet the design basis threat during your OSRE, all of your armed reeponse personnel were

positioned at, specific locations inside the protected area. However, following the OSRE, you

frequently rc.ocated some of these armed response personnel to other locations inside the

protected area. The relocation of armed response personnel may have invalidated response

times to both the cont lngency weapons and to plant equipment target sets, as discussed in

Section S6.2 of this report.

\\

Subsequent to your September 1998 OSRE, you have maintained an appropriate number of

f

on-duty armed security personnelinside the protected area. However, as discussed during the

l

above telephone conversations, we noted that there is a difference between the number of

armed responders described in the physical security plan and the number of armed response

personnel used during the September 1998 OSRE to demonstrate your ability to defend against

the design basis threat, as discussed in Section S6.2 of this report.

9903250203 990319

DR

ADOCK 050

397

i

. _ - _ _ _ _ . . _ _ . . . _ . . _ _ _ _ _ _ _ . . _ . _ . _ _ . _ . _ _ _ _ _

-_ .-. - _ ._._ ._

.

.

'

Washington Public Power Supply System

-2-

Given the preceding discussion, we request that you provide us with an evaluation of your

provisions to maintain an adequate level of security within 30 days of the report date. Your

evaluation should not include safeguards information.

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR)."

B

Should you have any questions or comments concerning this inspection, we will be pleased to

discuss them with you.

Si erely,

. M-

Y

'

Geil M. Good, Chief,

Plant Support Branch

Division of Reactor Safety

Docket No.: 50-397-

License No.: NPF-21

Enclosure:

.

NRC Inspection Report No.

50-397/99-01

cc:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington 98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support /PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington 99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

' P.O. Box 968

Richland, Washington 99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

.P.O. Box 968 -

Richland, Washington 99352-0968

.

arm.--\\--

mg

-m

~g-w

--,-,


,

--

n

., --

a

.,m-

--re--

-- ,

.

. _ .

. _

.._ _._ ._..

.

_ __

__ .

- - _ _ . . _ _ _

_ _ . .

-_ . _

.

,.

Washington Public Power Supply System

-3-

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington 99352 0968

Mr. Paul inserra (Mall Drop PE20)

Manager, Licensing

Washington Public Power Supply System

-

P.O. Box 968

Richland, Washington 99352-0968

Perry D. Robinson, Esq.

Winston & Strawn

1400 L Street, N.W.

Washington, D.('. 20005-3502

,

i

i

w

y

-

w <

=

v

-

,

_

_

__

.

. . _ .

.

.

_ __

_

.

_

t

.

l

Washington Public Power Supply System

-4-

E-Mail - T. Frye (TJF)

l

E-Mail - D. J. Lange (DJL)

l

E-Mail- NRR Event Tracking System (IPAS)

l

E-Mail- Document Control Desk (DOCDESK):

bec to DCD (IE04)

bec distrib by RIV:

Regional Administrator

DRS Director

DRP Director

l

WNP-2 Resident inspector

Branch Chief (DRP/WNP-2/WCFO)

Senior Project Engineer (DRP/WNP-2/WCFO)

Branch Chief (DRP/TSS)

Branch Chief, DRS/PSB

R. Wise, ACES

MIS System

,

RIV File

Ellen Poteat, OCFO/LFARB (MS TWFN 9310)

!

Elaine Koup, NRR/DRPM/PSGB, (MS 012-E11)

!

R. Rosano, NRR/DRPM/PSGB, (MS 012 E11)

D. Orrik, NRR/DRPM/PSGB, (MS 012-E11)

RIV Docket File

DRS/PSB Security File (Hodges)

Security inspectors (Dexter and Schaefer)

l

DOCUMENT NAME: R:\\__WN2\\WN901RP.TWD

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

Peer Review

RIV: PSB

C:DRS/PSB l

C:DRP/F l

NRR:TSGB

.- v

l

  • DWSchaefer
  • TWDexter: nh
  • GMGood
  • LJSmith

RPRosano G'N hp

02/ 22 /99

02/22 /99

03/ 01 /99

03/ 01 /99

03/ Q /99

I

MS

l

ATHow W _/C:DRS/PSB

GMGood (M

l

03// /99 N 03/ff/9bt.,

~

  • Freviously concurred.

l'!

OFFICIAL RECORD COPY

!

_.

-

.

.

.

- -

-. -.

.- _

.

_.

l

.

Washington Public Power Supply System

-4-

l

E-Mail - T. Frye (TJF)

l

E-Mail - D. J. Lange (DJL)

l

E-Mail- NRR Event Tracking System (IPAS)

E Mail- Document Control Desk (DOCDESK):

bec to DOD (IE04)

bec distrib by RIV:

Regional Administrator

DRS Director

DRP Director

WNP-2 Resident inspector

Branch Chief (DRP/WNP-2/WCFO)

Senior Project Engineer (DRP/WNP-2/WCFO)

Branch Chief (DRP/TSS)

Branch Chief, DRS/PSB

R. Wise, ACES

MIS System

'

RIV File

Ellen Poteat, OCFO/LFARB (MS TWFN 9310)

Elaine Koup, NRR/DRPM/PSGB, (MS 012-E11)

R. Rosano, NRR/DRPM/PSGB, (MS 012-E11)

,

!

D. Orrik, NRR/DRPM/PSGB, (MS 012-E11)

RIV Docket File

DRS/PSB Security File (Hodges)

Security inspectors (Dexter and Schaefer)

DOCUMENT NAME: R:\\__WN2\\WN901 RP.TWD

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E* = Copy with enclosures "N" = No copy

NRR:TSGB l Y

hp

]

Peer Review

l

RIV: PSB

l

C:DRS/PSB

C:DRP/F l

.o

RPRosano G

  • DWSchaefer
  • TWDexter; nh
  • GMGood
  • LJSmith

o

g

02/ 22 /99

02/22 /99

03/ 01 /99

03/01 /99

03/ 4 /99

1

tPOES

/~C:DRS/PSB

ATHow W

GMGood ( W

l

03// ' /99 N 03/f/9hi

Treviously concurred.

19

OFFICIAL RECORD COPY

'

i

t

l

250004