r
'
c :.
f~
"49' t '
NUCLEAR REGULATORY COMMISSIOh!-
, p*
UNITE 3 $TATES '
= i-
,
i
l'
RecioN IV :
' ' '
611 RY AN PLAZA DRIVE, tVITE 400
,-4
- 9*****/
- -
AR LINGTON. T E XAf 3011 8064
._
hnuary 7,1998
Mr. J. V. Parrish (Mail Drop 1023)
-
Chief Executive Officer.
Washington Public Power Supply System
P.O. Box 968 -
,
Richland, Washington 99352-0968
SUBJECT: NRC INSPECTION REPOR14397/97-07
Dear Mr. Parrishi
'
Thank you for your le' tor of December 17,1997, in response to our letter and Notice of
Violation dated November 18,1997 L We have reviewed your reply and find it responsive to the
concems raised in our Notice of Violation. We will review the implerV'tation of your corrective
actions during a future inspection to determine that full compliance has been achieved and will
be maintained.
Sincerely,.
r
_
'
Blaine Murray, Chief
Plant Support Branch
Division of Reactor Safety
Docket No.: 50-397
License No.: NPF-21
cc:
- Chairman-
Energy Facility Site Evaluation Council
- P.O. Box 43172
Olympia, Washington 98504-3172-
k
I
Mr. Rodney L. Webring (Mall Drop PE08)
Vice President, Operations Support /PIO -
Washington Public Power Supply System
P.O. Box 968
' Richland, Washington 99352-0968
9001140147 996107
PDR- ADOCK 05000397
ElElBRRun
""
.
..
'
'"
- ,
-
p
,
'
.
i
i Washington Public Pour Supply System -
-2 t
,
Mr. Greg O. Smith (Mail Drop 927M)
.
- WNP-2 Plant General Manager.
j
Washington Public Power Supply System-
l
P.O. Box 968
Richland, Washington 99352-0968
Mr. Dav,d A. Swank (Mail Drop PE20)--
Manager, Regulatory Affal s
Washington Public Power booty F,ystem
"
P.O. Box 968
,
Richland, Washington 99352 3968
Mr. Albert E. Mouncer (Mail Orop 396)-
Chief Counsel
-
Washington Public Power Supply System
~ P.O. Box 968
. Richland, Washington 99352 0968
f
Mr. Paulinserra (Mall Drop PE20)
Menager, Licensing
_
Washington Public Power Supply System
P.O. Box 968 ~
Richland, Washington 99352-0968
'
Perry D. Robinson, Esq.
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
1
.
.
-
~ . . -
-: , _ .
. ;w
,e
,
. - . .
,-
. . . ~
.
.
. . . ~ . . - - .
.- --.
...
T.
. npy
W?*w
.a
Oya
E.
< t,gp
gi
, ' '
.;
g-
, ,c
y
, -
2r:
.,
..
.'
+
_
',
-t
.3,
,-e
,
3
,
}-
[ Washington Public Power Supply System ' -3r
_
3
'
~
-
-
.
DISTR:BUTION w/ copy W iicannee's lottar dated December 17.1997:1
t
_
1
-
lDMB (IE04)
-
- Regional Aoministrator?
.
- ST Resident inspector <
-
,
< DRS Director :' .
- -
_;
'
l DRS Deputy Director _;
' "
4
' DRP Director
_
1
m
_ ..
!
- DRS-PSB
!
=*
. Senior Project inspector (CRP/E, WCFO).
j
Branch Chief (DRP/E, WCFO) . . . .
i
Branch Chief (DRP/TSS)'
,
M. Hammond (PAO, WCFO) -
'j
-
WCFO File'
,
J MIS System?
1
' RIV File :
-
p Al File (97-G-0139T:
'
_ <
- --
- j
,
,
-
.
't
-
'
-
-
.
4
'
I
>
4
-7
x
d
.
I
e
DOCUMENT NAME:t G:\\DRSLTRS\\WN707AK.TWD
}-
- To resolve espy of desement,lessete le hen:"C" . Copy ethout endesses T = Copy with ancieswes "N" - No copy
j
'
RIV:PSB'-
C:DRS\\PSR
i
-
TWDexter:nh f/sg
BMurray 3
'
01//r/98
-L:
01/J/198 =
-
-
'
,
!
_
h . OFFICIAL RECORD COPY -
'
'
r_
-
..
_
_
L'
n 2 -
-
. .
-s
. . - - . - , , , _ . - -
- - .
m.-
.~ ,. -'.. .- .. . - . -~-
..
f m.-
- . . , _ . -
,4
.-,-.
.
O
Washington Public Power Supply System
3-
QlEIRIBUTION w/coov of licensee's letter dated December 17 'i997*
DMB (IE04)
Regional Administrator
ST Resident inspector
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
Branen Chief (DRP/E, WCFO)
Senior Project inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
M Hammond (PAO, WCFO)
WCFO File
MIS System
RIV File
Al File (97-G-0139)
, DOCUMENT NAME: G:\\DRSLTRS\\WN707AK.TWD
Te receive copy of documeat,ladicatele bar:'C' = Copy ethout enckistres *E* * Copy eth enclowes *N* . No copy
RIV:PSB
.
C:DRS\\PSR
TWDexter:nh //4g) BMurray Y
_.
01//fl98
/
01/ //98
,.
'
OFFICIAL RECORD COPY
_
-
--
- .
-,
-f
-
-
~
'\\
/
WASil!NGTON PUllLIC POWER SUPPLY SYSTEM
itO. Box 968 * Skhlattd, Washirrstort 99352-o908
.
,
,
.
December 17,1997
W ~V -
'O/ O bc-l.
i4
Docket No. 50-397
t!Uj DEC 2 9 b
1
,
L .
_._
f
U.S. Nuclear Regulatory Commission -
REGiONIV
'~
Document Control Desk
~~~~~
-
Washington,- DC 20555
Gentlemen:
Gubject:-
WNP-2, OPERATING LICENSE NPF-21,
NRC INSPECTION REPORT 54397/97-07, RESPONSE
References:
1) Letter dated November 18, 1997, Blaine Murray (NRC) to JV Parrish
(SS), "NRC Inspection Report 50-397/97-07 and Notice of Violation"
2) Letter dated October 25,1994, JW Clifford (NRC) to JV Parrish (SS),
" Summary of Regional Workshops on Malevolent Use of Vehicles at
Nuclear Power Reactors"
The Supply System's response to the referenced Notice of Violation, pursuant to the pmvisions of
Section 2.201, Title 10, Code of Federal Regulations, is enclosed as Attachment A. The material
enclosed herewith contains no Safeguards Information as dermed by 10 CFR 73.21.
Should you have any questions or desire additional information regarding this matter, phse call
Mr. PJ Insena at (509) 377-4147.
Respectful
o
}
PR Acm15
Vice President, Nuclear Operations
Mail Drop PE23
Attachment
cc: EW Merschoff- NRC RIV
NRC Sr. Resident Inspector - 927N
KE Perkins, Jr. - NRC RIV, WCFO
DL Williams - BPA/399
C Poslusny, Jr. - NRR
PD Robinson - Winston & Strawn
k-J' d ; lc 3:C
5fl'
j
,1
.
'k
NkC INSPECTION REPORT P7-07, RESPONSE'ID NOTICE OF VIOLATION -
L'
Attachment A
[
.Page 1 of 2.
.
~
. p emeament of Vialeian
Vehicle Barrier System
10 CFR 73.55(c)(7) requires that licensees establish vehicle control measures to protect against the
use of a land vehicle as a means to gain unauthorized proximity to vital areas.
.
Paragraph 4.2.4 of the licensee's Physical Security Plan requires that the licensee install a vehicle
barrier system to meet the requirtsnents of 10 CFR 73.55(c)(7). .
Contrary to the above, on October 21,1997, the inspector identified a gap in the vehicle barrier
system that pmvided a path for a design basis vehicle to gain unauthorized proximity to vital areas.
This is a Severity Level IV violation (Supplement IU) (397/9707-01)
Resnonse to Violation
,
'Ihe Supply System accepts the violation.
Benmn for Violation
The Supply System agrees with the staff's characterization of this event as given in the Violation
and Report Details of Reference 1.
The failure to meet the regulatory requirements for vehicle barriers was caused by a gap in the
existing vehicle barrier system. The gap was caused by an existing building that was being
used as a part of the vehicle barrier system. During the design phase of the vehicle barrier
>
- system the building was evaluated and found to meet specific structural criteria as provided in
response to question 20 of Reference 2). The criteria for the use of buildings as part of a
vehicle barrier did not, however, address all of the design issues.
During the structural
evaluation of the building, the doors and internal pathways that could provide an entry point
for design basis vehicles were not considered. The failure of the Supply System to consider
doors and internal pathways was caused by narrowly focusing on the structural criteria for
buildings, and not the general requirement to stop a design basis vehicle.
Corrective Actions Taken and Results Achieved
Compensatory measures were immediately employed to ensure the integrity of the vehicle
barrier system. Subsequently, double concrete Jersey highway barriers were placed in the area
of vulnerability to meet the vehicle barrier requirements of 10 CFR 73.55(c)(7).
,- .
-
.-
-
-
,
NRC INSPECTION REPORT 97 07, RESPONSE 'ID NOTICE OF VIOLATION
Attachment A =
-
l
Page 2 of 2,
Additionally, other buildings credited as vehicle barriers were reevaluated to determine if any
door or internal pathway . vulnerability to a design basis vehicle penetration existed. The
review did not identify any additional discrepancies.
Conective Stem 'Ihat Will Be Taken to Avoid Further Violatians -
No other corrective steps are necessary.
Date When Full Compliance was Achieved
Full compliance was achieved on October 24,1997, when double concrete Jersey highway .
barriers were placed in the area of vulnerability to meet the vehicle barrier requirements of
.-
-
. .