ML20203B097
| ML20203B097 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/02/1986 |
| From: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20203B101 | List: |
| References | |
| NUDOCS 8607180016 | |
| Download: ML20203B097 (2) | |
See also: IR 05000397/1986003
Text
.
JUL 021986
Docket No. 50-397
Washington Public Power Supply System
P. O. Box 968
3000 George Washington Way
Richland, Washington 99352
Attention:
Mr. D. W. Mazur
Managing Director
Centlemen:
Subject: Systematic Asnessment of Licensee Perforinance (SALP)
The NRC Systematic Assessment of Licensee Performance (SALP) Board has
completed its periodic evaluation of the performance of your WNP-2 facility
during the period February 1, 1985 throrgh January 31, 1986.
l
The performance of your WNP-2 facility was evaluated in the functional areas
of plant operatioro, radiological controls, maintenance, surveillance, fire
protection, emergen::y preparedness, security, outages, qetality programs and
administrative controls, licensing activities, and training. The criteria
used in conducting this assessment and the SALP Board's evaluation of your
performance in these functional areas are contained in the enclosed SALP
report.
A management meeting to discuss the results of the SALP Board's assessment is
not a requirement, but may be held as a public meeting at the discretion of
the licensee or NRC. We are not requesting a meeting to discuss the results
of this SALP assessment; however, we would be pleased to meet with you if you
should so request. Please contact this office within ten days at the date of
this letter if you wish to request a management meeting.
Overall, the SALP Board found your performance to be acceptable and directed
toward safe facility operation. Certain strengths and weaknesses werc
identified, as discussed in Section III, Summary of Results, and Section IV,
Performance Analysis.
Board recommendations related to the various functional
areas are provided in the enclosed SALP report.
An NRC inspection conducted subsequent to the close of the SALP evaluation
period identified several weaknesses in your implementation of 10 CFR 50,
Apper. dix R requirements and ummitments.
You are urged to increase your
attention to this important area.
D607100016 G6070"'j9 7
ADOCK
O' ooq
J
$g
U
PDH
1E 40
J
.
-
..
JUL 021986
As discussed in the Plant Operations section of the enclosed report, the SALP
Board noted that nine reactor trips occurred during this period, including
four caused by personnel error. Your continued efforts to reduce the
frequency of these safety system challenges are encouraged.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
SALP report will be placed in the NRC's Public Document Room, as will any
comments you may wish to submit to NRC regarding the content of the SALP
report.
The NRC's Office for Analysis and Evaluation of Operational Data performed an
assessment of licensee event reports submitted for the WNP-2 facility.
This
'
assessment was provided as an input to the SALP process; a copy is therefore
enclosed for your information.
No reply to this letter is required; howe
should you have any questions
concerning the SALP report, we would- e plea ed to discuss them with you.
Sincer 7
.
John B. Martin, Regional Administrator
Enclosures:
1.
SALP Report No. 50-397/86-03
2.
AE0D Assessment of WNP-2 LERs
cc w/ enclosure 1:
P. L. Powell, WNP2
R. B. Glasscock, WNP2
J. D. Martin, WNP2
G. E. Doupe, Esq., WNP2
W. G. Conn, Burns & Roe, Inc.
J. G. Partlow, IE
R. M. Bernero, NRR
J. M. Taylor, IE
cc w/ enclosures 1 and 2:
C. M. Powers, WNP-2
State of WA
N. S. Reynolds, Esq., BLCP&R
Region V SALP File
.
bec w/ enclosure 1: SALP Board Members
B. Faulkenberry, RV
bec w/ enclosures: RSB/ Document Control Desk (RIDS)
G. Cook, RV
bec w/o enclosures
LFMB
DKle[ich
R
V
f
P
n/ dot
AL un fee
JMaqty ')
'}il/Z/86
f/2/B6 g//pb-
-.
. m.
-
-
.-
.--