Advises That 920805 Rev 23 to Facility Physical Security Plan Is Consistent W/Provisions of 10CFR50.54(p) & Acceptable
ML20126J885
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/30/1992
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9301060325
Download: ML20126J885 (2)


Text

4

- es

' > r DEC 3 0 1992 Docket No. 50-397 G. C. Sorensen, Manager of Regulatory Programs Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 This acknowledges the receipt of your letter dated August 6,1992 (G02-92-188), by which you transmitted a complete reissuance of the Washington Nuclear Project -- Unit 2 approved Physical Security Plan, denoted as Revision 23 and dated Auguv. 5, 1992.

We find the page changes, as described in your cover letter, to be consistent with the proviaions of 10 CFR Part 50.54(p). Accordingly, Revision 23 is considered acceptable as a replacement for your previously approved plan.

The attachments to your letters are being withheld from public disclosure because they contain Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.

Sincerely, Robert J. Pate, Chief Safeguards, Emergency Preparedness, and Non-Power Reactor Branch cc: Select List P. McKee, Chief, RSGB, NRR E. McPeek, PDRS, NRR Document Control Desk, HQ WNP-2 NRC Resident inspector NRR Docket File L. R. Norderhaug, RV RV/gmd REQUEST COPY REQU T COPY SEJD TO PDR t.S/NO,94t-Tl YES f 3' 7 y',S/NO LNorde "aug RPate f 12/p[/92 12/sc/92 f

(

110041

, ilizNJ go{

ots m' V,a 8-

- v v j, y s c yl \

us -

.. 7.n . ,

9 Mr. G. C. 3erensen WPPSS Nuclear Project No. 2 Washington Public Power Supply System (WNP-2)

CC:

Mr. J. W. Baker Regional Administrator, Region V WNP-2 Plant Manager U.S. Nuclear Regulatory Connission Washington Public Power Supply System 1450 Maria Lane, Suite 210 P.O. Box 968, MD 927M Walnut Creek, California 94596 Richland, Washington 99352

6. E. C. Doupe Esq. Chairman .

WashingtonPublicPowerJupplySystem Benton County Board of Comissioners 3000 George Washington Way P. O. Box 190 P. O. Box 968, MD 396 Prosser, Washington 99350-0190 Richland, Washington 99352 Mr. R. G. Waldo, Chairnan- Mr. R. C. Sorensen Ener9y Facility Site Evaluation Council V. S. Nuclent Regulatory Comission Mail Stop PY-il P. O. Box 69 Olympia, Washington 98504 Richland, Washington _99352

, Mr. Alan G. Hotler, Licensing Nanager Nicholas S. Reynolds, Esq.

Washington Public Power Supply System Winston & Strawn P. O. Box 968, MD-PE21 1400 L Street, N.W.

Richland, Washington 99352 Washington, D.C. 20005-3502 Mr. J. V. Parrish, Assistant -

Managing Director for Operations Washington Public Power supply System P. O. Box 968, MD 1023 -

Richland, Washington 99352 Mr. James C. Gearhart, Director  %[20/9 1 QualityAssurance Washington:Public Power Supply System P. O. Box 968, MD 280 -

Richland, Washin9 ton 99352 L o .t e a t - se h m o .- o w ie s n - mea to as co ei a -- .._ - ._ ,