Forwards Proprietary Matl Control & Accounting Safeguards Insp Rept 50-397/86-20 on 860609-13 & 19.No Violations or Deviations Noted.Rept Withheld (Ref 10CFR2.790)
ML20202D806
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/07/1986
From: Jonathan Montgomery
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19292F570 List:
References
NUDOCS 8607140219
Download: ML20202D806 (2)


Text

{{#Wiki_filter:. ~~?r TMMMWR IWF' Y . . , M 51lEDR E JUL 071986 ' .- ,, e Docket No. 50-397 i Washington Public Power Supply System P. O. Box 968 ' ' 3000 George Washington Way Richland, Washington 99352-0968 Attention: Mr. G."C. Sorensen Manager, Regulatory Programs Gentlemen: Subject: Material Control and Accounting Safeguards Inspection This letter refers to the routine material control and accounting safeguards inspection of your activities at WNP-2 authorized under NRC licensee NPF-21 conducted by Mr. G. B. Nelson of this office on June 9 through 13 and 19, 1986.

It also refer to the discussion of the inspection findings with Mr. J.

D. Martin and members of the WNP-2 staff on June 13, 1986.

Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with facility personnel and observations by the inspector.

Within the scope of this inspection, no violations or deviations were observed.

In accordance with Section 2.790(d) of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of the findings of your control and accounting procedures for safeguarding special nuclear material are exempt from public disclosure; therefore, the enclosed inspection report will not be placed in the public document room.

, 8607140219 h$0

PDR ADOCK pop . G gmmE TRAtt3MITTED !!ERNW NN h( 2.E0INf0it!AAT103

IE O. juL 071986 EUER!AL TRAt5f5TTED f!Erm ~ '

ZJSQ IMf01: san? Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, h}cs ' James L. Montgomery, Chief Nuclear Materials Safety and i Safeguards Branch Enclosure.

Inspection Report No. 50-397/86-20 (IE-V-755) l cc w/ enclosure: C. M. Powers, WNP-2 P. L. Powell, WNP-2 R. B. Glasscock, WNP-2 Director, Assurance & I

Licensing J. D. Martin, WNP-2 Asst. Managing Director for Operations G. E. Doupe, Esq., WPPSS l l W. G. Conn, Burns & Roe, Inc., c/o WPPSS k N. S. Reynolds, Bishop, Liberman, Cook, Purcell & Reynolds cc w/o enclosure:

State of Washington bec w/ enclosure: RSB/ Document Control Desk (RIDS) B. Faulkenberry , J. Martin I t bec w/o enclosure: LFMB Project Inspector I G. Cook Resident Inspector Region V 005 'W GBNelson/ norma MDSchuster ontgomery 7/ 2 /86 7/3 /86 7/p86 aff . ~rllmt CreiTUC BUET&I E.. . mm q" u. w'~-{g3 . . . . - ._ _____ . }}