Forwards Insp Rept 50-397/98-02 on 980406-09.No Violations Noted.Areas Examined Included Portions of Physical Security Program
ML20247P424
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/24/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20247P430 List:
References
50-397-98-02, 50-397-98-2, NUDOCS 9805280009
Download: ML20247P424 (3)


Text

SUBJECT:

NRC INSPECTION REPORT 50-397/98-02

Dear Mr. Parrish:

From April 6-9,1998, an NRC inspection was conducted at your Washington Nuclear Project-2 reactor facility. TN7 enclosed report presents the scope and results of that inspection.

Areas examined during this inspection included portions of your physical security program.

We determined that those areas inspected were being effectively implemented.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions conceming this inspection, we will be pleased to discuss them with you.

Sincerely, Dwight D. Chamberlain for Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket No.: 50-397 License No.: NPF-21 Enclosure:

I l

NRC Inspection Report j

50-397/98-02 Ij cc:

Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 0$ h$$$$97 i

PDR i

,

.

r Y

hY

_-

- _ _ - _ - _ - - _ - - - - _ _ _ - - _ _ - -

_ _ - _ _ - -. -

_ _ _. -

__

_. - - _ - - _

_

,

'

.,

l f

Washington Public Power Supply System-

-2-Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support /PIO r

!

Washington Public Power Supply System

-

l P.O. Box 968 i

Richland, Washington 99352-0968

]

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 396)

'

Chief Counsel

.

'

Washington Public Power Supply System

~ P.O. Box 968 Richland, Washington 99352-09CS Mr. Paul inserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.

Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

,

l

.

i

,

!

l ' *.

i

.

- Washington Public Power Supply System-3-E-Mail - T. Frye (TJF)

l E-Mail -D. Lange (DJL)

l

- E-Mail - NRR Event Tracking System (IPAS)

E-Mail - Document Control Desk (DOCDESK):

bec:

DMB IE-04 Regional Administrator-DRP Director DRS Director DRS Deputy Director WNP-2 Resident inspector Branch Chief (DRP/WNP-2/WCFO)

Senior Project Engineer (DRP/WNP-2/WCFO)

Branch Chief (DRP\\TSS)

Branch Chief, DRS/PSB Elaine Koup, NRR/DRPM/PSGB, (MS 011-E22)

RIV Docket File -

DRS/PSB Security File (Hodges)

Security inspector (Dexter)

MIS System WCFO File

. RIV File

l DOCUMENT NAME: R:\\_WN\\WN802RP.TWD To receive sepy of desument, indioste la ben: *C" - Copy without enclosses *E" - Copy with enclowes *W" - No copy

' RIV;PSB C:DRP/E C:DRS/PSB j

TWDexter:nh HWong BMurray

'

04/ /98 04/

/98 04/. /98 OFFICIAL RECORD COPY I

l

_ _ = _. - _ _ _ - _ _ = - _ _ _ _ _ _

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ - _ _ - _ _ _ _ _ - _ _ _ _ _ _. _ _

_ _ _

-

-