ML20057C662

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/93-28 on 930809-13.No Violations Noted
ML20057C662
Person / Time
Site: Columbia 
Issue date: 08/27/1993
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20057C663 List:
References
NUDOCS 9309290238
Download: ML20057C662 (3)


See also: IR 05000397/1993028

Text

_

.

UNITED STATES

/

'%';

NUCLEAR REGULATORY COMMISSION

y'

g,

.. E

REGION V

'

,

1450 MARIA LANE

  • /

WALNUT CREEK, CALIFORNIA 94596-5368

E-

.

%,,,

AUG 2 71993

Docket No. 50-397

Washington Public Power Supply System

P.O. Box 968

3000 George Washington Way

Richland, Washington 99352

Attention: Mr. J. V. Parrish

Assistant Managing Director, Operations

SUBJECT: NRC INSPECTION

This letter refers to the inspection conducted by Mr. A. McQueen of this

office on August 9 - 13, 1993, of activities authorized by NRC License No.

at the Washington Nuclear Project, Unit 2.

It also refers to the

N PF -21. ,

discussion of our preliminary inspection findings held by the inspector with

yourself and other members of your staff identified in the encibsed inspection

report on August 13, 1993.

Areas examined during this inspection included activities related to emergency

Within these

preparedness as described in the enclosed inspection report.

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with facility and contract personnel, and

observations of activities in progress.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

W

-

i

J

R bert J.

t , Chief

Safeguards, Emergency Preparedness and

!

Non-Power Reactor Branch

Enclosure:

j

Inspection Report No. 50-397/93-28

9309290238 930827

PDR

ADOCK 05000397

G

PDR

ll

'

e

,

_.

4

.

cc w/ enclosure:

Mr. J. H. Swailes, WNP-2 Plant Manager

t

G. E. C. Doupe, Esq., WPPSS

Mr. Warren A. Bishop, Chairman, Energy Facility _ Site Evaluation Council

j

l

Mr.~ Alan G. Hosler, Licensing Manager, WPPSS

!

Mr. G. C. Sorensen, Manager, Regulatory Programs, WPPSS

Chairman,'Benton County Board of Commissioners

l

M. H. Philips, Jr., Esq., Winston & Strawn'

Terry Strong, DOH

R. Donovan, FEMA, RX

l

'!

-l

'i

,

i

l

t

l

l

I

t

f

!

1

l

-:

!

'

!

t

i

!

I

i

,

,

s

i

1

k

i

i

.

__-

-

t

9

n.

.

bcc w/ enclosure

!

Docket File

Resident Inspector

Project Inspector

.

G. Cook

!'

B. Faulkenberry

C. VanDenBurgh

l

bcc w/o enclosures:

M. Smith

J. Zollicoffer

l

Region / ear 8/23/93

AMcQueen

RPate[-

';

8/ pf/93

8/2 7 /93

dMW

EST COPY]

REQUEST

Y)

TO PDR]

1

YES / N0 1

YES /

40 1

ES 3/ N01

v

-

I

!

!

.

j

1

280014

i

i

'

Tear-

,