ML20055F523
| ML20055F523 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/09/1990 |
| From: | Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 9007170407 | |
| Download: ML20055F523 (1) | |
Text
r i
/
Docket No.
50-397 M'91Mc License Nos.
NPF-2 Report No.
90-12 Washin. ton Public Power Supply System P. O, iox 968 3000 George Washington Way Richland, Washington 99352 Attention:
Mr. G. D. Bouchey Director, Licensing and Assurance Gentlemen:
i Thank you for your letter dated June 28, 1990 informing us of the steps you have taken to correct the items which were brought to your attention in our letter and Notice of Violation dated June 6, 1990.
The implementation of your corrective actions will be verified during our next inspection.
Your cooperation is appreciated.
Sincerely, t
M. D. Schuster, Acting Chief Safeguards, Emergency Preparedness and Non-Power Reactor Branch bec w/ copy of ltr dtd 6/28/90:
docket file l
B. Faulkenberry l
J. Martin bec w/o copy of ltr:
State of WA Resident Inspector Pro ect Inspector M.
mith J. 20111 coffer G. Cook REGION V AMcQueen/ dot MSchuster 7/G /90 7/G) /90 4M llD (
451 COPY J RtQUEST W Y i
')/ NO
] YES / /NO )
v SEAID TO PDR ]
{S)/
NO
)
x. ;~
.w I
\\
kkiki
/
~~n
-