Other: AECM-85-0180, Requests 10CFR50.73 Exemption for ESF Actuations Occurring from Single Channel Trip Signals,Including Inadvertent Isolations of Reactor Water Cleanup Sys Caused by High Differential Flow Signals or Spurious High Temp Signals, GO2-85-093, Requests Exemption from Reporting Future ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious Reactor Water Cleanup High Delta Flow,Per 10CFR50.73(f). Justification for Exemption Provided, GO2-85-163, Forwards Remittance of Application Fee for 850220 LER Exemption Request,Per 850313 Request, ML20128F244, ML20147H990
|
MONTHYEARGO2-85-093, Requests Exemption from Reporting Future ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious Reactor Water Cleanup High Delta Flow,Per 10CFR50.73(f). Justification for Exemption Provided1985-02-20020 February 1985 Requests Exemption from Reporting Future ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious Reactor Water Cleanup High Delta Flow,Per 10CFR50.73(f). Justification for Exemption Provided Project stage: Other GO2-85-163, Forwards Remittance of Application Fee for 850220 LER Exemption Request,Per 850313 Request1985-03-25025 March 1985 Forwards Remittance of Application Fee for 850220 LER Exemption Request,Per 850313 Request Project stage: Other ML20128F2441985-07-0202 July 1985 Requests Exemption from Specified Sections of 10CFR50.72 & 50.73 Re LERs of Spurious Reactor Protection Sys Actuations. Actuations Caused by Neutron Instrumentation Electrical Noise & Not Safety Concern Project stage: Other AECM-85-0180, Requests 10CFR50.73 Exemption for ESF Actuations Occurring from Single Channel Trip Signals,Including Inadvertent Isolations of Reactor Water Cleanup Sys Caused by High Differential Flow Signals or Spurious High Temp Signals1985-07-16016 July 1985 Requests 10CFR50.73 Exemption for ESF Actuations Occurring from Single Channel Trip Signals,Including Inadvertent Isolations of Reactor Water Cleanup Sys Caused by High Differential Flow Signals or Spurious High Temp Signals Project stage: Other ML17278A4491985-10-18018 October 1985 Responds to Request for Exemption from 10CFR50.72 & 73 Reporting Requirements.Due to Vol of Requests from Other Utils,Requirements Under Reevaluation.Commission Will Address Concerns on Generic Basis Project stage: Approval ML17278A5781986-01-17017 January 1986 Proposed Tech Spec,Revising Section 4.6.H.1 Re Surveillance Requirements.Frequency of Operability Demonstration Changed from 31 to 92 Days by Cycling Each Vacuum Breaker & Verifying Valves in Closed Position Project stage: Other GO2-86-080, Application for Amend to License NPF-21 Revising Section 4.6.4.1 to Change Surveillance Frequency for Operability Demonstration of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days.Fee Paid1986-01-17017 January 1986 Application for Amend to License NPF-21 Revising Section 4.6.4.1 to Change Surveillance Frequency for Operability Demonstration of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days.Fee Paid Project stage: Request ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date Project stage: RAI GO2-86-695, Requests Status of NRC Review of Util 850220 Request for Exemption from Reporting ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious RWCU High Delta Flow1986-07-28028 July 1986 Requests Status of NRC Review of Util 850220 Request for Exemption from Reporting ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious RWCU High Delta Flow Project stage: Request ML17278A9801986-08-26026 August 1986 Forwards Request for Addl Info Re Proposed Rev to Tech Spec 4.6.4.1,addressing Suppression Chamber - Drywell Vacuum Breakers (3/4.6.4).Response Requested within 45 Days of Ltr Receipt Project stage: RAI ML17278B0291986-10-0303 October 1986 Responds to 860728 Request for Info Re Status of Review of Event Rept Exemption Requests.Review Halted Due to More Urgent Issues.Aeod Will Establish Position Sometime in 1987 Project stage: Approval ML17279A6751987-02-0909 February 1987 Offers No Comments on Util 860117 Application for Amend to License NPF-21,changing Surveillance Frequency for Operability of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days Project stage: Request GO2-87-009, Application for Amend to License NPF-21,modifying Time Period When Reg Guide 1.97,Rev 2 Required to Be Implemented for Suppression Pool Level Monitoring from Prior to Startup Following Second Refueling Outage.Fee Paid1987-03-12012 March 1987 Application for Amend to License NPF-21,modifying Time Period When Reg Guide 1.97,Rev 2 Required to Be Implemented for Suppression Pool Level Monitoring from Prior to Startup Following Second Refueling Outage.Fee Paid Project stage: Request GO2-87-256, Withdraws Request for Amend to License NPF-21,changing Tech Spec Section 4.6.4.1 Re Surveillance Frequency for Chamber Drywell Vacuum Breaker Operability Demonstration from 31 to 92 Days to Allow Util to Concentrate on Other Requests1987-10-0202 October 1987 Withdraws Request for Amend to License NPF-21,changing Tech Spec Section 4.6.4.1 Re Surveillance Frequency for Chamber Drywell Vacuum Breaker Operability Demonstration from 31 to 92 Days to Allow Util to Concentrate on Other Requests Project stage: Request GO2-87-258, Withdraws 850220 Request for Exemption from LER Reporting Requirements for Chlorine Monitor Tape Depletion & Spurious High Delta Flow.Exemption No Longer Necessary1987-10-0606 October 1987 Withdraws 850220 Request for Exemption from LER Reporting Requirements for Chlorine Monitor Tape Depletion & Spurious High Delta Flow.Exemption No Longer Necessary Project stage: Request ML20147H9901988-03-0202 March 1988 Informs of Termination of Action on Three Util License Amend Applications,Per Util 871006,02 & 0615 Requests Project stage: Other 1986-07-16
[Table View] |
Text
_
March 2, 1988 Docket No.:
50-397 DISTRIBUTION N >
Wanda Jones NRC &~ Local PORs EButcher Mr. G. C. Sorensen, Manager GHolahan ACRS(10)
Regulatory Programs JLee GPA/PA Washington Public Power Supply System RSamworth ARM /LFMB P.O. Box 968 OGC WNP-2 3000 George Washington Way 0Hagan Region V Richland, Washington 99352 Edordan JPartlow
Dear Mr. Sorensen:
TBarnhart(4)
SUBJECT:
TERMINATION OF NRC REVIEW ON THREE LICENSE AMENDMENT APPLICATIONS (TACNOS. 56947, 60547, AND 64941)
This is to infom you that in accordance with your requests we terminated action on three WNP-2 license amendment applications.
If WPPSS would like NRC to consider them further, you must reapply.
On February 20, 1985 WPPSS requested (TAC 56947 Reference letter G02-85-093) an exemption to the reporting requirements for chlorine monitor tape depletion and spurious high delta flow. On October 6,1987 (Reference G02-87-258) WPPSS withdrew that request.
On January 17, 1986 WPPSSrequested(TAC 60547,ReferenceletterG02-86-080)an amendment to Section 4.6.4.1 of the WNP-2 Technical Specifications to change the surveillance frequency for suppression chamber-drywall vacuum breaker operability. On October 2,1987 (Reference G02-87-256) WPPSS withdrew that request.
On March 12, 1987 WPPSS requested (TAC 64941 Reference letter G02-87-0090) a deferral of the license requirement to implement a wide range suppression pool level monitoring system consistent with Regulatory Guide 1.97.
On June 15, 1987 WPPSS (Reference G02-87-0204) withdrew that request on the basis that the system was indeed implemented.
I will be happy to answer any question regarding our temination of these applications.
Sincerely, original signed by George W. Knighton, Director Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects See next page gp/
pd ORSP/FDV 0
DV DRSP/D:PDV RBSamworth:dr J GWKnighton
'2 J./t/88
/
88 T./4/88 8803090140 080302 PDR ADOCK 05000397 i
l P
ppg L
k" e5 a
a j
e o
Mr. G. C. Sorensen, Manager WPPSS Nuclear Project No. 2 Washington Public Power Supply System, (WNP-2) 1 cc:
i J
Nicholas S. fieynolds, Esq.
J Regional Administrator, Region V Bishop Cook, Purcell j ' U.S. Nuclear Regulatory Comission
& Reynolds C, '
> 1450 Maria Lane, Suite 210 1200 Seventeenth Street, N.W.t Walnut Creek. California 94596 Washington, D.C.
20036 Mr. G. E. Doupe Esquire Chainnan Washington Public Power Supply System Ber. con County Beard of Comissioners P. O. Box 968 I
Prosser, Washington 99350 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 1
Mr. P. L. Powell, Licensing Manager Washington Public Power Supply System P. O. Box 968 MD 9568 Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. O. Box 968 MD 1023 Richland, WA 99352 Mr. R. B. Glasscock, Director Licensing and Assurance Washington Public PowergSupply System i
P. O. Box 968, MD 280 Richland, Washington 99352 Mr. C. M. Powers WNP-2 Plant Manager Washington Public Powt Supply System P. O. Box M) 927M Richland, Washington 99352
_