ML20137H089

From kanterella
Jump to navigation Jump to search
Ack Receipt of Which Transmitted Change 34 to Physical Security Plan for Washington Nuclear Plant-2,per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan. W/O Encl Per 10CFR73.21
ML20137H089
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/27/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9704020054
Download: ML20137H089 (5)


Text

..~

-. -.~.-. -

- - -. -..... _ -. -.. -. - - -. ~. - -. -... ~ -..

9 t

\\*$g" "' Gut,Ik UNITED STATES NUCLEAR REGULATORY COMMISSION

.y o

g REGION IV

]

i 3

..... /[

611 RYAN PLAZA DRIVE, SUITE 400

%g AR LING ton, TEXAS 76011 8064 l

MAR 2 71997

)

d Mr. J. V. Parrish (Mail Drop 1023)

)

Chief Executive Officer Washington Public Power Supply System i

P.O. Box 968 Richland, Washington 99352-0968

SUBJECT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PLANT-2 l

PHYSICAL SECURITY PLAN, REVISION 34 i

Dear Mr. Parrish:

)

This letter acknowledges receipt of your letter dated January 16,1997, which transmitted Change 34 to the physical security plan for the Washington Nuclear Plant-2.

i Based on your determination that the changes do not decrease the effectiveness of your i

security plan and after limited review of the changes, no NRC approval is required, in 4

accordance with 10 CFR 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the effectiveness of your security plan.

j The enclosures to your letter contain safeguards information of a type specified in i

10 CFR 73.21 and will be withheld from public disclosure.

j i

{

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, without the enclosure (s), will be placed in the NRC Public Document Room.

Sincerely, e

p !sM, rthur T. How 11111, Director f

Division of Reactor Safety

.j Docket No.: 50-397 d)

License No.: NPF-21 g

&~

l 9704020054 970327 PDR ADOCK 05000397 F

PDR 030050 appupppppp5

/ Washington Public Power Supply d System cc.

Frederick S. Adair, Chairman

'inergy Facility Site Evaluation Council 0.O. Box 43172 Olympia, Washington 98504-3172 j

Mr. Paul R. Bemis (Mail Drop PE20)

Vice President, Nuclear Operations Washington Public Power Supply System P,0. Box 968 Richland, Washington 99352-0968 Mr'."hodney L. Webring (Mail Drop PE08)

Vice President, Operations Support /PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Powar Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Al E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Lourdes C. Fernandez (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

Wa'shington Public Power Supply,

System Mr. Malcolm H. Phillips, Jr., Esq.

Winston & Strawn i

1400 L Street, N.W.

Washington, D.C. 20005-3502 l

l

)

i l

l l

t

Washington Public Power Supply,

System r

bec to DCD (I b)'

bec distrib.

RIV:

Regional Administrator Resident Inspector DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)

MIS System Senior Project inspector (DRP/E, WCFO)

RIV File Branch Chief (DRP/TSS)

M. Hammond (PAO, WCFO)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

WCFO File Elaine Koup (NRR/DRPM/SGB, MS:0D11E-22)

DRS/PSB Security File (Goines)

RITS Coordinator (Elko)

DRS Al 97-S-0003 i

7 DOCUMENT NAME: G:\\DRSLTRS\\Al70003S.TWD To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy RIV:SPSS:PSB.l C:PSB i.

D:DRSf;#

l l

TWDexter:dy h BMurray \\')

ATHowdtb l

03/&/97 03Ay/97 /

03/2 7/97' 0FFICIAL RECORD COPY i

9 Washington Public Power Supply '

System bec to DCD (1 53) bec distrib.j y RIV:

Regional Administrator Resident inspector DRP Director DRS PSB

- Branch Chief (DRP/E, WCFO)

MIS System i

Senior Project Inspector (DRP/E, WCFO)

RIV File Branch Chief (DRP/TSS)

M. Hamrnond (PAO, WCFO)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

WCFO File Elaine Koup (NRR/DRPM/SGB, MS:0D11E-22)

DRS/PSB Security File (Goines)

RiTS Coordinator (Elko) i DRS Al 97-S-OOO3 1

l i

DOCUMENT NAME: G:\\DRSLTRS\\Al70003S.TWD To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:SPSS:PSB l C:PSB D:DRS /; g l

l TWDexter:dy b BMurray V)

ATHowdth 03/&/97 03Ay/97 /

03/21/9F OFFIC.AL RECORD COPY