Forwards Const Insp Repts 50-445/87-03 & 50-446/87-03 on 870101-0228.No Violations or Deviations Noted.Two Unresolved Items Identified
ML20214M394
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/28/1987
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20214M396 List:
References
NUDOCS 8706010294
Download: ML20214M394 (3)


See also: IR 05000445/1987003

Text

cc

= ,

'In Reply Refer To:

Dockets: 50-445/87-03 E 20 E

50-446/87-03

TU Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North'01ive Street, Lock Box 81

Dallas, Texas 75201-

Gentlemen:

This refers to the construction inspection conducted by Mr. D. L. Kelley and

other members of the Region IV Comanche Peak Group during the period January 1

through February 28, 1987, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,

Units 1 and 2, and to the discussions of our findings with you and other members

of your staff during and at the conclusion of the inspection.

Areas of construction examined during the inspection included replacement of_.

electrical penetration assemblies in Units 1 and 2, plant tours, removal and

rework of Class IE 6.9kv switchgear, and fire prevention / protection. The-

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observation by the NRC inspectors.

These findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were $

identified.

Two unresolved items are identified in paragraph 4 of the enclosed inspection

report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

O@Jnal Signed By

E. H. Johnson

8706010294 870528  : -

E. H. Johnson, Director

PDR ADOCK 05000445

G PDR Division of Reactor Safety and

Projects

Enclosure:

Appendix - NRC Construction Inspection Report

50-445/87-03

50-446/87-03

cc w/ enclosure: (see next page)

RIV:CPTG

IBarnes 58

DRSP g

EHJohnson

Ihk

apessaYd

J /22/87 3 /0/87 /W/87 aluf87 .o l

1\

t

c: ;g

. .,

3

s

TU Electric -2-

.

c

,

TU Electric'

. ATTN: G. S. Keeley, Manager,

Nuclear Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

' Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dal~ias, Texas 75224

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P.O. Box 12548

Austin, Texas 78/11 - 2548

Administrative Judge Peter Bloch

JJ. S. Nuclear Regulatory Commission

Washington, D. C. 20555

Elizabeth B. Johnson

~

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X, Building 3500

Oak Ridge, Tennessee 37830

Dr. Kenneth A. McCollem

1107 West Knapp

Stillwater, Oklahoma 74075

Dr. Walter H. Jordan

881 Outer Drive

Oak Ridge, Tennessee 37830

Anthony Roisman, Esq.

Executive Director

Trial Lawyers for Public Justice

2000 P. Street, N.W., Suite 611

Washington, D. C. 20036

Texas Radiation Control Program Director

, , _

?. ,

Ibcc'to'DM8 (IE01)

Tbcc distrib. by RIV:

  • RPS * MIS System i
  • RRI-0PS *RSTS Operator
  • RRI-CONST *R&SPB
  • T. F. Westerman, RSB ORSP

C.~ Grimes, OSP R. Martin, RA

-L'.~ Chandler, DGC *RSB

  • RIV File J. Taylor, EDO

-*D. Weiss, RM/ALF. G. Gower, OSP l

  • I. Barnes, CPTG * Project Inspector
  • R. Hall
  • w/766

.

'.

. _ _ _ . . _ _ _ _ _