ML20214M394
| ML20214M394 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/28/1987 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20214M396 | List: |
| References | |
| NUDOCS 8706010294 | |
| Download: ML20214M394 (3) | |
See also: IR 05000445/1987003
Text
cc
=
,
'In Reply Refer To:
Dockets:
50-445/87-03
E 20 E
50-446/87-03
TU Electric
ATTN:
Mr. W. G. Counsil
Executive Vice President
400 North'01ive Street, Lock Box 81
Dallas, Texas
75201-
Gentlemen:
This refers to the construction inspection conducted by Mr. D. L. Kelley and
other members of the Region IV Comanche Peak Group during the period January 1
through February 28, 1987, of activities authorized by NRC Construction
Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,
Units 1 and 2, and to the discussions of our findings with you and other members
of your staff during and at the conclusion of the inspection.
Areas of construction examined during the inspection included replacement of_.
electrical penetration assemblies in Units 1 and 2, plant tours, removal and
rework of Class IE 6.9kv switchgear, and fire prevention / protection.
The-
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observation by the NRC inspectors.
These findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
$
identified.
Two unresolved items are identified in paragraph 4 of the enclosed inspection
report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
O@Jnal Signed By
E. H. Johnson
8706010294 870528
-
ADOCK 05000445
E. H. Johnson, Director
G
Division of Reactor Safety and
Projects
Enclosure:
Appendix - NRC Construction Inspection Report
50-445/87-03
50-446/87-03
cc w/ enclosure:
(see next page)
RIV:CPTG
DRSP g
Ihk
IBarnes 58
EHJohnson
apessaYd
J /22/87
3 /0/87
/W/87
aluf87
.o l
1\\
t
c:
- g
.
.,
3
s
TU Electric
-2-
.
c
,
TU Electric'
. ATTN:
G. S. Keeley, Manager,
Nuclear Licensing
Skyway Tower
400 North Olive Street
Lock Box 81
' Dallas, Texas 75201
Juanita Ellis
President - CASE
1426 South Polk Street
Dal~ias, Texas
75224
Renea Hicks
Assistant Attorney General
Environmental Protection Division
P.O. Box 12548
78/11 - 2548
Administrative Judge Peter Bloch
JJ. S. Nuclear Regulatory Commission
Washington, D. C.
20555
Elizabeth B. Johnson
~
Administrative Judge
Oak Ridge National Laboratory
P. O. Box X, Building 3500
Oak Ridge, Tennessee 37830
Dr. Kenneth A. McCollem
1107 West Knapp
Stillwater, Oklahoma 74075
Dr. Walter H. Jordan
881 Outer Drive
Oak Ridge, Tennessee 37830
Anthony Roisman, Esq.
Executive Director
Trial Lawyers for Public Justice
2000 P. Street, N.W., Suite 611
Washington, D. C.
20036
Texas Radiation Control Program Director
, , _
?.
,
Ibcc'to'DM8 (IE01)
Tbcc distrib. by RIV:
- RPS
- MIS System
i
- RRI-0PS
- RSTS Operator
- RRI-CONST
- R&SPB
- T. F. Westerman, RSB
ORSP
C.~ Grimes, OSP
R. Martin, RA
-L'.~ Chandler, DGC
- RSB
- RIV File
J. Taylor, EDO
-*D. Weiss, RM/ALF.
G. Gower, OSP
l
- I.
Barnes, CPTG
- Project Inspector
- R. Hall
- w/766
.
'.
.
_
_ _ . . _ _ _ _ _