ML20198K397

From kanterella
Revision as of 03:07, 21 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-373/86-19 & 50-374/86-18 on 860506-08 & Notice of Violation
ML20198K397
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/28/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20198K400 List:
References
NUDOCS 8606040016
Download: ML20198K397 (2)


See also: IR 05000373/1986019

Text

--

..

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Z. Falevits of this

office on May 6-8, 1986, of activities at LaSalle County Nuclear Station,

Units 1 and 2 authorized by NRC Facility Operating Licenses No. NPF-11 and

No NPF-18 and to the discussion of our findings with Mr. R. D. Bishop at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel

During this inspection, certain of your activities appeared to be in vi'olation

of NRC reouirements, as described in the enclosed Notice. The inspection

showed that action had been taken to correct the identified violation and

to prevent recurrence. Our understanding of your corrective actions are

described in Paragraph 2c of the enclosed inspection report. Consequently,

no reply to the violation is required and we have no further questions

regarding this matter at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

S606040016 860528

PDR ADOCK 05000373

G PDR /[0/, I

i

.

Commonwealth Edison Company 2 MAY 281986

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

j ;* 7 3 by U.'U '* D IE00

,

J. J. Harrison, Chief

Engineering Branch

Enclosures:

1. Notice of Violation

2. Inspection Reports

No. 50-373/86019(DRS);

No. 50-374/86018(DRS)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Diederich, Plant

Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

%td

Falevits/kst

a

Maffett

b'/ Ha rison

c.g s/n/et <[//(W 6 z6