ML20155C975

From kanterella
Revision as of 21:47, 14 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards 1985 Integrated Leak Rate Test of Zion Unit 2 Reactor Containment Bldg, Conducted on 850915-17
ML20155C975
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 03/31/1986
From: Leblond P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20155C977 List:
References
1457K, NUDOCS 8604170204
Download: ML20155C975 (1)


Text

__

Ccmm:nw2:lth Ediscn O One First National Ptara. Chicago. Ilknois

. C/.-

Address Reply to: Post Office Box 767 Chicago. Illinois 60690 March 31, 1986 l

1 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Subj ect: Zion Nuclear Power Station Unit 2  !

Reactor Containment Building Integrated Leak Rate Test l NRC Docket No. 50-304 l

Dear Mr. Denton:

1 Transmitted with this letter is the summary techneial report of the Zion Unit 7. reactor containment building integrated leak rate test which was conducted between September 15 and September 17, 1985. This report is submitted pursuant to the requirements of 10 CFR 50, Appendix J.Section V.

If there are any questions regarding this matter, please contact this office.

One signed original and fifteen (15) copies of this letter and the enclosures are provided for your review.

Very truly yours, P. C. LeBlond Nuclear Licensing Administrator im I

l Enclosure I f cc: 01 l J. A. Norris - NRR (w/Att)

Zion Resident Inspector () 5lg