Ccmm:nw2:lth Ediscn O
One First National Ptara. Chicago. Ilknois
. C/.-
Address Reply to: Post Office Box 767 Chicago. Illinois 60690 March 31, 1986 l
1 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Subj ect: Zion Nuclear Power Station Unit 2 Reactor Containment Building Integrated Leak Rate Test l
NRC Docket No. 50-304 l
Dear Mr. Denton:
1 Transmitted with this letter is the summary techneial report of the Zion Unit 7. reactor containment building integrated leak rate test which was conducted between September 15 and September 17, 1985. This report is submitted pursuant to the requirements of 10 CFR 50, Appendix J.Section V.
If there are any questions regarding this matter, please contact this office.
One signed original and fifteen (15) copies of this letter and the enclosures are provided for your review.
Very truly yours, P. C. LeBlond Nuclear Licensing Administrator im I
l Enclosure I
f 01 l
cc:
J. A. Norris - NRR (w/Att)
Zion Resident Inspector
() 5l g