Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:UTILITY
MONTHYEARIR 05000369/19900201990-11-0707 November 1990 Insp Repts 50-369/90-20 & 50-370/90-20 on 901001-05 & 1101. No Violations or Deviations Noted.Major Areas Inspected: Design Changes & Mod & Engineering Support Activities IR 05000369/19900191990-10-0404 October 1990 Insp Repts 50-369/90-19 & 50-370/90-19 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of NDE Procedures, Observations of in-progress NDE Exams & Insp Plan IR 05000369/19900171990-09-11011 September 1990 Insp Repts 50-369/90-17 & 50-370/90-17 on 900726-0828. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities & Facility Mods IR 05000369/19900151990-09-10010 September 1990 Insp Repts 50-369/90-15 & 50-370/90-15 on 900813-17. Violations Noted But Not Cited.Major Areas Inspected:Annual Emergency Exercise ML20056A5861990-07-24024 July 1990 Insp Repts 50-369/90-11 & 50-370/90-11 on 900522-0625. Violations Noted.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities, Facility Mods & Follow Up of Events Repts ML20055H4841990-07-13013 July 1990 Insp Repts 50-369/90-14 & 50-370/90-14 on 900626-0705. Violations Noted.Major Areas inspected:licensee-identified Issues Re Unit 1 Diesel Generator Inoperability for Approx 26 H on 900625-26 IR 05000369/19890301989-09-20020 September 1989 Insp Repts 50-369/89-30 & 50-370/89-30 on 890821-24.Noncited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000369/19890151989-09-0707 September 1989 Insp Repts 50-369/89-15 & 50-370/89-15 on 890605-09,19-23 & 0728.No Violations or Deviations Noted.Major Areas Inspected:Maint Program & Program Implementation IR 05000369/19890291989-08-31031 August 1989 Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected: Portions of Inservice Insp Program,Unit 2 Insp Plan for Outage,Review of NDE Procedures & Exam Verifications IR 05000369/19890261989-08-30030 August 1989 Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Previously Identified Items & Status of Steam Generator Blowdown Recycle Sys IR 05000369/19890221989-08-17017 August 1989 Insp Repts 50-369/89-22 & 50-370/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & Previous Open Item IR 05000369/19890211989-08-16016 August 1989 Insp Repts 50-369/89-21 & 50-370/89-21 on 890707-18. Violations Noted.Major Areas Inspected:Operation of Unit 1 Following Improperly Performed Heat Balance & Concomitant Nonconservative Calibr of Power Range Nuclear Instruments IR 05000369/19890201989-08-16016 August 1989 Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations Noted.Major Areas Inspected:Containment Local Leak Rate Testing & Verification of Containment Integrity IR 05000369/19890181989-08-0909 August 1989 Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities,Followup of LER & Followup on Previous Findings IR 05000369/19890161989-08-0808 August 1989 Insp Repts 50-369/89-16 & 50-370/89-16 on 890622-28.One Violation & One Deviation Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on LER & Previous Insp Findings IR 05000369/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-369/89-23 & 50-370/89-23 on 890727 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Security Event Logs IR 05000369/19890191989-07-19019 July 1989 Insp Repts 50-369/89-19 & 50-370/89-19 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program & Unit 2 Insp Plan for Outage,Nde procedures,in-progress NDE Exams & NDE Equipment Calibr ML20236E6471989-07-13013 July 1989 Insp Repts 50-369/89-14 & 50-370/89-14 on 890422-0601. Violation Noted.Major Areas Inspected:Operation Safety Verification,Surveillance Testing,Maint activities,10CFR21 Reviews,Followup on Previous Insp Findings & LERs IR 05000369/19890171989-07-10010 July 1989 Insp Repts 50-369/89-17 & 50-370/89-17 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Responses to Previous Insp Findings,Including Followup on NRC Bulletins 88-001 & 88-003 & on 10CFR21 Rept on Breakers ML20244E5881989-06-0505 June 1989 Insp Repts 50-369/89-11 & 50-370/89-11 on 890330-0421. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890131989-06-0101 June 1989 Partially Withheld Insp Repts 50-369/89-13 & 50-370/89-13 on 890501-05 (Ref 10CFR2.790 & 73.21).Two Noncited Violations Noted Re Failure to Conduct Psychological Exam.Major Areas Inspected:Mgt Support,Record & Repts & Lighting ML20247M5801989-05-15015 May 1989 Insp Repts 50-369/89-10 & 50-370/89-10 on 890404-07.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Requirements & Practices Implemented During Licensee Response to Steam Generator B Tube Rupture IR 05000369/19890021989-04-25025 April 1989 Operational Safety Team Insp Repts 50-369/89-02 & 50-370/89-02 on 890213-17 & 0227-0322.Violations Noted.Major Areas Inspected:Operations,Maint Support of Operations,Mgt Controls & Emergency Operating Procedures ML20245G9781989-04-20020 April 1989 Insp Repts 50-369/89-05 & 50-370/89-05 on 890228-0329. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890071989-04-17017 April 1989 Insp Repts 50-369/89-07 & 50-370/89-07 on 890320-24.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of Procedures,Observation of Work Activities & Evaluation of Eddy Current Testing IR 05000369/19890061989-04-10010 April 1989 Insp Repts 50-369/89-06 & 50-370/89-06 on 890308-11.Major Areas Inspected:Events Re 890307 Steam Generator B Tube Failure.Procedures Found to Have Weaknesses Which Could Result in Release of Radioactivity to Environ IR 05000369/19890081989-04-0606 April 1989 Insp Repts 50-369/89-08 & 50-370/89-08 on 890327-31.No Violations Noted.Major Areas Inspected:Steam Generator Tubing Eddy Current Exam & Activities Associated W/Unit 1 Steam Generator B Ruptured Tube IR 05000369/19890091989-03-30030 March 1989 Partially Withheld Insp Repts 50-369/89-09 & 50-370/89-09 on 890220-24 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Security Program Audit,Records & Repts & Compensatory Measures IR 05000369/19890031989-03-30030 March 1989 Insp Repts 50-369/89-03 & 50-370/89-03 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Triennial post-fire Safe Shutdown Capability Reverification & Assessment (Module 64150) ML20244A8831989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures IR 05000369/19890011989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures ML20235P5621989-02-0707 February 1989 Insp Repts 50-369/88-33 & 50-370/88-33 on 881122-890119. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint activities,10CFR21 Insp,Startup from Refueling & Followup on Previous Insp IR 05000369/19880301988-11-0404 November 1988 Insp Repts 50-369/88-30 & 50-370/88-30 on 880924-1020. Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880271988-10-28028 October 1988 Insp Repts 50-369/88-27 & 50-370/88-27 on 880913-16.No Violations or Deviations Noted.Weakness Noted.Major Areas Inspected:Annual Radiological Emergency Response Exercise IR 05000369/19880281988-10-14014 October 1988 Partially Withheld Insp Repts 50-369/88-28 & 50-370/88-28 on 880912-16 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Maint Barriers,Assessment Aids,Access Controls,Alarm Stations & Training & Contingencies IR 05000369/19880261988-10-12012 October 1988 Insp Repts 50-369/88-26 & 50-370/88-26 on 880820-0923. Violation Noted:Inadequate Fire Barrier Penetrations.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Findings IR 05000369/19880241988-10-0606 October 1988 Insp Repts 50-369/88-24 & 50-370/88-24 on 880801-0916. Violations & Unresolved Item Noted.Major Areas Inspected: Past & Current Operability of Hydrogen Skimmer Sys IR 05000369/19880291988-09-23023 September 1988 Insp Repts 50-369/88-29 & 50-370/88-29 on 880829-0909. Violations Noted.Major Areas Inspected:Inoperability of Safety Sys Due to Inadequate post-mod Testing ML20205S0711988-09-13013 September 1988 Insp Repts 50-369/88-25 & 50-370/88-25 on 880816-18.No Violations or Deviations Identified.Major Areas Inspected: Resolution of Findings from NRC Diagnostic Evaluation Team Rept & Status of Licensee Written Response to Rept ML20154F9911988-09-0606 September 1988 Insp Repts 50-369/88-23 & 50-370/88-23 on 880723-0819.One Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings ML20151Z8821988-08-19019 August 1988 Insp Repts 50-369/88-20 & 50-370/88-20 on 880625-0722. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880221988-08-11011 August 1988 Partially Withheld Insp Repts 50-369/88-22 & 50-370/88-22 on 880718-22 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Procedures & Operations of SNM IR 05000369/19880161988-07-26026 July 1988 Insp Repts 50-369/88-16 & 50-370/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages IR 05000369/19880191988-07-21021 July 1988 Insp Repts 50-369/88-19 & 50-370/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Nde Activities Re Resistance Temp Detector Sys Mods & Inservice Insp & Preservice Insp Being Accomplished During Outage IR 05000369/19880171988-07-15015 July 1988 Insp Repts 50-369/88-17 & 50-370/88-17 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluents IR 05000369/19880181988-07-12012 July 1988 Partially Withheld Insp Repts 50-369/88-18 & 50-370/88-18 on 880620-24 (Ref 10CFR2.790 & 73.21).One Licensee Identified Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security Program & Records & Repts ML20151E6081988-07-0808 July 1988 Insp Repts 50-369/88-14 & 50-370/88-14 on 880521-0624. Violations Noted:Continued Weakness in Procedural Compliance.Major Areas Inspected:Safety Verification, Surveillance Testing & Refueling Outage Activities IR 05000369/19880151988-06-30030 June 1988 Insp Repts 50-369/88-15 & 50-370/88-15 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nde Procedures Review,Observation & Review of in-process NDE Exam & Review of Inservice Insp Exam Data ML20195C8611988-06-0707 June 1988 Insp Repts 50-369/88-13 & 50-370/88-13 on 880502-06.One Violation & Two Unresolved Items Noted.Major Areas Inspected:Nrc Diagnostic Evaluation Team Rept Findings & Action on Previous Insp Findings ML20155J3411988-05-31031 May 1988 Insp Repts 50-369/88-12 & 50-370/88-12 on 880423-0520. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings 1990-09-11
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19993011999-03-18018 March 1999 NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205.Five SRO & Six RO Candidates Received Written Exams & Operating Tests IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20154C4131998-09-21021 September 1998 Notice of Violation from Insp on 980712-0822.Violation Noted:On or Before 971217,operations Personnel Failed to Designate Appropriate Vent Valves for Venting to Properly Return Sys to Svc as Required by Omp 7-1 IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20237B1561998-08-0707 August 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:Licensee Failed to Establish Procedural Guidance for Abnormal Vent Path Used for Degassing Unit 1 Volume Control Tank to Environ IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-030, on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event1998-06-0404 June 1998 PNO-II-98-030:on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event ML20249A2451998-06-0404 June 1998 Notice of Violation from Insp on 980413-24.Violation Noted: Procedure Investigation Processes 2-M96-1440 & 0-M97-1933 Were Not Initiated within 24 H After Realization That Procedure Investigation Process Should Have Been Written IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6051998-04-0606 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Licensee Failed to Adequately Establish or Adhere to Procedural Guidance for Repair of Two safety-related Containment Isolation Valves as Evidenced ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security ML20203F5921998-02-23023 February 1998 Notice of Violation from Insp on 980105-08.Violations Noted: Licensee Failed to Follow Procedures for Security Badge & Access Control IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys IR 07100102/20120131998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Inadequate Measures Were Provided for Verification or Checking Adequacy of Design Documents ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1571998-01-0505 January 1998 Notice of Violation from Insp on 971205-06.Violation Noted: an Event Occurred on 971202 in Which Person or Persons Made Credible Threat to Commit or Cause Significant Physical Damage to Power Reactor & Not Reported within One Hour ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg ML20203M4471998-01-0505 January 1998 Errata to Notice of Violation for Insp Repts 50-369/97-19 & 50-370/97-19.Statement in Nov,Page 2, Under Authority of Section 182 of Act.42USC 2232,this Response Shall Be Submitted Under Oath or Affirmation, Was Incorrect IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N4701997-10-20020 October 1997 Notice of Violation from Insp on 970810-0920.Violation Noted:On 960420,ET Guidelines,Apps C & E Were Not Implemented as Evidenced By;Resolution Analyst Revised & Overruled Reexam Request for SG 2A Tube R7C60 ML20212A0361997-10-0808 October 1997 Notice of Violation from Insp on 970712-0827.Violation Noted:As of 970717,10 of 48 Ice Condenser Inlet Doors on Unit 2 Required Initial Opening Torque in Ixcess of 675 inch-pound Operability Limit ML20211K9431997-09-26026 September 1997 Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19973001997-08-29029 August 1997 NRC Operator Licensing Exam Repts 50-369/97-300 & 50-370/97-300 (Including Completed & Graded Tests) for Test Administered on 970728-31.Exam Results:Five SRO & One RO Passed Exam & One SRO Failed Exam IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20217R1161997-08-18018 August 1997 EN-97-076:on 970818,order Prohibiting Involvement in NRC- Licensed Activities for a Period of One Year Will Be Issued. Action Based on Investigation Conducted by Oi,Which Determined Falsification of QA Document PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened1997-08-0909 August 1997 PNO-II-97-051:on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149L5701997-07-28028 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:Procedure IP/0/A/3250/12B Inadequate to Provide Sufficient Guidance to Properly Test Emergency Diesel Generator Sequencer Logic Circuitry ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149G6771997-06-16016 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Procedure PT/1/A/4600/014D Was Inadequate in Providing Sufficient Guidance to Bypass Properly RPS Functions of an Inoperable N-41 Channel to Permit Testing of Channel N-42 IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148B9621997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Prior to 961130,activities Affecting Quality,Not Accomplished in Accordance W/Instructions,Procedures or Drawings IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support 1999-08-26
[Table view] |
Inspection Report - McGuire - 1988020 |
---|
|
|
Text
- .
UNITED STATES
- ,f -
NUCLEAR REGULATORY COMMISSION
[
'
9'o,f
, REGION il g'
j 101 MARIETTA STREET. 's ATLANTA, GEORGIA 30323
.
.....
Report Nos. 50-369/88-20 and 50-370/88-20 Licensee: Duke Power Compary 422 South Church Street Charlotte, NC 28242 Facility Name: McGuire Nuclear Station 1 and 2 Docket Nos.: 50-369 and 50-370 License Nos.: NPF-9 and NPF-17 Inspection Conducted: June 25,1988 - July 22,1988 i Inspectors: #1/f/ b , ~ [
DatV Signed W.O'rdirs, Senior)residentInspector
, WJ W f 4atV Signed jDT tM1's'oT1, ~ResidptInspector
,/ A1W/
T. Cr'~tiau, Ris dent Ins ector f
Da~tV Signeid Approved by: /A + MbAn T, K. Pedbles,~ Section Chief'
, 8"//4 @
Date' Signed Division of Reactor Projects SUMMARf Scope: This routine unannounced inspection involved the areas of operations safety verification, surveillance testing, maintenance activities, and follow-up on previous inspection finding Results: In the areas inspected, two violations were identified. Activities observed indicate a weakness in determining system status during ,
outages (see paragraph 8). A strength was noted in licensee response to inspector concerns generated from events occurring at other facilities (see paragraph 10).
Within the areas inspected, the following violations were identified:
Inadequate procedure / failure to follow procedure with respect to draining of steam generator s without blocking the automatic start of an auxiliary feed pump, and to removing the 28 off site busline from service without an adequate procedure and without properly aligning switch gear assemblie Failure to meet the intent of Technical Specifications with respect to the McGuire Safety Review Group surveillance of plant activitie '
'
h8300240geogg9 g ADOCK 05000369 PNU
.____ _, _ _ _ _ _ _ . . _ . __ . . _ . . . ._ . . _ _
.
.
.. .
.
.
REPORT DETAILS Persons Contacted Licensee Employees
- N. Atherton, Compliance D. Baxter, Operations L. Bost, Design Engineer J. Boyle, Superintendent of Integrated Scheduling S. Copp, Planning Engineer
- J. Foster, Health Physicist
- B. Hamilton, Superintendent of Technical Services
- S. LeRoy, Licensing, General Office T. McConnell, Plant Manager W. Reeside, Operations Engineer
- M. Sample, Superintendent of Maintenance R. Sharp, Compliance Engineer
- A. Sipe, Safety Review Group Chairman
- J. Snyder, Performance Engineer
- B. Travis, Superintendent of Operations R. White IAE Engineer Other licensee employees contacted included construction craftsmen, technicians, operators, mechanics, security force members, and office personne "Attended exit interview Unresolved Items An unresolved item (UNR) is a matter about which more information is required to determine whether it is acceptable or may involve a violation or deviatio There were no unresolved items identified in this repor . Plant Operations (71707, 71710)
The inspection staff reviewed plant operations during the report period to verify conformance with applicable regulatory requirements. Control room logs, shift supervisors' logs, shift turnover records, and equipment removal and restoration records were routinely perused. Interviews were conducted with plant operations, maintenance, chemistry, health physics, and performance personne Activities within the control room were monitored during shifts and at shift changes Actions and/or activities observed were conducted as prescribed in applicable station administrative' directives. The complement of licensed personnel on each shift met or exceeded the minimum required by Technical Specification l
, ._ _ ._ _ _ -
.
t ,
,
.
'
.
Plant tours taken during the reporting period included, but were not-limited to, the turbine buildings, the auxiliary building, Units 1 and 2 electrical equipment rooms, Units 1 and 2 cable spreading rooms, Unit 2 reactor building, .and the station yard zone inside the protected-are ,
The Unit 2 reactor builaing was walked down prior to entry into mode 4 ;
following the refueling outage. Several minor deficiencies were noted l which the licensee took action to correc Overall - cleanliness was adequat ;
!
'
Ouring the plant tours, ongoing activities, housekeeping, security, equipment status _and radiation control practices were. observe ' Unit 1 Operations Unit 1 began the period at full power. On June 26 at 12:05 p.m., the unit sustained a 50% load rejection due to the loss of one main feed pump. A non-safety load center, SMXL, de-energized due to several electrical ground This load center powers the main feed flow elements which control the feed pumps' recircult +. ion valves. The
de-energized flow elements indicated zero flow causing the recire ,
valves to fully open. This created an actual high flow condition causing feed pump suction pressure to decreas One feed pump tripped on low suction pressur Sufficient suction prt ssure
] remained to supply the remaining feed pum Operaters Gnually '
star'.ed both motor driven auxiliary feed pumps to assist in maintaining steam generator levels during the transient. The unit returned to full power early the next day. Except for several brief '
periods of load following, the unit remained at full power for the remainder of the period, l
- - i 1 Unit 2 Operations Unit 2 began the period in the end-of-cycle 4 refueling outage which commenced on May 27. The outage is on schedule with a planned return to service on July 2 ]
On June 24, with the unit defueled, a loss of off site power i
occurre In preparation for maintenance on the B off site power j switch gear, plans were made to realign incoming power such that the
~
A busline would be supplying all loads. Normally, each busline supplies two 6.9 KV buses, but alternate alignments can be made to ,
allow a single busline to supply all four 6.9 KV base T o prepare !
for the maintenance, the two 6.9 KV buses normally supplied by the B
busline were to be aligned to their alternate source, the A buslin With this intent, the control room operator mistakenly aligned the
two 6.9 KV buses normally supplied by the A busline to their alternate source, the B buslin Therefore, the B busline, not A, was supplying all electrical powe The B busline Primary Circuit Breakers (PCB) were then opened from the switchyard causing all off Ie
-- -
- , , , - - - - - . - - - - ~ , - - . , I
,, - _ . -
- - - . , - - - , , , -
. ..
+ -
.
l
.
. :
3 ;
.. r i
site power to be lost to Unit 2. Both emergency diesel generators (DG) automatically started to supply power to the emergency _ buses, y however, the A DG tripped on an indicated overspeed condition. (The-licensee determined later that an actual overspeed did not occur, but a was simulated by blockage _ in a pressure instrument sensing lin This problem was corrected during on going outage maintenance.)' _No other abnormalities occurred during the even l e
The licensee considers the cause of~the loss of off site power to be-attributed to the operator's error. .The operator was performing a section of operating procedure OP/2/A/6350/05, AC Electrical Operation Other Than Normal Lineup, when initially aligning the 6.9 r 'KV buses. This procedure provides generic instructions for switching any of the four 6.9 KV buses to their alternate power suppl It i refers to the 6.9 KV buses as the "applicable" or "respective" buses i and to the byslines as the "normal" or "standby" power. supplies so
'
that this single procedure can provide instructions for any of the numerous lineups possible. In order to successfully use this procedure, the operator must have additional- instructions, either j written or verbal, to provide the desired final lineup. In this case t the desired lineup was provided by the operator's supervision. The
'
licensee considers that the instructions to the operator were ;
accurat The operator understood the intended alignment, but
- performed the opposite action than he had intended to perform. The control board mimic bus for this system is accurate, removing any !
cause for confusion as to which breakers should have been operated to ,
make the desired lineup. A second operator made a similar error in that an entry into the reactor operators' log was made stating that :
- the lineup was about to be performed. The lineup described was the l same incorrect lineup that the first operator was makin *
, The general operating proceaure used by the operator does not provide ;
)i instructions for operating the PCBs to de-energize the busline once ;
the initial lineup is complet Investigation by the inspector :
i revealed that a second document, Removal and Restoration (R&R) tagout 28-616, was specifically prepared for this maintenanc This document provided specific sequence and components for tagging in
'
- order to ensure that the B busline remained de-energized during the
,_ maintenanc R&R's are considered by the licensee to be procedures 1-and are to be followed as such. As stated in Operations Management '
- Procedure 2-17, Tagout/ Removal and Restoration (R&R) Procedure, one
, of the purposes of R&Rs is "to allow the removal and restoration of )
equipment to be accomplished in a specific manner by directing the
'
sequence of the steps involved in repositioning the equipment and indicating the desired removal and return position." In this case, the R&R did not direct the sequence of steps involved to' achieve the
.
desired alignment but only provided specific instructions for tagging j once the busline was de-energized. It referred to the generic
! instructions contained in the operating protetture (presumably to j align the 6.9 KV buses) but did not provide the desired alignment of 1 the buses nor did it provide for opening the PCB . .
.
'
'
>
The NRC considers that the operator did not follow the operating procedure _ in that the incorrect 6.9 KV buses were aligned to their '
alternate power supplies. Also both the operating procedure and the R&R procedure were inadequate in that neither specified the desired alignment of the 6.9 KV buses nor provided for opening the PCBs. A~
-
more specific procedure would have aided the operator: in the-repositioning of equipmen This constitutes two examples of a violation of TS 6.8.1 for failure to follow procedures and for an inadequate procedure. (Violation 370/88-20-01) 1 1 While draining the Unit 2 steam generators on July 18 to establish proper chemistry for heatup, the auto start signal to the turbine driven auxiliary feedwater (TDCA) pump was received opening the steam admission valves SA-48 and SA-49 and isolating blowdown. The Unit was'in mode 5 at the time with no steam pressure so the TDCA pump did ,
not inject water into the steam generator The steam generators were being drained in accordance with OP/2/A/6250/MA, Steam Generator Cold Wet Layup Recirculation. Step :
2.10 of the prot.edure directed IAE to defeat the feedwater isolation '
signals but no step was included to defeat the TDCA auto start signal on low-low steam genvator level. The procedure was subsequently changed to block the auta start signal and the systems were returned to norma ,
This event demonstrates that OP/2/A/6250/03A was inadequate in that .
performance of the OP resulted in an unplanned ESF actuation. This !
constitutes a third example of a violation of TS 6.8.1 for an inadequate procedure (Violation 370/88-20-01). l Surveillance Testing (61726) l 4 Selected surveillance tests were analyzed and/or w;enessed by the l
inspector to ascertain procedural and performance adequacy and conformance I with applicable Technical Specification Selected tests were witnessed to ascertain that current written approved
,
procedures were available and in use, that test equip 6ent in use was 2 calibrated, that test prerequisites were met, that system restoration was ,
completed and test results were adequat Detailed below are selected tests which were either reviewed or witnessed: i MP/0/A/7150/7 On Line Ice Basket Weight Determi.a. ation Process PT/0/A/4200/18 Ice Bed Analysis TT/2/A/9100/269 DG Starting Air / Instrument Air Blackout Header
<
Test
No violations or deviations were identifie I
-. . - - - . , -- ,s ,.
. .
.
.
'
,
! Maintenance Observations (62703)
'
i Routine maintenance activities were reviewed and/or witnessed by the s resident inspection staff to ascertain procedural and performance adequacy and conformance with applicable Technical Specification The selected activities witnessed were examined to ascertain that, where-applicable, current written approved procedures were available and in use, that prerequisites were met, that equipment restoration was completed and maintenance results were adequat No violations or deviations were identifie . Licensee Event Report (LER) Followup (90712,92700)
The following LERs were reviewed to determine whether r'aporting require- ,
ments have been met, the cause appears accurate, the corrective actions appear appropriate, generic applicability has been considered, and whether the event is related to previous event Selected LERs' were chosen for
! more detailed followup in verifying the nature, impact, and cause of the
- event as well as corrective actions taken.
(CLOSED) LER 370/86-02: Reactor Trip on Intermediate Range High Flux !
Signal During Unit Shutdown. This item is associated with Unresolved Item 370/85-46-01 discussed in paragraph 7 of this repor This item is close '
(CLOSED) LER 369/86-14: Train B Safety Injection In Mode This event
, involved an inadvertent safety injection while testing reactor trip breakers. The licensee has made appropriate procedure changes to prevent !
recurrenc This item is closed.
, Follow-up on Previous Inspection Findings (92702)
'
l The following previously identified items were revirwed to ascertain that the licensee's responses, where applicable, and licensee actions were in compliance with regulatory requirements and corrective actions have been complete Selective verification included record review, observations,
- and discussions with licensee personne (CLOSED) Unresolved Item 370/85-46-01
- Intermediate Range Detector Not
- Calibrated Following Replacement. This item involved a reactor trip
.
caused by an intermediate range detector during a plant shutdown. The detector at fault had been recently replaced and subsequent calibration was deemed unnecessary by the licensee due to the increased sensitivity of the new detector. As a result, the intermediate low power reactor trip
'
i set points were not verified. The safety significance of this event was small in that more conservative set points resulted. The Itcensee has
'
changed the procedure for detector replacement to require setpoint
calibration in all case This item is closed, i
l i
<
_ _ _ _ _ _ _ _ _ _ _ _
,
. .
.
.
.
! Maintenance of System Status During Outages During this reporting period two problems developed in which inadequate maintenance of system status contributed to the cause: ,.
I The first example involved an inadequate containment integrity verifi-cation. Prior to commencing Unit 2 fuel load (entering Mode 6) a containment integrity verification was performed. During this process valve NV-245, charging line containment irolation valve, was determined to be shut by the operator's observation cnat the Operator Aid Computer r (OAC) indicated that it was shut. Neither the red or green control board indicators were illuminated which prompted the operator to consult the j OAC. The licensee considers this to be an acceptable practice in normal
~
situations. The valve, however, was undergoing maintenance, was disassem-bled and was unable to provide containment integrity. The OAC indicated the valve to be shut because the valve actuator remained in the shut position - following disassembl Fortunately, a check valve in the same i line provided a second containment integrity barrier. Upon discovery of the problem, Operations took action to revise the containment integrity procedure to require additional verification if the OAC is the only means available for determining valve positio This corrective action is appropriate for this specific occurrence, but does not address the
! underlying problem of entering an operational mode without meeting all
'
the mode change requirements. In this case, Operations did not have means for determining that all maintenance required to be complete was actually ;
complete '
The second example involved a test of the Unit 2 diesel generator starting air syste During the Unit 2 outage, a test (TT/2/A/9100/269) was performed to assess the diesel starting air (VG) system's ability to I supply the blackout header of the instrument air (VI) system. The first J phase of this test consisted of lining up VG to the VI blackout header in i a static mode and monitoring VG and VI pressure to determine the VI demand I on V The test was deemed successful when very little VI demand l leakage occurred. The licensee had expected more significant leakage and ' '
was surprised at the results. The VI blackout header supplies pressurized
'
air to numerous air operated valves whose actuators are known to'have air leaks. Regardless of the unexpected results, plans were undertaken to i i assess system performance in a dynamic state. The inspector conducted a I walkdown of the portions of the systems involved with the test and discovered that most of the VI blackou't header was isolated for outage maintenance. Since most of the valve actuators supplied by the blackout header were isolated, the test did little more than demonstrate that the ,
VI piping did not leak. The licensee was unaware of the system status {
prior to the tes When it was reperformed later in the outage, I significant',y dif ferent results were obtaine : In these two examples it is obvious that actual system status was not i know The NRC considers the licensee's inability to accurately track maintenance during an outage to be a weakness. The licensee has
recognized this weakness and stated that steps are being taken to improve, i
I *
._
.
. .
.
According to the licensee the "Projects 2" computer program, when fully l
implemented, will provide a means by which outage maintenance items can be tracked to assess the status of the maintenance at any time. The NRC will ,
continue to monitor tha licensee's performance in this area.
, NAMCO Limit Switch Environmental Qualification Concerns
,
A concern arose at the Catawba Nuclear Station regarding the environmental l qualification (EQ) of NAMCO limit switches. Identical limit switches are
'
installed on numerous safety and non-safety related vahes at McGuir The concern was that incorrectly installed gaskets on the switch covers
!
would permit moisture to enter the switch internals thereby possibly
!
shorting electrical contacts. A consequence could be that safety related valves that shut on an Engineered Safety Features (ESF) actuation would reopen when the safety signal is reset instead of remaining in the safety positio The licensee conducted an inspection of all installed NAMCO limit switches on Unit 2. Four were found with incorrectly installed gaskets and repaired. Design Er;ineering analyzed that these four would have had no adverse impact dur i ng an ESF actuatio Due to Unit 1 being in operation, not all switches were accessible for ,
inspection. Therefore, the licensee conducted a consequence analysis for .
'
i all Unit 1 inaccessible limit switches. In one case compensatory measures l were taken: Valve 1RV76A is one of several valves that provide Phase B f inside containment isolation for the containment ventilation headers. The seismically designed boundary for this system is limited to the piping l between these valves and the outside containment isolation valve Assuming a seismic event and a single active failure of the outside containment isolation valve (s), the potential exists for radioactive release if these valves failed to remain shut upon resetting the Phase B '
containment isolation signa The licensee made compensatory Emergency Procedure changes to verify that 1RV76A remains shut after Phase B rese '
Additionally, the corresponding outside containment isolation valve will i
,
be assured shst prior to the phase B signal being rese The licensee l stated that 1RV76A will be inspected and/or repaired at the next Unit 1 trip or during the next outage. All remaining inaccessible limit switches '
were deemed to be of no risk to safety by the licensee's consequence analysis. All inaccessible switches will be inspected either at the next unit trip or during the next unit outage. Several accessible Unit i limit switches were found with incorrectly installed gaskets and were repaired t but in each case the licensee determined through consequence analysis that there were no past safety concern The licensee documented all :
conclusions in a Justification for Continued Operation (JCO).
,
l u____________________________________-________-__ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ - - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _
_
i
. + .
i
. 1
)
i I
1 Emergency Core Cooling System (ECCS) Sump Line Verification During the inspection period, the Resident Inspection Staff informed the McGuire plant manager of an incident at another facility involving debris in a containment sump line which caused a loss of pump suction during a 2 test. McGuire unit two was in the final stages of a refueling outage, which is the only time an inspection of similar lines could be performe During a resultant review of the documentation associated with the maintenance history of the lines, the licensee noted that maintenance on a valve on one of these lines had resulted in the detection of a piece of debris in the valve seat.
! The licensee performed an inspection of the applicable piping. No debris
,
was found. A similar inspection is to be performed on Unit I during the l upcoming 1988 refueling outage.
t The effort expended to resolve the status of the McGuire. sump suction lines is indicative of a positive attitude toward safety and is considered a strengt ,
11. McGuire Safety Review Group Operation l Background In report 50-369,370/88-14 it was reported that on November 30, 1987, a l Diagnostic Evaluation Team (OET) began an initial two-week evaluation at the station and corporate office !
'
The DET report was transmitted to the licensee on April 8,1988. One of I the findings documented in that report concerned the McGuire Safety Review Group (MSRG). Specifically, it was determined that (1) the MSRG had not been performing all functions identified as part of the McGuire licensing basis and resultantly did not appear to have been meeting the intent of McGuire TS 6.2.3.3 and 6.2.3.4, and (2) the scope and focus of current MSRG activities had evolved to the point that the majority of the group's time was spent on investigation of plant events, with little or no time spent on surveillance of plant operations and maintenance activitie Resident Inspector Staff Review The resident inspection staff review of the MSRG and requirements pertaining thereto included a review of: Station Directive 3.1.32 Supplement 4 to the McGuire Safety Evaluation Report (SER) Charter of the Station Safety Review Group (SSRG) Section 6.2.3 of the McGuire Station Technical Specifications
!
!
l
. .
- .
l'
. . .
.
9 >
. :
i
, The DET Team Report The results of an Office of Nuclear Reactor Regulation (ONRR) review of commitments relative to the MSRG
-
,
Based on a review of the references listed above and discussions with ONRR and NRC Region II staff, the resident staff review was refined to deal ;
exclusively with MSRG compliance with applicable Technical Specification Discussions with the MSRG chairman, review of the SRG Work Assignment Log i
'
covering the period of 1986 through the present, and review of the Inplant Reviews conducted by the MSRG during that time, led to the following conclusions: ,
, The majority of the MSRG's time is spent generating incident investigation reports (IIR's). The Work Assignment Log revealed that during the period 1986 - June 1988, 203 IIR's were generated but only ,
15 Inplant Reviews were performed. (Inplant Reviews are independent reviews of station activities, ind are not necessarily coupled with l
IIR's; these come closer to meeting what was intended by Three Mile !
'
Island (TMI) action item I.B.1.2). This reveals that 93% of the L MSRG's efforts were devoted to the generation of IIR's.
! Other than those reviewed in the course of performing an incident !
investigation, procedures are not reviewed programmatically to t determine adequacy.
l !
i Other than those reviewed in the course of performing an incident ;
investigation, design changes are not programmatically reviewed to l insure all safety concerns are properly addressed, j
l Ultimately, Technical Specification 6.2.3 Station Safety Review Group, is
- the culmination of the negotiations of commitments relative to TMI Action i Item I.B.I.2. To reiterate, the intent of an ISEG (MSRG) is to examine l plant operating characteristics, NRC issuances, Licensing Information ;
I Service advisories, Licensee Event Reports, and other appropriate sources '
which may indicate areas for improving plant safety. It is expected that this group develop detailed recommendations for revised procedures, equipment modifications, or other means of achieving the goal of improved i plant safety. A principal function of the independent safety engineering l group is to maintain surveillance of. plant operations and maintenance activities to provide independent verification that these activities are performed correctly and that human errors are reduced as far as practica These findings were discussed with the Nuclear Safety Review Board (NSRB)
and MSRG Chairmen on June 13, 1988. The NSRB Chairman indicated-that the current operation of the SRG's at the Duke facilities was patterned after the description of an ISEG in NUREG 0800, Standard Review Plan, (SRP)
Section 13-4., and that the resident's findings were a redefinition of the requirement l
. .
.
.
I 10 l
l A subsequent re-review of that section of the SRP confirmed the following: The ISEG is to perform independent reviews of plant operations in accordance nith the guidelines of item I.B.1.2 of NUREG-0660 and NUREG-073 The groups function is to examine plant operating characteristics, NRC issuances, Licensing Infc mation Service advisories, and other appropriate sources of plant design and operating experience information for areas for improving plant safety; and to maintain surveillance of plant operations and maintenance activities to provide independent verification that these activities are performed correctly and that human errors are reduced as far as practicable.
j The group .is _ to perform independent reviews and audits of plant i
activities including maintenance, modifications, operational
! problems, and operational analysis, and aid in the establishment of pragrammatic requirements for plant activitie Based on the resident inspection staff review, it was concluded that the intent of technical specifications 6.2.3.3 and 6.2.3.4 were not being met by the current operation of the MSR This was identified as an unresolved item (50-369,370/88-14-03) pending results of a meeting which was held on July 18, 1988. The maeting which involved participants from ONRR, NRC Region II, and the licensee was held in order to conclusively identify the intent of T.S. 6.2.3.3 and 6.2.3.4 l and to determine if the current operation of the MSRG meets those requirement Conclusions Based on the results of the July 18, 1988, meeting, and the input from an ONRR staff representative present at the meeting and involved in the generation of the requirements, the following conclusions were reached: The current operation of the MSRG does not meet the Intent of .2.3.3 which requires that the MSRG maintain surveillance of plant activities to provide independent verification that these activities are performed correctly. This finding is predicated on the review of the MSRG Work Assignment Log and discussions with the MSRG chairman and NSRB Director. During the period spanning 1986 until June of 1988, the MSRG did not perform routine independent surveillance of plant operations and maintenance activities to provide independent verification that these activities were performed correctly. The NRC does not consider the performance of Incident Investigations to adequately satisfy this requiremen This is a Violation of T.S. 6.2.3.3 (50-369, 370/88-20-02)
.
. o . i
.
>
l_
l The current operation of the MSRG does not appear to meet the intent l l
of T.S. 6.2.3.4 which requires that the MSRG make detailed recom-
'
mendations for revised procedures and equipment modifications to the !
'
Director of the Nuclear Safety Review Board. The licensee indicated that since T.S. 6.2.3.4 is titled "Authority" they are authorized to perform the actions of T.S. 6.2.3.4 but not required to perform the ,
This area will remain Unresolved pending the resolution of the .
,
'
licensee's position relative to their interpretation of the require-ment and discussion with ONRR staff. (50-369/88-14-03) ,
i 1 Information Meetings with Local Officials (94600)
On July 19, 1988 a seminar was held with local public official The meeting was held with the cooperation of the licensee in the McGuire Nuclear Station Energy Explorium auditorium and was comprised of two session :
The first session was a private meeting between NRC representatives and the local officials. The objectives of the session were: ;
To familiarize public officials with the mission of the NR '
To introduce key NRC personnel associated with the McGuire facilit To discuss lines of communication between the public officials and the NR To discuss the status of the facility and related community concerns with public official Representatives from four surrounding counties were in attendance as well as the NRC Section Chief responsible for McGuire, the NRC Region II Director of State and Government Affairs, the Resident Inspector from the Catawba facility and the McGuire Resident Inspector The second session was comprised of a private meeting / plant tour with the McGuire Plant Manager.
I Following the tour, Duke sponsored a working dinner which was attended by l local officials, Duke and NRC personnel.
l The meeting, which was the first of this format in Region II was I l successful in conveying the necessary information and improving public !
I relation l l
13. Containment Spray Heat Exchanger 2B !
On July 15 a heat balance test was run on containment spray (NS) heat exchanger 2B in accordance with PT/2/A/4208/048, Train 2B Containment l
Spray Heat Exchanger Performance Tes Test results indicated that heat transfer capability had decreased to approximately one million BTV/hr-F l (approximately 35 percent of design but 75 percent of what is actually l
- i l
. . __
. . .
.
t
-
necessary according to the FSAR). FSAR section 6.2.1.1.3.1 specifies an NS heat exchanger capacity of 1.47 million BTV/hr-F. Test results from May 25, 1988, indicated heat transfer. capability at approximately 45 percent of design, The licensee has written an operability determination stating that the heat exchanger is c.onsidered operable based on the ice :
inventory of the ice condenser and the current heat transfer capability of ;
the NS heat exchangers. The licensee stated that calculations show peak containment pressure is predicted to remain below 15 psig.
Following the July 15 heat balance test, the service water side of the heat exchanger was cleaned but only minor amounts of material was foun The heat balance was again run on July 19 and. the results were very similar to the July 15 tes The licensee intends to inspect the primary side divider plate gasket to determine if bypass flow is hindering performance and a new gasket design
,
is being evaluated. Several long term actions are also being evaluate The inspectors will continue to monitor the licensee's actions in this are . Exit Interview (30703)
The irispection findings identified below were summarized on July 22, 1988, a with those persons indicated in paragraph 1 above. The following items were discussed in detail:
i (OPEN) Violation 370/88-20-01, Inadequate Procedure / Failure To Follow 1 Procedure with respect to Draining of Steam Generators without blocking input to ESF actuation and with respect to Removing an Off Site Busline From Service without an adequate procedure or without properly aligning i switch gear assemblies (see paragraph 3). ;
l (OPEN) Violation 369, 370/88-20-02, McGuire Safety Review Group Failing To i l Meet Intent Of Technical Specification Requirements (see paragraph 11).
(OPEN) Unresolved Item 369, 370/88-14-03, McGuire Safety Review Group i Failing To Meet Intent Of Technical Specification Requirements (see paragraph 11). ,
Weakness with respect to determining the status of plant systems during outages (see paragraph 8).
'
Strength with respect to responding to inspector concerns arising from !
events occurring at other facilities (see paragraph 10). l
<
The licensee representatives present offered no dissenting comments, nor
did they identify as proprit.tary any of the information reviewed by the 1 inspectors during the course of their inspectio i j