IR 05000369/2012001

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for McGuire, Units 1 & 2, (IR 05000369-12-001 and 05000370-12-001)
ML13063A552
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 03/04/2013
From: Bartley J
NRC/RGN-II/DRP/RPB1
To: Capps S
Duke Energy Carolinas, Duke Energy Corp
References
IR-12-001
Download: ML13063A552 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2012001 AND 05000370/2012001)

Dear Mr. Capps:

On February 12, 2013, the NRC completed its end-of-cycle performance review of the McGuire Nuclear Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall McGuire Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance for both units during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. We will also be performing an Independent Spent Fuel Storage Installation Initial Campaign inspection; Temporary Instruction 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping; and operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4607 with any questions you have regarding this letter.

Sincerely,

/RA/

Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure: McGuire Nuclear Station Inspection/

Activity Plan (03/01/2013 - 06/30/2014)

cc w/encl: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/ JHB /RA/

NAME CRapp JBartley DATE 02/27/2013 02/27/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl: Alicia Richardson Charles J. Morris III Licensing Administrative Assistant Plant Manager General Office Mc Guire Nuclear Station Duke Energy Corporation Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Lara S. Nichols Jeffrey J. Nolin Deputy General Counsel Design Engineering Manager Duke Energy Corporation McGuire Nuclear Station Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution David A. Cummings Associate General Counsel H. Duncan Brewer General Office Organizational Effectiveness Manager Duke Energy Corporation McGuire Nuclear Station Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution Beth J. Horsley Wholesale Customer Relations Kenneth L. Ashe Duke Energy Corporation Regulatory Compliance Manager Electronic Mail Distribution McGuire Nuclear Station Duke Energy Corporation David A. Repka Electronic Mail Distribution Winston Strawn LLP Electronic Mail Distribution Kay L. Crane Senior Licensing Specialist County Manager of Mecklenburg County McGuire Nuclear Station 720 East Fourth Street Duke Energy Corporation Charlotte, NC 28202 Electronic Mail Distribution W. Lee Cox, III Joseph Michael Frisco, Jr. Section Chief Vice President, Nuclear Design Engineering Radiation Protection Section General Office N.C. Department of Environmental Duke Energy Corporation Commerce & Natural Resources Electronic Mail Distribution Electronic Mail Distribution M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution David A. Cummings (acting)

Fleet Regulatory Compliance & Licensing Manager General Office Duke Energy Corporation Electronic Mail Distribution Letter to Steven from Jonathan H. Bartley dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2012001 AND 05000370/2012001)

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Page 1 of 2 McGuire 03/04/2013 07:45:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 03/18/2013 03/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2013 03/22/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/18/2013 03/22/2013 IP 71151 Performance Indicator Verification ISI - UNIT 1 INSERVICE INSPECTION 2 1 03/25/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 04/01/2013 04/05/2013 IP 7111108P Inservice Inspection Activities - PWR ISFSI - ISFSI MAGNASTOR INITIAL CAMPAIGN 2 1, 2 06/10/2013 06/14/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EP - EMERGENCY PREPAREDNESS EXERCISE 1 1, 2 08/05/2013 08/09/2013 IP 7111401 Exercise Evaluation 1, 2 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification RP - RP PUBLIC RAD SAFETY BASELINE 2 1, 2 07/08/2013 07/12/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/08/2013 07/12/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/08/2013 07/12/2013 IP 71151 Performance Indicator Verification TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 1, 2 07/15/2013 07/17/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2 10/14/2013 10/18/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 10/28/2013 11/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications OL EXAM - INITIAL EXAM PREP 2 1 11/04/2013 11/08/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 1 2 1 12/02/2013 12/06/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2 2 1 12/09/2013 12/13/2013 V23402 MCGUIRE/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/31/2014 04/04/2014 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 04/07/2014 04/11/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 McGuire 03/04/2013 07:45:01 Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 06/09/2014 06/13/2014 IP 71152B Problem Identification and Resolution 1, 2 06/23/2014 06/27/2014 IP 71152B Problem Identification and Resolution OL EXAM - REQUAL INSP 1 1, 2 06/23/2014 06/27/2014 IP 7111111B Licensed Operator Requalification Program Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure