Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected: Portions of Inservice Insp Program,Unit 2 Insp Plan for Outage,Review of NDE Procedures & Exam Verifications
ML20247K141
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/31/1989
From: Blake J, Newsome R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20247K131 List:
References
50-369-89-29, 50-370-89-29, NUDOCS 8909210088
Download: ML20247K141 (7)


Text

. _ _ _ _

_

.___ -.

,

'

.

UNIT ED STATES

.)

.,.. ~

" P MGog'cf NUCLEAR REGULATORY COMMISS!ON -

-l M F:: -

'.

'.

.

nralON lll t

%

,1

,

t 101 MANETTA STREET, %W.

,..

'1 p

y

,

'

-

?

e-An AUTA, GEORGk A 30323,

,

%g _

[

,,

  • .++

h4 Report Nos.i 50-369/89-29 and '50-370/89-29 j

Licensee: Duke Power Company L

.422 South Church Street

'

!

Charlotte, NC' 28242 J

-

Docket Nos.: 50-369 and 50-370 License Nos.: HPF-9 and NPF-17 D

.

.

?

-

, Facility Name: McGuire 1 and 2

i

. Inspection Conducted: August 21 - August 25, 1989

,;

IP-2 9-Byc

2% ~

Inspe; tors:

m

.]

R.W.Newsome{

Date Signed

-

o

>

l Approved by:

}I v S $/ S W

'

  • 1

J y'Blake, Chief

. Date' Signed.

l

.

,,;

aferials and Processes Section

'

l

'

s engineering Branch

"

]

Division of Reactor Safety

^

,=

SUMMARY Scope:

' This routine, announted inspection was conducted on-site in areas of Inservice Inspection (ISI).

The inspection included a review of portions of the ISI program and the Unit 2 inspection plan for this outage; reviews. of

~

nondestructive examination (NDE)

procedures; independent examination verifications; reviews of NDE personnel qualifications; reviews of NDE equipment

,

I calibration documentation; and, a review of completed NDE examination data.

Results:

In the areas inspected, violations or deviations were not identified.

All areas inspected indicated adequate control and implementation of the ISI

program.

8909210088 690*11 -

ppR ADOCK 0000'g'

o

'

~ _ -

_ _ _ _ _ _. -

_____..._._._._._____.__.__m______

_- _. - _.

_ __ _ _ _-_

-.

_

. _ _ _ _

_

- -.

. _ _

_ _ _ _ - _ _

_

..

__

_ _ _ _ -

.

,

.

PEPORT DETAILS 1.

Persons Contacted Licensee Employees

  • J. Day, Compliance, Associate Engineer
  • W. Goodman, Quality Assurance (QA) Technical Support Supervisor T. Hilderbrand, Eddy Current (EC) Examination Supervisor P. Helton, QA, ISI
  • T. Mathews, Design Site Office
  • T. McConnell, Station Manager
  • R. Sharpe, Compliance Manager
  • A. Sipe, McGuire Safety Review Group Chairman
  • G. Underwood, QA, ISI Other licensee employees contacted during this inspection included craftsmen, engineers, technicians, and administrative personnel.

NRC Resident Inspector K. Van Doorn, Senior Resident Inspector

  • Attended exit interview I

Acronyms and initialisms used throughout this report are listed in the last l

paragraph.

2.

Inservice Inspection The inspector reviewed documents, records and examination activities, as indicated below, to determine whether ISI was being conducted in accordance with applicable procederes, regulatory requirements, and licensee commitments.

The applicable code fnr ISI is the American Society of Mechanical Engineers Doiler and Pressure Vessel (ASME B&PV) Code,Section XI,1980 edition with addenda through Winter 1980.

Duke Power Company (DPC) NDE personnel performed the liquid penetrant (PT), magnetic particle (MT), and radiographic (RT) examinations, while Babcock and Wilcox (B&W) personnel, assisted by DPC personnel, conducted the majority of the ultrasonic (UT) examinations. Steam generator (SG) tubing eddy current (EC)

examination data collection was accomplished by DPC personnel with B&W personnel performing the primary data analysis and Zetec and DPC personnel performing a secondary data evaluation.

a.

ISI Program Review, Unit 2 (73051)

The inspector reviewed the following documents relating to the ISI program to determine whether the plan had been approved by the

_ _ _ _ _ - _ - _ _. _ _ _

_ - _ _ _ _ _ _ _ _ -

_

_

_

. _ _ _ - _ _ _ _ _ _ _ _ - - _ _

.

.

.

'

I

. licensee and to assure that procedures and plans had been established (written, reviewed, approved and issued) to control and accomplish the following applicable activities:

organizational structure including qualifications, training, responsibilities, and duties of personnel L

responsible for ISI; audits including procedures, frequency, and qualification of personnel; general Quality Assurance requirements including examination reports, deviations from previously established program, material certifications, and identification of components to be covered; work and inspection procedures; control of processes including suitably controlled work conditions, special methods, and use of qualified personnel; corrective action; document control; control of examination equipment; quality records including documentation of indications and NDE findings, provisions to assure legibility and retrievability, review of documentation, and corrective action; scope of the inspection including description of areas to be examined, examination category, method of inspection, extent of examinations, and justification for any exception; definition of inspection interval and extent of examination; qualification of NDE personnel; and, controls of generation, approval, custody, storage and maintenance of NDE records.

J Inservice Inspection Plan McGuire Nuclear Station

-

Units 1 and 2, Volume 1, Revision 11 QA-125(R4)

Problem Investigation Process

-

QA-516(RI)

Evaluation of ISI Indications j

-

QCH-3 (R2)

Weld Preparation For Inservice Inspections

!

-

b.

Review of NDE Procedures, Units 1 and 2 (73052)

(1) The inspector reviewed the procedures listed below to determine whether these procedures were consistent with regulatory requirements and licensee commitments.

The procedures were also reviewed in the areas of procedure approval, requirements fer

qualification of NDE personnel, and compilation of required l

records; and, if applicable, division of responsibility between

the licensee and contractor personnel if contractor personnel are involved in the ISI effort.

-

NDE-44 (R8)

Ultrasonic Examination of Bolts, Studs, Bushings and Threads in Flanges for Preservice and Inservice Inspection 151-119 (R8)

Ultrasonic Examination of Stainless

-

Steel and Nickel Base Alloy Weld Seams 151-130 (R24)

Ultrasonic Examination of Vessel Welds

-

and Nozzle Inside Radius Sections

-_

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ - _.

-.-

- _ _ _ _

_ _ _ _ _ _ _ _ _ _

_ _ - _ _ _ _ _

_

-

_ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _

.

.

~

.

.

.

..

Eddy Current Analysis Guidelines For McGuire Nuclear Station

-

Units 1 and 2 (RO)

NDE-12(R7)

Ceneral Radiography Procedure for

-

Preservice and Inservice Inspection NDE-98(RS)

Liquid Penetrant Examination Technique

-

(Color Contrast, Solvent Removable Method) for Preservice and Inservice Inspection All procedures. listed above have been reviewed during previous NRr. inspections.

Only current revisions were reviewed during

.

this inspection.

(2) The inspector reviewed the Ultrasonic (UT) procedures to ascertain whether they had been reviewed and approved in accordance with the licensee's established QA procedures.

The procedures were also reviewed for technical adequacy and conformance with ASME,Section V. Article 5 and other licensee commitments / requirements in the following areas:

type of apparatus used; extent of coverage of weldment; calibration requirements; search units; beam angles; DAC curves; reference level. for monitoring discontinuities; method for demonstrating penetration; limits for evaluating and recording indications; recording significant indications; and, acceptance limits.

(3) The inspector reviewed the Eddy Current -(EL) procedure for technical content relative to:

multichannel examination unit, multichannel examination indication equipment is specified, examination sensitivity, material permeability, method of examination, method of calibration and calibration sequence, and, acceptance criteria.

(4) The inspector reviewed the Radiographic (RT) procedure to determine whether it contained sufficient information to assure that the following parameters were specified and controlled within the limits permitted by the applicable code, or any other l

specification requirement:

type of material to be radiographer; material and weld surface condition requirements; type of rcdiation source, effective focal spot or effective source size; film brand or type; number of films in cassette; minimum source to film distance; type and thickness of intensifying screens and l

' --

filters; quality of radiographs; film density and contrast for single and composite viewing; use of densitometers for assuring compliance with film density requirements; system of radiograph identification; use of location markers; methods of reducing and testing for back-catter; selection of penetrameters including penetrometer placement; number of penetrameters; shims under penetrameters; radiographic technique for double wall viewing; and, evaluation and disposition of radiographs.

_ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ - _ _ _ - - _ _ _ _ _ - _ _

- _ _ _ - _ - - -.

c_- __ - _

_ __ _ __

,

I

'

l

.

t

-

.

(5) The inspector reviewed the liquid penetrant (PT) procedure to ascertain whether it had been reviewed and approved in accordance

,

with the licensee's established QA procedures. The procedure was l

also reviewed for technical adequacy and conformance with ASME,Section V, Article 6, and other licensee requirements in the i

l following areas:

specified method; penetrant materials analyzed for sulfur; penetrant material identification; penetrant I

materials analyzed for total halogens; surface temperature; acceptable pre-examination surface conditioning; method used for pre-examination surface cleanir,g; surface drying tin.e prior to penetrant application; method of penetrant application; penetrant dwell time; method used for excess penetrant removal; if

i

'

applicable, surface drying prior to developer application; type of developer; examination technique; evaluation techniques; and, procedure requalification.

c.

Observation of Work and Work Activities, Unit 2 (73753)

l The inspector was unable to observe in-progress examination activities during this inspection because all examinations had been completed.

The inspector conducted independent examination verifications, using the licensee's equipment, in the areas of radiography and cddy current.

The inspector also reviewed NDE equipment certification records and reviewed NDE personnel qualifications for personnel that

,

l had been utilized during the required ISI examinations during this

,

outage.

The independent verifications and reviews conducted by the l

inspector are documented below.

(1) The inspector independently evaluated 131 radiographic films for the 5 Main Steam, 3 Main Feedwater, and 2 Auxiliary Feedwater systems pipe welds that were radiographer under the licensee's ISI program.

These evaluations were conducted in order to determine if the radiographic quality was in accordance with the

applicable procedure and ASME Code requirements and to specifically verify the following: penetrometer type, size, and l

placement; penetrometer sensitivity; film density ar.d density variation; film identification; film quality; weld coverage; and,

'

disposition of the welds radiographer.

The inspector's evaluation of these radiographs indicated that the welds were properly examined and that the radiographs were adequately evaluated.

However, during these reviews, differences were noted between the ISI plan and some of the welds relative to the thickness of the weld being radiographer.

While reviewing the 5 Main Steam welds, the inspector noted that the weld thickness noted on the radiographic technique sheets for three of the welds were different from the weld thickness stated in the ISI plan.

Because the difference between the ISI plan thickness and the pipe weld thickness shown on the radiographic technique sheets resulted in a change in penetrometer requirement l

'

l

_ _ _ - _ _ _ _.

__

_ _ _ _ _ -.

. _ _ - _ _ _ -

____-________

__

- -_ __

.-

--

- _ _

- - - - - -

.-

.. - - - - _ - - - -. -. -

_

- - - - - - - - - - - -

--_-_ _

-

.

-

p l

.

!

by the ASME code, the inspector requested an explanation from knowledgeable licensee personnel.

The thickness of 2 of the

>

I welds had beei, determined ultrasonically and the third weld thickness had been established by physical measurement.

All three of the welds were determined to be thicker than what was j

stated in the ISI plan and as a result of this determination the l

penetrometer. requirement was based on the actual weld thickness.

l The inspector reviewed the two ultrasonic thickness reports and the statement of physical measurement for the third weld.

The l

l change of penetrometer requirement in all three cases was in accordance with the ASME code.

The licensee is revising the ISI plan to reflect the actual weld thickness for these three welds.

The inspector confirmed the calibration watus for Densitometers MCQA-1479 and MCQA-1640 to ascertain whether the documentation was complete and accurate.

The inspector verified the qualifications for S radiographic examiners.

The qualifications were reviewed for the following:

employer's name; person certified; activity qualified to perform; effective period of certification; and, annual visual acuity and periodic decertification.

(2) The inspector independently evaluated the EC examination dd,t for 100 SG tubes.

A random sample of 25 tubes.in each of tle * SG's were evaluated in order to determine adherence to the applicable procedures and the Code in the following areas:

method for maximum sensitive is applied; method of examination has been recorded; examination equipment has been calibrated in accordance with the applicable performance reference; amplitude and phase angle have been calibrated with the proper calibration reference and is recalibrates at predetermined frequency; required coverage of steam generator tubes occurs curing the examination; acceptance criteria is specified or referenced and is consistent with the procedure or the ASME Code; and, results are consistent with the acceptance criteria.

The inspector's evaluation indicated that the tubes appeared to be correctly evaluated by the analysts and that any noted indications were being reported as required.

d.

Data Review and Evaluation, Unit 2 (73755)

(1) Records of completed ISI nondestructive examination:s for 30 PT, 10 MT, 27 UT, and 10 RT examinations were selected and reviewed to ascertain whether:

the methods (s), technique, and extent of the examination complied with the ISI plan and applicable NDE procedures; findings were properly recorded and evaluated by qualified personnel; programmatic deviations were recorded as required; personnel, instruments, calibration blocks, and NDE materials (penetrants, couplants) were designated.

- - - _ _ _ _ _ _ _

-

- - _.

.

..

_

_

. _ _ _ _ _ _ _ _ _ _ _ _ - _

__-

L.

-

\\

,-

,

.

,

.

(2) The inspector reviewed the eddy current data analysis results and l

a sample of associated completed records for 200 SG tubes. Fifty tubes from each of the four SG's were selected for this review.

The reviews were compared with the applicable procedures and the ASME B&PV Code in the following areas: the multichannel eddy current examination equipment has been identified; material permeability has been recorded; method of examination has been recorded; and, results are consistent with acceptance criteria.

No discrepancies were found which would have significant impact on the results of the examinations.

I In the areas inspected, violations or deviations were not identified.

3.

Exit Interview L

The inspection scope and results were summarized on August 25, 1989, with those persons indicated in paragraph 1.

The inspector described the areas l

inspected and discussed in detail the inspection results.

Dissenting comments were not received from the licensee.

4.

Acronyms and Initialisms ASME -

American Society of Mechanical Engineers B&PV Boiler and Pressure Vessel

-

Babcock and Wilcox B&W

-

Distance Amplitude Curve DAC

-

Duke Power Company DPC

-

Eddy Current EC

-

Inservice Inspection ISI

-

Magnetic particle MT

-

Nondestructive Examination

,

NDE

-

. Nuclear Regulatory Commission NRC

-

PT

-

Liquid penetrant Quality Assurance QA

-

Revision R

-

RT

-

Radiography Steam Generator SG

-

UT

-

Ultrasonic l

- -. _ _ _ _ - - - _ - - _ - _ _ _ _ _ _ _. _ _