Annual Assessment Letter - McGuire Nuclear Station (NRC Inspection Report 05000369-06-001 and 05000370-06-001) - Inspection/Activity Report 03-01/2006 - 09/30/2007
ML060610587
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 03/02/2006
From: Ernstes M
NRC/RGN-II/DRP/RPB1
To: Gordon Peterson
Duke Energy Corp
Shared Package
ML060610567 List:
References
IR-06-001
Download: ML060610587 (2)


Text

Page 1 of 2 McGuire 03/02/2006 14:01:56 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP 7111121 Component Design Bases Inspection 03/06/2006 03/10/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 03/20/2006 03/24/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 04/03/2006 04/07/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 04/17/2006 04/21/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 05/15/2006 05/19/2006 Baseline Inspections ISFSI-O - 60855.1 - OPERATION OF AN ISFSI 1 1 IP 6085 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/03/2006 07/07/2006 Other Routine PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/28/2006 08/30/2006 Baseline Inspections PSB1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/25/2006 09/29/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 10/01/2006 10/06/2006 Baseline Inspections EB3TI150 - 2515/150 U-2: RPV & VHP NOZZLES 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 10/02/2006 10/06/2006 Safety Issues PSB1-RP - RP BASELINE OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/02/2006 10/06/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/02/2006 10/06/2006 Baseline Inspections PSB2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL PRE INSP VISIT 7 1, 2 IP 7111105T Fire Protection [Triennial] 10/31/2006 11/02/2006 Baseline Inspections This report does not include INPO and OUTAGE activitie Enclosure This report shows only on-site and announced inspection procedure Page 2 of 2 McGuire 03/02/2006 14:01:56 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-TFP - FIRE PROTECTION-TRIENNIAL 4 1, 2 IP 7111105T Fire Protection [Triennial] 11/27/2006 12/01/2006 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 12/11/2006 12/15/2006 Baseline Inspections PB1-PI&R - BIENNAL PI&R INSPECTION 4 1, 2 IP 71152B Identification and Resolution of Problems 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/05/2007 02/09/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 02/12/2007 02/16/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23235 MCGUIRE/EXAMS AT POWER FACILITIES 02/26/2007 03/02/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23235 MCGUIRE/EXAMS AT POWER FACILITIES 03/19/2007 03/30/2007 Not Applicable EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/26/2007 03/30/2007 Baseline Inspections EB3TI150 - 2515/150 U-1: RPV & VHP NOZZLES 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03- 03/26/2007 03/30/2007 Safety Issues EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/02/2007 04/06/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/08/2007 04/13/2007 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 04/23/2007 04/27/2007 Baseline Inspections EB3-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 06/04/2007 06/08/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/31/2007 08/02/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSP 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/27/2007 08/31/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/27/2007 08/31/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/27/2007 08/31/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 08/27/2007 08/31/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/27/2007 08/31/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.