IR 05000369/1988012
| ML20204H279 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/06/1988 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8810240372 | |
| Download: ML20204H279 (1) | |
Text
_ _ - -
- - - - - - - - -
.-
-
_
.
~
OCT 0C MB
,
Docket Nos. 50-369, 50-370 License Nos. NPF-9, NPF-17
/DukePowerCompany ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT: REPORT N05. 50-369/88-12 AND 50-370/88-12 Thank you for your revised response of September 21, 1988, to our Notice of Violation issued on June 6,1988, concerr.'ing activities conducted at your McGuire facility.
We have evaluated your response and fuund that it meets the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
In Section 4 of your response, Corrective Steps to be taken to avoid further violations, you refer to Technical Specification 4.7.1.2.b.3.
We understand that the Technical Specification referenced should have been 4.7.1.2.b.2.
We appreciate your cooperation in this matter.
Sincerely, ORIGINAL SIGNED BY VIRGIL L BRCWNLEE Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects cc:!. L. McConnell, Station Manager T
Wenfor Resident Inspector - Catawba State of South Carolina bec:IRCResidentInspector DRS, Technical Assistant VD. Hood, NRR Document Control Desk 0G10240372 8G1006 DR ADOCK O'300
R!!
g RIL A Af/
I 886nser TPeebles 10/8f/83 10/j/88 i
40 t
.r:eoi