IR 05000369/2014001
| ML15063A504 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 03/04/2015 |
| From: | Frank Ehrhardt NRC/RGN-III/DRP/B1 |
| To: | Capps S Duke Energy Carolinas |
| References | |
| IR 2014001 | |
| Download: ML15063A504 (6) | |
Text
March 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2014001 AND 05000370/2014001)
Dear Mr. Capps:
On February 10, 2015, the NRC completed its end-of-cycle performance review of the McGuire Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, McGuire Nuclear Station was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at McGuire Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Please contact me at 404-997-4611 with any questions you have regarding this letter.
Sincerely,
/RA/
Frank Ehrhardt, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17
Enclosure: McGuire Inspection/Activity Plan
(03/01/2015 - 06/30/2016)
cc distribution via ListServ
_________________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP
SIGNATURE
/RA J By GW1/
/RA By FJE/
NAME JWorosilo FEhrhardt
DATE 3/2/2015 3/2/2015
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Steven from Frank Ehrhardt dated March 4, 2015
SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2014001 AND 05000370/2014001)
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 2 03/04/2015 09:50:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire Inspection / Activity Plan 03/01/2015 - 06/30/2016 OL EXAM
- INITIAL LICENSE EXAM PREP
1 MCGUIRE/APRIL 2015 INITIAL EXAM AT POWER FACILITIES V23452 03/30/2015 04/03/2015 CDBI
- COMPONENT DESIGN BASES INSPECTION
1, 2 IP Component Design Bases Inspection 7111121 04/06/2015 04/10/2015 1, 2 IP Component Design Bases Inspection 7111121 04/27/2015 05/01/2015 1, 2 IP Component Design Bases Inspection 7111121 05/11/2015 05/15/2015 1, 2 IP Component Design Bases Inspection 7111121 06/01/2015 06/05/2015 OL EXAM
- INITIAL LICENSE EXAM
1 MCGUIRE/APRIL 2015 INITIAL EXAM AT POWER FACILITIES V23452 04/27/2015 05/08/2015 RP
- RP PUBLIC RAD SAFETY BASELINE
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/22/2015 06/26/2015 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/22/2015 06/26/2015 1, 2 IP Performance Indicator Verification 71151 06/22/2015 06/26/2015 HS
- TRIENNIAL HEAT SINK PERFORMANCE
1, 2 IP Heat Sink Performance 7111107T 07/13/2015 07/17/2015 EP
- EP EXERCISE
1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 08/03/2015 08/07/2015 1, 2 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 08/03/2015 08/07/2015 1, 2 IP Performance Indicator Verification 71151 08/03/2015 08/07/2015 ISI
- UNIT 2 IN-SERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 09/21/2015 09/25/2015 RP
- RAD HAZARDS ANALYSIS AND TRANSPORTATION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/21/2015 09/25/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 09/21/2015 09/25/2015 1, 2 IP Performance Indicator Verification 71151 09/21/2015 09/25/2015 TFPI
- TRIENNIAL FIRE PROTECTION INSP
1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 11/16/2015 11/20/2015 1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 12/07/2015 12/11/2015 OL EXAM
- INITIAL LICENSE EXAM PREP
1 MCGUIRE MARCH 2016 INITIAL EXAM AT POWER FACILITIES V23467 02/29/2016 03/04/2016 RP
- RP OCCUPATIONAL INSPECTION WEEK 1
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/14/2016 03/20/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/14/2016 03/20/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/14/2016 03/20/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 03/04/2015 09:50:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire Inspection / Activity Plan 03/01/2015 - 06/30/2016 RP
- RP OCCUPATIONAL INSPECTION WEEK 1
1, 2 IP Occupational Dose Assessment 71124.04 03/14/2016 03/20/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/14/2016 03/20/2016 1, 2 IP Performance Indicator Verification 71151 03/14/2016 03/20/2016 ISI
- UNIT 1 IN-SERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 03/28/2016 04/01/2016 RP
- RP OCCUPATIONAL INSPECTION WEEK 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/28/2016 04/01/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/28/2016 04/01/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/28/2016 04/01/2016 1, 2 IP Occupational Dose Assessment 71124.04 03/28/2016 04/01/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/28/2016 04/01/2016 1, 2 IP Performance Indicator Verification 71151 03/28/2016 04/01/2016 OL EXAM
- INITIAL LICENSE EXAM
1 MCGUIRE MARCH 2016 INITIAL EXAM AT POWER FACILITIES V23467 03/28/2016 04/08/2016 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
1, 2 IP Problem Identification and Resolution 71152B 05/02/2016 05/06/2016 1, 2 IP Problem Identification and Resolution 71152B 05/16/2016 05/20/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.