IR 05000369/1988011
| ML20154M049 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 05/19/1988 |
| From: | Ennis J, Mcguire D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20154M026 | List: |
| References | |
| 50-369-88-11, 50-370-88-11, NUDOCS 8806010156 | |
| Download: ML20154M049 (1) | |
Text
w tGUARpe'NFOR's ~j o y
.
.
.
UNITED STATES l4g>AM49'q, NUCLE A3 REGULATORY COMMISSION
'7" PECtONil
g 101 MARIETTA STREET, N.W.
- !
,g
$
AT L ANTA, G EORGI A 30323
,
%4.... /
MAY 201988 Report Nos.:
E0-369/88-11 and 50-370/88 11 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.; 50-369 and 50-370 License No.:
NPF-9 and NPF-17 Facility Name:
McGuire Units 1 and 2 Inspection nducyd: April 18-22, 1988 Inspector:j fE!} 9 f 77__
s Je r
Ennis Physical Security inspector D' ate Signed Approved by:
d L
/Q[ff D. R. McGuire7 Chief, Physical Security Section Da M &itfned t
Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards
'
SUMMARY Scope: This routine, unannounced, physical security ir,spection examined the areas of:
Security Plan and Implementing Proceciures; Security Organization; Locks, Keys, and Combinations; Physical Barriers-Vital Areas; Compensatory Measures; Assessment Aids; Access Control-Personnel and Packages; and Safeguards Contingency Plan Implementation Review.
Results: Violations were identified in the areas of Access Control-Personnel and Compensatory Measures.
FNCLOSURE CO SAFEGUARDS NS
SpfEG@
p T\\
UPON
'n CIPARAT ATION-ac !?Hmm !5 cos Til u
60hh un.
.
. - -
- - -
_ - - _ -
, -....