Forwards Insp Rept 50-445/85-06 on 850301-0430 & Notice of Violation
ML20133E931
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 09/12/1985
From: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20133E934 List:
References
NUDOCS 8510100067
Download: ML20133E931 (2)


See also: IR 05000301/2004030

Text

r:

_

f

7

In Reply' Refer To:

LDocket: 50-445/85-06- SEP 121985

. Texas Utilities Generating' Company

ATTN: -Mr.1 W. G.'Counsil

Executive.Vice President

400 North.0 live, L.B. 81

' Dallas, Texas 75201

Gentlemen:

- This. refers to the inspection conducted by Messrs. D. L. Kelley and W. F. Smith

of this office during the period March 1 - April 30, 1985, of activities

authorized by NRC Construction Permit CPPR-126 for.the Comanche Peak Facility,

- Unit 1, and.to the discussion of our findings with Mr. J. C. Kuykendall, and

ll lother. members of your staff at the conclusion of the inspection,

cAreas examined during the inspection included: (1) Preoperational test results

evaluation; (2) Independent inspection findings; (3) Followup on Open Items;

(4) Plant tours; and (5) Plant status. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors. These findings

are documented in the enclosed inspection report.

.During~ this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

~

this 'iolation,

v in writing, in accordance with the provisions of Section 2.201

i ' of the NRC's ." Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

e

'

We have also examined sctions you have taken with regard to previously

. identified inspection findings. The status of these items is identified in

sparagraph 4~of the enclosed report.

-

The response directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

4

- --

- - -

- . - _ -. -

RIV:SRIk RP82h C:RP82 -DRS&P NRR

DLKelley/Jj DMHunnicutt DRHunter RPDenise VSNoonanb4*

l 1 /n /85 1 /l1 /85 h / /85 4/g/ss p/ o'85

!

!

!

8510100067 85091245

l gDR

ADOCK O j

re*(

<

%

- __ _ _-_

,

,

Texas ' Utilities Electric Company -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed Gy:

Richard P. Denia

R. P. Denise, Director

Division of Reactor Safety

and Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-445/85-06

cc w/ enclosures:

Texas Utilities Electric Company

. ATTN: J. W. Beck, Manager,

Licensing

Skyway Tower

400 North Olive Street

-Lock Box 81

Dallas, Texas 75201

TEXAS STATE DEPARTMENT OF HEALTH

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB2 * MIS System
  • RRI-OPS *RSTS Operator
  • RRI-CONST *EP&RPB '
  • Section Chief (RPB2/B) R. Denise, D/DRSP

r V. Noonan, NRR R. Martin, RA

S. Treby, ELD Juanita Ellis, Pres._ CASE

  • RIV File Renea Hicks, A/ Atty General, EP Div.-TX
  • D. Weiss, LFMB (AR-2015)
  • w/766

,